rollout_eval_DP_71ep
Aborted evaluation of Yu-Zhou-Wang/dp_so_101_red_foam_ball_ep0_70 (diffusion policy,
sotac ep 0-70) on the SO-101, 11 September 2026. 2 episodes only, both scene 1-6
(bowl point 1, ball point 6), 60 s each, then the run was stopped because the policy
was not working. Kept for the record, not a full evaluation. Protocol and scene
definitions match Jingyi-Z/rollout_eval_A_71ep.
- Downloads last month
- 101