id stringlengths 7 7 | note stringlengths 60 670 | target dict | trade stringclasses 9
values | style stringclasses 4
values | tags listlengths 0 2 | source stringclasses 1
value |
|---|---|---|---|---|---|---|
tr-0001 | Um so yeah swapped out the old heating control on the furnace with one programmable thermostat and tossed in one new furnace filter plus used two wire nuts to make up the connections, took about eighty-five minutes altogether and uh the homeowner went ahead and signed off on everything before I left. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "hvac",
"laborMinutes": 85,
"materials": [
{
"name": "programmable thermostat",
"quantity": 1,
"unit": null
},
{
"name": "furnace filter",
"quantity": 1,
"unit": null
},
{
... | hvac | spoken-fillers | [
"multiple-materials"
] | synthetic |
tr-0002 | Uh so yeah got around to rolling the front entry door, used up um one quart of exterior satin finish paint, took me like uh seventy-five minutes total. | {
"customerApproved": null,
"followUps": [],
"issuesFound": [],
"jobType": "painting",
"laborMinutes": 75,
"materials": [
{
"name": "exterior satin finish paint",
"quantity": 1,
"unit": "quart"
}
],
"workPerformed": [
"Rolled front entry door"
]
} | painting | spoken-fillers | [
"approval-absent"
] | synthetic |
tr-0003 | and then i got up there and saw the cracked rubber collar around the plumbing stack was leaking right down into the attic space and so i went ahead and swapped out the old plumbing vent boot using six roofing nails and one new vent pipe boot which took eighty-five minutes and then i spent another thirty minutes caulkin... | {
"customerApproved": true,
"followUps": [
"Go back up into the attic next week to make sure everything stayed dry"
],
"issuesFound": [
"Cracked rubber collar around plumbing stack leaking into attic space"
],
"jobType": "roofing",
"laborMinutes": 115,
"materials": [
{
"name": "roofing... | roofing | run-on | [
"extra-labor"
] | synthetic |
tr-0005 | Took forever getting over here with all the road work on Maple Street, but got inside and noticed quite a bit of milky grout film left behind on the bathroom ceramic, so I tackled wiping down all the post-remodel dust in there and then put down a fresh seal on the grout joints, going through two bottles of tile wash an... | {
"customerApproved": null,
"followUps": [],
"issuesFound": [
"Milky grout film left behind on bathroom ceramic"
],
"jobType": "cleaning",
"laborMinutes": 70,
"materials": [
{
"name": "tile wash",
"quantity": 2,
"unit": "bottle"
},
{
"name": "sealer",
"quantit... | cleaning | rambling | [
"approval-absent"
] | synthetic |
tr-0006 | Nice quiet neighborhood today, though once I got the level out I ran into the main framing stud sitting completely off-center from where they wanted the screen, so I had to adjust layout and secure the wall hanging bracket with four heavy lag bolts and ran two, wait no, one in-wall cable kit down through the chase; who... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"Main framing stud sitting completely off-center from where they wanted screen"
],
"jobType": "general",
"laborMinutes": 30,
"materials": [
{
"name": "heavy lag bolts",
"quantity": 4,
"unit": null
},
{
"n... | general | rambling | [
"hours-phrasing",
"self-correction"
] | synthetic |
tr-0007 | Patched drywall puncture with 1 patch kit and mounted 1 baseboard bumper in 70 minutes. Homeowner OK'd the repair. Need to swing back to paint. | {
"customerApproved": true,
"followUps": [
"Swing back to paint"
],
"issuesFound": [],
"jobType": "general",
"laborMinutes": 70,
"materials": [
{
"name": "patch",
"quantity": 1,
"unit": "kit"
},
{
"name": "baseboard bumper",
"quantity": 1,
"unit": null
... | general | terse | [] | synthetic |
tr-0008 | and then i drove down to the supply house to pick up three carriage bolts and came back and pulled up the decayed deck planks and fastened down new boards with the hardware which took ninety minutes and then the customer refused to sign off on the job | {
"customerApproved": false,
"followUps": [],
"issuesFound": [],
"jobType": "carpentry",
"laborMinutes": 90,
"materials": [
{
"name": "carriage bolts",
"quantity": 3,
"unit": null
}
],
"workPerformed": [
"Picked up carriage bolts at the supply house",
"Pulled up decayed... | carpentry | run-on | [
"negation",
"supply-house-trip"
] | synthetic |
tr-0010 | So uh yeah the interior door handle had punched right through the sheetrock there, um so I patched up the hole using one drywall patch kit and about one tub of mud plus set up one door stop bumper, took roughly sixty-five minutes and uh the lady of the house checked it out and gave her full approval, though I gotta hea... | {
"customerApproved": true,
"followUps": [
"Head back later on to put paint over it"
],
"issuesFound": [],
"jobType": "general",
"laborMinutes": 65,
"materials": [
{
"name": "drywall patch",
"quantity": 1,
"unit": "kit"
},
{
"name": "mud",
"quantity": 1,
... | general | spoken-fillers | [
"multiple-materials"
] | synthetic |
tr-0012 | Traced slow refrigerant seepage at service port. Topped off system with 5, make that 3 pounds of R-410A over 60 minutes. Client authorized work. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"Slow refrigerant seepage at service port"
],
"jobType": "hvac",
"laborMinutes": 60,
"materials": [
{
"name": "R-410A",
"quantity": 3,
"unit": "pound"
}
],
"workPerformed": [
"Traced slow refrigerant seepag... | hvac | terse | [
"self-correction"
] | synthetic |
tr-0013 | Uh yeah finished up changing out the furnace wall thermostat and popped in two fresh furnace filters while I was at it, took eighty-five minutes from start to finish and uh customer checked the heat and gave me the official go-ahead. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "hvac",
"laborMinutes": 85,
"materials": [
{
"name": "furnace filters",
"quantity": 2,
"unit": null
}
],
"workPerformed": [
"Changed out furnace wall thermostat",
"Popped in fresh furnace filters... | hvac | spoken-fillers | [] | synthetic |
tr-0015 | Found frost buildup choking evaporator coils and swapped out defrost timer using 1 replacement unit. Took two hours, no, four hours; homeowner gave final sign-off. Customer to notify us if frost returns. | {
"customerApproved": true,
"followUps": [
"Customer to notify us if frost returns"
],
"issuesFound": [
"Frost buildup choking evaporator coils"
],
"jobType": "appliance",
"laborMinutes": 240,
"materials": [
{
"name": "replacement unit",
"quantity": 1,
"unit": null
}
... | appliance | terse | [
"hours-phrasing",
"self-correction"
] | synthetic |
tr-0017 | uh so yeah finished up painting the bedroom walls took about 90 minutes all together um had to run down to the supply house quick to grab two gallons of interior eggshell paint which is what I put on the walls oh and uh thought I would need the painter's tape but didn't need it after all noticed a water stain up on the... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"water stain on the ceiling corner"
],
"jobType": "painting",
"laborMinutes": 90,
"materials": [
{
"name": "interior eggshell paint",
"quantity": 2,
"unit": "gallon"
}
],
"workPerformed": [
"Picked up inter... | painting | spoken-fillers | [
"negation",
"supply-house-trip"
] | synthetic |
tr-0018 | Doorknob had punched through the drywall so patched the hole and installed 1 door stop. Job took 90 minutes. Customer inspected and gave the go-ahead. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "general",
"laborMinutes": 90,
"materials": [
{
"name": "door stop",
"quantity": 1,
"unit": null
}
],
"workPerformed": [
"Patched the hole",
"Installed door stop"
]
} | general | terse | [] | synthetic |
tr-0019 | went ahead and painted the bedroom walls and it took 90 minutes and then the customer checked the room and gave their stamp of approval | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "painting",
"laborMinutes": 90,
"materials": [],
"workPerformed": [
"Painted bedroom walls"
]
} | painting | run-on | [
"no-materials"
] | synthetic |
tr-0020 | Spotted peeling paint on door trim and painted front door with 2 quarts of exterior satin paint taking 4 hours. Client signed the work order. Second coat once the first cures. | {
"customerApproved": true,
"followUps": [
"Second coat once the first cures"
],
"issuesFound": [
"peeling paint on door trim"
],
"jobType": "painting",
"laborMinutes": 240,
"materials": [
{
"name": "exterior satin paint",
"quantity": 2,
"unit": "quart"
}
],
"workPe... | painting | terse | [
"hours-phrasing"
] | synthetic |
tr-0023 | Traffic out to the place was terrible this morning, but it is a really neat house with lots of character. I installed the ceiling light fixture and added a new wall switch, using 1 fan-rated ceiling box to get it mounted properly. Ended up that I didn't need the single pole switch after all. The whole thing took three ... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "electrical",
"laborMinutes": 45,
"materials": [
{
"name": "fan-rated ceiling box",
"quantity": 1,
"unit": null
}
],
"workPerformed": [
"Installed ceiling light fixture",
"Added new wall switch"
... | electrical | rambling | [
"hours-phrasing",
"negation"
] | synthetic |
tr-0024 | Swapped out the tripping breaker. Took 30 minutes, wait, 60 minutes. Customer verified power and signed off on the ticket. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "electrical",
"laborMinutes": 60,
"materials": [],
"workPerformed": [
"Swapped out the tripping breaker"
]
} | electrical | terse | [
"no-materials",
"self-correction"
] | synthetic |
tr-0025 | Finished replacing kitchen sink P-trap and tightened supply line connections using 1 PVC P-trap kit, 2 slip joint washers, 2 braided supply lines, and 1 roll of plumber's tape. Job took 85 minutes. Customer inspected for leaks and gave written sign-off. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "plumbing",
"laborMinutes": 85,
"materials": [
{
"name": "PVC P-trap",
"quantity": 1,
"unit": "kit"
},
{
"name": "slip joint washers",
"quantity": 2,
"unit": null
},
{
"na... | plumbing | terse | [
"multiple-materials"
] | synthetic |
tr-0026 | The drive out to the property was pretty scenic with all the fall trees turning color. Got up on the roof and replaced the missing shingles using some roofing cement, and while I was working near the stack I noticed cracked flashing sealant at the chimney. I spent 105 minutes on the job, actually make that 90 minutes a... | {
"customerApproved": null,
"followUps": [
"Inspect again after the next storm to see how everything holds up"
],
"issuesFound": [
"cracked flashing sealant at the chimney"
],
"jobType": "roofing",
"laborMinutes": 90,
"materials": [
{
"name": "roofing cement",
"quantity": null,
... | roofing | rambling | [
"approval-absent",
"self-correction"
] | synthetic |
tr-0028 | yeah so uh I wrapped up the front door got it painted and it took 85 minutes um had to run out to the supply house to pick up the sanding sponges ended up using 3 sanding sponges and 2 quarts of exterior satin paint and uh the customer looked over the paint job and approved the work will head back for the second coat o... | {
"customerApproved": true,
"followUps": [
"Head back for the second coat once the first cures"
],
"issuesFound": [],
"jobType": "painting",
"laborMinutes": 85,
"materials": [
{
"name": "sanding sponges",
"quantity": 3,
"unit": null
},
{
"name": "exterior satin pain... | painting | spoken-fillers | [
"supply-house-trip"
] | synthetic |
tr-0029 | Put in new kitchen sink P-trap with 1 PVC P-trap kit, 3 slip joint washers, and 1 roll of plumber's tape. Work took 55 minutes. Client signed off on the finished work. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "plumbing",
"laborMinutes": 55,
"materials": [
{
"name": "PVC P-trap",
"quantity": 1,
"unit": "kit"
},
{
"name": "slip joint washers",
"quantity": 3,
"unit": null
},
{
"na... | plumbing | terse | [
"multiple-materials"
] | synthetic |
tr-0030 | Encountered a stud offset from the center of the wall but mounted TV bracket using 4 lag bolts and 1 in-wall cable kit. Job duration 2 hours. Homeowner reviewed the mounting and gave full approval. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"stud offset from the center of the wall"
],
"jobType": "general",
"laborMinutes": 120,
"materials": [
{
"name": "lag bolts",
"quantity": 4,
"unit": null
},
{
"name": "in-wall cable",
"quantity": 1,... | general | terse | [
"hours-phrasing"
] | synthetic |
tr-0032 | Traffic on the interstate was absolute murder getting out to this property today, nice quiet neighborhood though once you arrive. Tracked down a slow refrigerant leak right at the service valve, so I had to recharge the AC refrigerant, which took 85 minutes for the main repair. I also took 40 minutes to wash down the c... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"slow refrigerant leak right at the service valve"
],
"jobType": "hvac",
"laborMinutes": 125,
"materials": [
{
"name": "coil cleaner",
"quantity": null,
"unit": null
},
{
"name": "R-410A refrigerant",
... | hvac | rambling | [
"extra-labor",
"supply-house-trip"
] | synthetic |
tr-0033 | uh so yeah just finished up here um replaced the dryer heating element on the unit had to run to the supply house to pick up foil tape because my truck was empty so used 3 no wait just 1 roll of foil tape on the job altogether it took 80 minutes and uh the lady of the house checked it over and gave me the go-ahead | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "appliance",
"laborMinutes": 80,
"materials": [
{
"name": "foil tape",
"quantity": 1,
"unit": "roll"
}
],
"workPerformed": [
"Replaced dryer heating element",
"Picked up foil tape at the supply h... | appliance | spoken-fillers | [
"self-correction",
"supply-house-trip"
] | synthetic |
tr-0034 | Found corroded thermostat wiring and replaced furnace thermostat in 40 minutes using 1 programmable thermostat and 2 furnace filters. Homeowner OK'd the work. Still need to schedule fall tune-up. | {
"customerApproved": true,
"followUps": [
"Schedule fall tune-up"
],
"issuesFound": [
"corroded thermostat wiring"
],
"jobType": "hvac",
"laborMinutes": 40,
"materials": [
{
"name": "programmable thermostat",
"quantity": 1,
"unit": null
},
{
"name": "furnace ... | hvac | terse | [] | synthetic |
tr-0035 | Long drive out into the country this morning, beautiful old farmhouse with huge oak trees shading the backyard. Pulled up the bad wood and discovered a rotted joist end under two boards, then replaced the rotted deck boards. I had to make a run to the supply house to pick up 5 5/4 deck boards for the decking. Spent 90 ... | {
"customerApproved": true,
"followUps": [
"Quote sistering the joist down the road"
],
"issuesFound": [
"rotted joist end under two boards"
],
"jobType": "carpentry",
"laborMinutes": 90,
"materials": [
{
"name": "5/4 deck boards",
"quantity": 5,
"unit": null
}
],
"... | carpentry | rambling | [
"supply-house-trip"
] | synthetic |
tr-0037 | The drive over through the morning construction was pretty sluggish, but the clients have done a gorgeous remodel on their master suite with some lovely fixtures. When I got in there I noticed hazy grout residue on the tile, so I cleaned post-renovation dust from the bathroom and sealed grout lines using 1 bottle of gr... | {
"customerApproved": null,
"followUps": [],
"issuesFound": [
"hazy grout residue on the tile"
],
"jobType": "cleaning",
"laborMinutes": 45,
"materials": [
{
"name": "grout sealer",
"quantity": 1,
"unit": "bottle"
}
],
"workPerformed": [
"Cleaned post-renovation dust ... | cleaning | rambling | [
"approval-absent",
"hours-phrasing"
] | synthetic |
tr-0038 | um so yeah got out here and there was peeling paint on the door trim uh so I sanded peeling trim and painted front door using 2 quarts of exterior satin paint the work took 85 minutes uh still need to put on a second coat once the first cures | {
"customerApproved": null,
"followUps": [
"Put on a second coat once the first cures"
],
"issuesFound": [
"peeling paint on the door trim"
],
"jobType": "painting",
"laborMinutes": 85,
"materials": [
{
"name": "exterior satin paint",
"quantity": 2,
"unit": "quart"
}
... | painting | spoken-fillers | [
"approval-absent"
] | synthetic |
tr-0039 | Stud offset from the center of the wall, mounted TV bracket in 55 minutes using 5, no 4 lag bolts. Client gave final sign-off. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"stud offset from the center of the wall"
],
"jobType": "general",
"laborMinutes": 55,
"materials": [
{
"name": "lag bolts",
"quantity": 4,
"unit": null
}
],
"workPerformed": [
"Mounted TV bracket"
]
} | general | terse | [
"self-correction"
] | synthetic |
tr-0040 | uh so yeah wrapped up in the room um painted bedroom walls went through 2 rolls of painter's tape and 1 tub of spackle plus 2 gallons of interior eggshell paint taking 90 minutes homeowner agreed everything looked great and OK'd it uh still to do later touch up after the furniture is back | {
"customerApproved": true,
"followUps": [
"Touch up after the furniture is back"
],
"issuesFound": [],
"jobType": "painting",
"laborMinutes": 90,
"materials": [
{
"name": "painter's tape",
"quantity": 2,
"unit": "roll"
},
{
"name": "spackle",
"quantity": 1,
... | painting | spoken-fillers | [
"multiple-materials"
] | synthetic |
tr-0041 | found a leaking slip nut on the P-trap and then made a run to the supply house to pick up 1 PVC P-trap kit and replaced kitchen sink P-trap which took an hour and a half and the customer signed the job slip and then we have to check for leaks next week | {
"customerApproved": true,
"followUps": [
"Check for leaks next week"
],
"issuesFound": [
"leaking slip nut on the P-trap"
],
"jobType": "plumbing",
"laborMinutes": 90,
"materials": [
{
"name": "PVC P-trap",
"quantity": 1,
"unit": "kit"
}
],
"workPerformed": [
... | plumbing | run-on | [
"hours-phrasing",
"supply-house-trip"
] | synthetic |
tr-0043 | Replaced tripping breaker in 60 minutes using 2 20 amp breakers, 21 feet of 12 gauge wire, and 3 wire nuts. Tightened panel neutral connections for another 15 minutes. Resident formally signed off; still need to recommend panel replacement quote. | {
"customerApproved": true,
"followUps": [
"Recommend panel replacement quote"
],
"issuesFound": [],
"jobType": "electrical",
"laborMinutes": 75,
"materials": [
{
"name": "20 amp breakers",
"quantity": 2,
"unit": null
},
{
"name": "12 gauge wire",
"quantity": ... | electrical | terse | [
"extra-labor",
"multiple-materials"
] | synthetic |
tr-0045 | Took the scenic backroads on the way over because of some roadwork, really charming older brick home with a cute dog that barked the whole time I was in the laundry closet. I replaced the dryer heating element using 1 dryer heating element and cleaned the dryer vent, spending 70 minutes on the whole job, and we still n... | {
"customerApproved": null,
"followUps": [
"Recommend annual vent cleaning down the road"
],
"issuesFound": [],
"jobType": "appliance",
"laborMinutes": 70,
"materials": [
{
"name": "dryer heating element",
"quantity": 1,
"unit": null
}
],
"workPerformed": [
"Replaced ... | appliance | rambling | [
"approval-absent"
] | synthetic |
tr-0046 | uh so yeah got out to the site and um pulled the old rod out and put in 1 magnesium anode rod with some thread sealant on the threads and then went ahead and drained and flushed the water heater tank whole job took about two and a half hours and the homeowner signed off on everything um still need to send over a quote ... | {
"customerApproved": true,
"followUps": [
"Send over a quote for a new water heater later"
],
"issuesFound": [],
"jobType": "plumbing",
"laborMinutes": 150,
"materials": [
{
"name": "magnesium anode rod",
"quantity": 1,
"unit": null
},
{
"name": "thread sealant",
... | plumbing | spoken-fillers | [
"hours-phrasing"
] | synthetic |
tr-0047 | so yeah started under the kitchen sink and saw a corroded trap arm so uh swapped out the kitchen sink p-trap which took 40 minutes and um used 2 braided supply lines and 3 no 1 roll of plumber's tape and then uh spent another 20 minutes tightening the supply line connections customer looked it over and gave their full ... | {
"customerApproved": true,
"followUps": [
"Swing back by to check for leaks next week"
],
"issuesFound": [
"corroded trap arm"
],
"jobType": "plumbing",
"laborMinutes": 60,
"materials": [
{
"name": "braided supply lines",
"quantity": 2,
"unit": null
},
{
"nam... | plumbing | spoken-fillers | [
"extra-labor",
"self-correction"
] | synthetic |
tr-0048 | got right on the unit and recharged the ac refrigerant using 4 pounds of r-410a refrigerant which took 65 minutes and then cleaned the condenser coil using some coil cleaner which took another 45 minutes and then the owner checked the cooling and signed the paperwork to ok the job | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "hvac",
"laborMinutes": 110,
"materials": [
{
"name": "r-410a refrigerant",
"quantity": 4,
"unit": "pound"
},
{
"name": "coil cleaner",
"quantity": null,
"unit": null
}
],
"work... | hvac | run-on | [
"extra-labor"
] | synthetic |
tr-0049 | Traffic on the expressway was brutal this morning but I finally made it to the client's house. I spent 75 minutes, actually no it was 60 minutes patching the drywall hole using 1 tub of joint compound, and then I took another 30 minutes to install 1 door stop so the handle won't hit the wall again. The homeowner came b... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "general",
"laborMinutes": 90,
"materials": [
{
"name": "joint compound",
"quantity": 1,
"unit": "tub"
},
{
"name": "door stop",
"quantity": 1,
"unit": null
}
],
"workPerformed"... | general | rambling | [
"extra-labor",
"self-correction"
] | synthetic |
tr-0050 | Painted bedroom walls using 1 tub of spackle, 1 roll of painter's tape, and 3 gallons of interior eggshell paint. Completed in 90 minutes. Client inspected and officially authorized the completed work. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "painting",
"laborMinutes": 90,
"materials": [
{
"name": "spackle",
"quantity": 1,
"unit": "tub"
},
{
"name": "painter's tape",
"quantity": 1,
"unit": "roll"
},
{
"name": ... | painting | terse | [
"multiple-materials"
] | synthetic |
tr-0051 | crawled under the cabinet and replaced the kitchen sink p-trap using 1 roll of plumber's tape and 3 no 2 slip joint washers and 2 braided supply lines and then wrapped the job up in 35 minutes and then the customer gave their stamp of approval | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "plumbing",
"laborMinutes": 35,
"materials": [
{
"name": "plumber's tape",
"quantity": 1,
"unit": "roll"
},
{
"name": "slip joint washers",
"quantity": 2,
"unit": null
},
{
... | plumbing | run-on | [
"multiple-materials",
"self-correction"
] | synthetic |
tr-0052 | Had a nice scenic drive out to the property today, very quiet neighborhood. I patched the nail holes with 1 tub of spackle and painted the bedroom walls using 1, no 2 gallons of interior eggshell paint, taking 90 minutes total. The homeowner inspected the room and signed off on the invoice, though I still need to touch... | {
"customerApproved": true,
"followUps": [
"Touch up after the furniture is back"
],
"issuesFound": [],
"jobType": "painting",
"laborMinutes": 90,
"materials": [
{
"name": "spackle",
"quantity": 1,
"unit": "tub"
},
{
"name": "interior eggshell paint",
"quantit... | painting | rambling | [
"self-correction"
] | synthetic |
tr-0054 | went ahead and replaced the kitchen sink p-trap and then tightened supply line connections using some plumber's tape and 2 braided supply lines and finished everything in 60 minutes and then still have to check for leaks next week | {
"customerApproved": null,
"followUps": [
"Check for leaks next week"
],
"issuesFound": [],
"jobType": "plumbing",
"laborMinutes": 60,
"materials": [
{
"name": "plumber's tape",
"quantity": null,
"unit": null
},
{
"name": "braided supply lines",
"quantity": 2... | plumbing | run-on | [
"approval-absent"
] | synthetic |
tr-0055 | spotted a water stain on the ceiling corner and then painted the bedroom walls using 1 tub of spackle and 1 roll of painter's tape and 2 gallons of interior eggshell paint and finished in 75 minutes no make that 90 minutes and then the customer gave the green light and approved everything and then still need to touch u... | {
"customerApproved": true,
"followUps": [
"Touch up after the furniture is back"
],
"issuesFound": [
"water stain on the ceiling corner"
],
"jobType": "painting",
"laborMinutes": 90,
"materials": [
{
"name": "spackle",
"quantity": 1,
"unit": "tub"
},
{
"name"... | painting | run-on | [
"multiple-materials",
"self-correction"
] | synthetic |
tr-0056 | Found heavy sediment in the tank, ran to supply house for some thread sealant, and replaced water heater anode rod in 80 minutes. Flushed water heater tank which took another 25 minutes. Client gave written sign-off, must quote a new water heater later. | {
"customerApproved": true,
"followUps": [
"Quote a new water heater later"
],
"issuesFound": [
"heavy sediment in the tank"
],
"jobType": "plumbing",
"laborMinutes": 105,
"materials": [
{
"name": "thread sealant",
"quantity": null,
"unit": null
}
],
"workPerformed"... | plumbing | terse | [
"extra-labor",
"supply-house-trip"
] | synthetic |
tr-0057 | made a run to the supply house to pick up 4 lag bolts and mounted the tv bracket which took 85 minutes and then hid tv cables in wall which took another 45 minutes and then the homeowner inspected everything and confirmed their approval | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "general",
"laborMinutes": 130,
"materials": [
{
"name": "lag bolts",
"quantity": 4,
"unit": null
}
],
"workPerformed": [
"Picked up lag bolts at the supply house",
"Mounted tv bracket",
"Hid... | general | run-on | [
"extra-labor",
"supply-house-trip"
] | synthetic |
tr-0058 | Found burnt-out heating element and replaced dryer heating element. Made a supply house run to pick up 9 feet of rigid duct and cleaned dryer vent. | {
"customerApproved": null,
"followUps": [],
"issuesFound": [
"burnt-out heating element"
],
"jobType": "appliance",
"laborMinutes": null,
"materials": [
{
"name": "rigid duct",
"quantity": 9,
"unit": "feet"
}
],
"workPerformed": [
"Replaced dryer heating element",
... | appliance | terse | [
"approval-absent",
"supply-house-trip"
] | synthetic |
tr-0059 | headed over to the supply house first thing to grab 2 melamine shelf boards and then installed closet shelving in 75 minutes and then the customer reviewed the closet and gave their formal acceptance | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "carpentry",
"laborMinutes": 75,
"materials": [
{
"name": "melamine shelf boards",
"quantity": 2,
"unit": null
}
],
"workPerformed": [
"Picked up melamine shelf boards at the supply house",
"Inst... | carpentry | run-on | [
"supply-house-trip"
] | synthetic |
tr-0060 | um so yeah got started and realized there was a stud offset from the center of the wall so uh mounted the tv bracket with 1 tv wall mount and 1 in-wall cable kit and 4 lag bolts and yeah finished up in 75 minutes | {
"customerApproved": null,
"followUps": [],
"issuesFound": [
"stud offset from the center of the wall"
],
"jobType": "general",
"laborMinutes": 75,
"materials": [
{
"name": "tv wall mount",
"quantity": 1,
"unit": null
},
{
"name": "in-wall cable",
"quantity":... | general | spoken-fillers | [
"approval-absent",
"multiple-materials"
] | synthetic |
tr-0062 | found that the terminal on the breaker was badly scorched causing it to trip constantly and so I replaced the tripping breaker with one 20 amp breaker and then pulled twenty-four feet of 12 gauge wire and then secured the connections with seven wire nuts and the job took 60 minutes and then the customer inspected every... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"badly scorched terminal on the breaker"
],
"jobType": "electrical",
"laborMinutes": 60,
"materials": [
{
"name": "20 amp breaker",
"quantity": 1,
"unit": null
},
{
"name": "12 gauge wire",
"quantit... | electrical | run-on | [
"multiple-materials"
] | synthetic |
tr-0063 | Um, so yeah, I looked over the dryer and found, uh, a burnt-out heating element, so, uh, I replaced the dryer heating element, but, um, actually it turns out I didn't need the dryer heating element after all, and, uh, for materials I used six feet of rigid duct and one roll of foil tape, so yeah, the job took 60 minute... | {
"customerApproved": null,
"followUps": [],
"issuesFound": [
"burnt-out heating element"
],
"jobType": "appliance",
"laborMinutes": 60,
"materials": [
{
"name": "rigid duct",
"quantity": 6,
"unit": "feet"
},
{
"name": "foil tape",
"quantity": 1,
"unit":... | appliance | spoken-fillers | [
"approval-absent",
"negation"
] | synthetic |
tr-0064 | went ahead and steam cleaned the living room carpet using one gallon of carpet shampoo and then treated spots with two bottles of enzyme stain remover and then finished the area with one bottle of carpet deodorizer and the whole job took 75 minutes and then the homeowner checked the floor and gave her final OK | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "cleaning",
"laborMinutes": 75,
"materials": [
{
"name": "carpet shampoo",
"quantity": 1,
"unit": "gallon"
},
{
"name": "enzyme stain remover",
"quantity": 2,
"unit": "bottle"
},
... | cleaning | run-on | [
"multiple-materials"
] | synthetic |
tr-0065 | Doorknob punched through drywall. Patched drywall hole using one drywall patch kit, some joint compound, and one door stop. Customer reviewed the work and signed the sign-off sheet. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "general",
"laborMinutes": null,
"materials": [
{
"name": "drywall patch",
"quantity": 1,
"unit": "kit"
},
{
"name": "joint compound",
"quantity": null,
"unit": null
},
{
... | general | terse | [
"multiple-materials"
] | synthetic |
tr-0066 | Replaced refrigerator defrost timer using 2, no 1 defrost timer in two hours. Owner OK'd the service. Call back if the freezer ices again. | {
"customerApproved": true,
"followUps": [
"Call back if the freezer ices again"
],
"issuesFound": [],
"jobType": "appliance",
"laborMinutes": 120,
"materials": [
{
"name": "defrost timer",
"quantity": 1,
"unit": null
}
],
"workPerformed": [
"Replaced refrigerator def... | appliance | terse | [
"hours-phrasing",
"self-correction"
] | synthetic |
tr-0067 | pulled back the deck boards and discovered a rotted joist end under two boards and then replaced the rotted deck boards and then re-fastened the loose railing post using two carriage bolts and the whole job took 90 minutes and then the homeowner signed the completion form and then I still need to quote sistering the jo... | {
"customerApproved": true,
"followUps": [
"Quote sistering the joist"
],
"issuesFound": [
"rotted joist end under two boards"
],
"jobType": "carpentry",
"laborMinutes": 90,
"materials": [
{
"name": "carriage bolts",
"quantity": 2,
"unit": null
}
],
"workPerformed":... | carpentry | run-on | [] | synthetic |
tr-0068 | Replaced plumbing vent boot using 1 vent pipe boot. Took half an hour. Customer gave final sign-off. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "roofing",
"laborMinutes": 30,
"materials": [
{
"name": "vent pipe boot",
"quantity": 1,
"unit": null
}
],
"workPerformed": [
"Replaced plumbing vent boot"
]
} | roofing | terse | [
"hours-phrasing"
] | synthetic |
tr-0069 | Located loose neutral on the bus bar. Replaced tripping breaker and tightened panel neutral connections in 50 minutes. Client gave the green light on the repair. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"loose neutral on the bus bar"
],
"jobType": "electrical",
"laborMinutes": 50,
"materials": [],
"workPerformed": [
"Replaced tripping breaker",
"Tightened panel neutral connections"
]
} | electrical | terse | [
"no-materials"
] | synthetic |
tr-0070 | So, uh, I patched the drywall hole using, um, some joint compound, and that work took 75 minutes, uh, sorry, 90 minutes, and then, um, I installed a door stop which took another 45 minutes, so yeah, the customer gave the ticket their stamp of approval, and, uh, still need to return to paint the patch. | {
"customerApproved": true,
"followUps": [
"Return to paint the patch"
],
"issuesFound": [],
"jobType": "general",
"laborMinutes": 135,
"materials": [
{
"name": "joint compound",
"quantity": null,
"unit": null
}
],
"workPerformed": [
"Patched drywall hole",
"Insta... | general | spoken-fillers | [
"extra-labor",
"self-correction"
] | synthetic |
tr-0071 | Yeah, so, um, climbed up onto the roof and noticed a cracked rubber vent boot leaking into the attic, uh, so I replaced the plumbing vent boot using one vent pipe boot and nine roofing nails, and, um, the whole job took two hours. | {
"customerApproved": null,
"followUps": [],
"issuesFound": [
"cracked rubber vent boot leaking into the attic"
],
"jobType": "roofing",
"laborMinutes": 120,
"materials": [
{
"name": "vent pipe boot",
"quantity": 1,
"unit": null
},
{
"name": "roofing nails",
"... | roofing | spoken-fillers | [
"approval-absent",
"hours-phrasing"
] | synthetic |
tr-0072 | Traffic on the highway this morning was pretty rough, but once I got to the house the homeowner was very welcoming. I had to make a run to the supply house to pick up one tub of spackle first, then I patched the nail holes and painted the bedroom walls. The work took 120 minutes, no wait, 90 minutes. Afterward the cust... | {
"customerApproved": true,
"followUps": [
"Touch up after the furniture is back"
],
"issuesFound": [],
"jobType": "painting",
"laborMinutes": 90,
"materials": [
{
"name": "spackle",
"quantity": 1,
"unit": "tub"
}
],
"workPerformed": [
"Picked up spackle at the supply... | painting | rambling | [
"self-correction",
"supply-house-trip"
] | synthetic |
tr-0073 | Had a smooth drive out to the property earlier today, and the neighborhood is really quiet and peaceful. Once I got inside, I patched the drywall hole using one drywall patch kit and some joint compound, and also put in two door stops. The whole visit took 50 minutes. Once everything was set, the client inspected the w... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "general",
"laborMinutes": 50,
"materials": [
{
"name": "drywall patch",
"quantity": 1,
"unit": "kit"
},
{
"name": "joint compound",
"quantity": null,
"unit": null
},
{
"n... | general | rambling | [
"multiple-materials"
] | synthetic |
tr-0074 | started out by heading over to the supply house to pick up the wire nuts and then replaced the tripping breaker and tightened panel neutral connections using twelve feet of 12 gauge wire and 6, no 4 wire nuts and the job took 50 minutes and then the homeowner approved the finished ticket | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "electrical",
"laborMinutes": 50,
"materials": [
{
"name": "12 gauge wire",
"quantity": 12,
"unit": "feet"
},
{
"name": "wire nuts",
"quantity": 4,
"unit": null
}
],
"workPerfor... | electrical | run-on | [
"self-correction",
"supply-house-trip"
] | synthetic |
tr-0075 | made a quick supply house run first thing to pick up the wire nuts and then installed the ceiling light fixture and added a new wall switch using three wire nuts and the work took 75 minutes and then the customer gave the formal go-ahead on the installation and then left it that the customer is to pick a dimmer model | {
"customerApproved": true,
"followUps": [
"Customer is to pick a dimmer model"
],
"issuesFound": [],
"jobType": "electrical",
"laborMinutes": 75,
"materials": [
{
"name": "wire nuts",
"quantity": 3,
"unit": null
}
],
"workPerformed": [
"Picked up wire nuts at the sup... | electrical | run-on | [
"supply-house-trip"
] | synthetic |
tr-0076 | Drive over took forever with all that school traffic on Elm Street, but got into the living room and mounted the television bracket on the wall studs using four lag bolts. Actually had a really nice chat with the homeowner about their vintage record collection while setting things up. Hanging that bracket took me about... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "general",
"laborMinutes": 70,
"materials": [
{
"name": "lag bolts",
"quantity": 4,
"unit": null
}
],
"workPerformed": [
"Mounted the television bracket on the wall studs",
"Concealed the TV wiri... | general | rambling | [
"extra-labor",
"self-correction"
] | synthetic |
tr-0077 | Swapped out the decayed decking using three 5/4 deck boards and two boxes of deck screws in 90 minutes. Secured the wobbly rail post in 40 minutes. Homeowner reviewed the deck and OK'd everything. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "carpentry",
"laborMinutes": 130,
"materials": [
{
"name": "5/4 deck boards",
"quantity": 3,
"unit": null
},
{
"name": "deck screws",
"quantity": 2,
"unit": "box"
}
],
"workPerf... | carpentry | terse | [
"extra-labor"
] | synthetic |
tr-0078 | so yeah um got there and found a loose neutral sitting on the bus bar uh ended up swapping out the breaker that kept tripping... took about 80 minutes for the job, had to run out to the supply house quick to grab the five wire nuts, and uh used twenty-two feet of twelve gauge wire in total, so yeah customer came down t... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"loose neutral sitting on the bus bar"
],
"jobType": "electrical",
"laborMinutes": 80,
"materials": [
{
"name": "wire nuts",
"quantity": 5,
"unit": null
},
{
"name": "twelve gauge wire",
"quantity":... | electrical | spoken-fillers | [
"supply-house-trip"
] | synthetic |
tr-0079 | Recharged the air conditioner with two pounds of R-410A refrigerant and one can of coil cleaner in 80 minutes. Customer checked the cooling and signed the work order. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "hvac",
"laborMinutes": 80,
"materials": [
{
"name": "R-410A refrigerant",
"quantity": 2,
"unit": "pound"
},
{
"name": "coil cleaner",
"quantity": 1,
"unit": "can"
}
],
"workPer... | hvac | terse | [] | synthetic |
tr-0080 | uh yeah basically got the bedroom walls painted up, took me um 90 minutes all together... went through one roll of painter's tape and uh one tub of spackle, plus two gallons of interior eggshell paint, so yeah that's all wrapped up | {
"customerApproved": null,
"followUps": [],
"issuesFound": [],
"jobType": "painting",
"laborMinutes": 90,
"materials": [
{
"name": "painter's tape",
"quantity": 1,
"unit": "roll"
},
{
"name": "spackle",
"quantity": 1,
"unit": "tub"
},
{
"name": ... | painting | spoken-fillers | [
"approval-absent",
"multiple-materials"
] | synthetic |
tr-0081 | Found ceiling box unrated for the fixture, but installed the ceiling light using four wire nuts and one single pole switch in half an hour. Did not get to adding the new wall switch. Customer gave full approval. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"ceiling box unrated for the fixture"
],
"jobType": "electrical",
"laborMinutes": 30,
"materials": [
{
"name": "wire nuts",
"quantity": 4,
"unit": null
},
{
"name": "single pole switch",
"quantity":... | electrical | terse | [
"hours-phrasing",
"negation"
] | synthetic |
tr-0082 | Ran to supply house for two wire nuts, found existing ceiling box not rated for the fixture, and put in the ceiling light fixture in 65 minutes with one single pole switch. Took 20 minutes to add the new wall switch. Customer gave the thumbs up. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"existing ceiling box not rated for the fixture"
],
"jobType": "electrical",
"laborMinutes": 85,
"materials": [
{
"name": "wire nuts",
"quantity": 2,
"unit": null
},
{
"name": "single pole switch",
... | electrical | terse | [
"extra-labor",
"supply-house-trip"
] | synthetic |
tr-0083 | um okay so up on the roof I noticed lifted shingles on the ridge, uh went ahead and replaced the missing shingles... whole job took three hours, ended up using two bundles of architectural shingles, two tubes of roofing cement, and uh one pound of roofing nails, so yeah homeowner came outside, checked the roof, and gav... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"lifted shingles on the ridge"
],
"jobType": "roofing",
"laborMinutes": 180,
"materials": [
{
"name": "architectural shingles",
"quantity": 2,
"unit": "bundle"
},
{
"name": "roofing cement",
"quanti... | roofing | spoken-fillers | [
"hours-phrasing",
"multiple-materials"
] | synthetic |
tr-0085 | well uh started off by opening up the panel and tightened panel neutral connections, then uh replaced the tripping breaker, using two 20 amp breakers and eighteen feet of 12 gauge wire... whole job took three quarters of an hour, and uh customer verified the circuits and gave me their verbal OK | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "electrical",
"laborMinutes": 45,
"materials": [
{
"name": "20 amp breakers",
"quantity": 2,
"unit": null
},
{
"name": "12 gauge wire",
"quantity": 18,
"unit": "feet"
}
],
"work... | electrical | spoken-fillers | [
"hours-phrasing"
] | synthetic |
tr-0086 | The drive out to the countryside was really scenic with all the fall foliage, and the house itself has so much character with high exposed rafters. Once in the bedroom I spotted an old water stain up on the ceiling corner before getting straight to painting the bedroom walls. The customer had a couple of friendly rescu... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"old water stain up on the ceiling corner"
],
"jobType": "painting",
"laborMinutes": 30,
"materials": [],
"workPerformed": [
"Painted the bedroom walls"
]
} | painting | rambling | [
"hours-phrasing",
"no-materials"
] | synthetic |
tr-0087 | yeah so uh climbed up on the roof and spotted lifted shingles on the ridge, then replaced the missing shingles and resealed the chimney flashing, took 90 minutes total... um used two, no wait, one bundle of architectural shingles, so yeah still need to inspect again after the next storm, but the client checked the roof... | {
"customerApproved": true,
"followUps": [
"Inspect again after the next storm"
],
"issuesFound": [
"lifted shingles on the ridge"
],
"jobType": "roofing",
"laborMinutes": 90,
"materials": [
{
"name": "architectural shingles",
"quantity": 1,
"unit": "bundle"
}
],
"w... | roofing | spoken-fillers | [
"self-correction"
] | synthetic |
tr-0088 | okay um crawled under the kitchen sink and replaced the kitchen sink P-trap, took about 50 minutes, uh actually no, wait, 35 minutes... still have to check for leaks next week, but the homeowner took a look underneath and approved the repair | {
"customerApproved": true,
"followUps": [
"Check for leaks next week"
],
"issuesFound": [],
"jobType": "plumbing",
"laborMinutes": 35,
"materials": [],
"workPerformed": [
"Replaced the kitchen sink P-trap"
]
} | plumbing | spoken-fillers | [
"no-materials",
"self-correction"
] | synthetic |
tr-0089 | found a corroded trap arm under the sink and then went ahead and replaced the kitchen sink P-trap using one PVC P-trap kit and three slip joint washers and the whole job took three hours and then the customer tested the faucet and signed off on the invoice | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"corroded trap arm under the sink"
],
"jobType": "plumbing",
"laborMinutes": 180,
"materials": [
{
"name": "PVC P-trap",
"quantity": 1,
"unit": "kit"
},
{
"name": "slip joint washers",
"quantity": 3... | plumbing | run-on | [
"hours-phrasing"
] | synthetic |
tr-0090 | headed over to the supply house to pick up two bottles of enzyme stain remover and then steam cleaned the living room carpet using some carpet shampoo along with one bottle of carpet deodorizer and that took 65 minutes and then the customer looked over the room and gave the all-clear and then I noted that I have to ret... | {
"customerApproved": true,
"followUps": [
"Return to recheck the stains after drying"
],
"issuesFound": [],
"jobType": "cleaning",
"laborMinutes": 65,
"materials": [
{
"name": "enzyme stain remover",
"quantity": 2,
"unit": "bottle"
},
{
"name": "carpet shampoo",
... | cleaning | run-on | [
"multiple-materials",
"supply-house-trip"
] | synthetic |
tr-0091 | went ahead and patched up the hole in the drywall and then installed 1 door stop and the job took 80 minutes and then the customer stated plainly that they did not approve the work | {
"customerApproved": false,
"followUps": [],
"issuesFound": [],
"jobType": "general",
"laborMinutes": 80,
"materials": [
{
"name": "door stop",
"quantity": 1,
"unit": null
}
],
"workPerformed": [
"Patched the hole in the drywall",
"Installed door stop"
]
} | general | run-on | [
"negation"
] | synthetic |
tr-0092 | Stud offset from the center of the wall. Made a run to the supply house to pick up 1 kit of in-wall cable kit and mounted the TV bracket. Took two hours; client gave the go-ahead. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"stud offset from the center of the wall"
],
"jobType": "general",
"laborMinutes": 120,
"materials": [
{
"name": "in-wall cable kit",
"quantity": 1,
"unit": "kit"
}
],
"workPerformed": [
"Picked up in-wall ... | general | terse | [
"hours-phrasing",
"supply-house-trip"
] | synthetic |
tr-0093 | Traffic on the bypass was brutal this morning, but I finally made it out to this charming older home. Replaced the tripping breaker inside the main panel using 1 20 amp breaker, 8 wire nuts, and 13 feet of 12 gauge wire. The whole visit took 60 minutes, and the gentleman gave me his full approval once everything tested... | {
"customerApproved": true,
"followUps": [
"Send over a panel replacement quote later on"
],
"issuesFound": [],
"jobType": "electrical",
"laborMinutes": 60,
"materials": [
{
"name": "20 amp breaker",
"quantity": 1,
"unit": null
},
{
"name": "wire nuts",
"quant... | electrical | rambling | [
"multiple-materials"
] | synthetic |
tr-0094 | Um so yeah wrapped up in the bedroom, patched the nail holes and painted the bedroom walls, though uh noticed a water stain on the ceiling corner while rolling. Used up 3 gallons of interior eggshell paint, 1 roll of painter's tape, and 1 tub of spackle. Total time was like um 120 minutes, wait no, 90 minutes. Customer... | {
"customerApproved": true,
"followUps": [
"Do touch ups after the furniture is back"
],
"issuesFound": [
"water stain on the ceiling corner"
],
"jobType": "painting",
"laborMinutes": 90,
"materials": [
{
"name": "interior eggshell paint",
"quantity": 3,
"unit": "gallon"
... | painting | spoken-fillers | [
"multiple-materials",
"self-correction"
] | synthetic |
tr-0095 | Found rotted joist end under two boards and replaced rotted deck boards with 5 5/4 deck boards and 2 carriage bolts, didn't need the deck screws after all. Job ran 105 minutes, no 90 minutes. Customer OKβd the work; still need to quote sistering the joist. | {
"customerApproved": true,
"followUps": [
"Quote sistering the joist"
],
"issuesFound": [
"rotted joist end under two boards"
],
"jobType": "carpentry",
"laborMinutes": 90,
"materials": [
{
"name": "5/4 deck boards",
"quantity": 5,
"unit": null
},
{
"name": "... | carpentry | terse | [
"negation",
"self-correction"
] | synthetic |
tr-0096 | So yeah finished up painting the bedroom walls, um went through 1 tub of spackle, 3 gallons of interior eggshell paint, and 1 roll of painter's tape. Clocked at uh 60 minutes, wait no, 90 minutes total. The homeowner inspected everything and signed off on the job. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "painting",
"laborMinutes": 90,
"materials": [
{
"name": "spackle",
"quantity": 1,
"unit": "tub"
},
{
"name": "interior eggshell paint",
"quantity": 3,
"unit": "gallon"
},
{
... | painting | spoken-fillers | [
"multiple-materials",
"self-correction"
] | synthetic |
tr-0097 | The drive out to the property was really pleasant with all the fall colors along the highway, and the customer had cleared plenty of space for me in the basement. Replaced the furnace thermostat with 1 programmable thermostat and changed the furnace filter. Took 35 minutes from start to finish. The owner happily gave t... | {
"customerApproved": true,
"followUps": [
"Schedule the fall tune-up"
],
"issuesFound": [],
"jobType": "hvac",
"laborMinutes": 35,
"materials": [
{
"name": "programmable thermostat",
"quantity": 1,
"unit": null
}
],
"workPerformed": [
"Replaced the furnace thermostat... | hvac | rambling | [] | synthetic |
tr-0099 | Finding street parking was a bit of an adventure today with all the landscaping trucks around, and the customer has a couple of very sweet rescue dogs that kept me company. Took a look in the electrical cabinet and spotted a scorched breaker terminal, so I replaced the tripping breaker using 2 20 amp breakers, 18 feet ... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"scorched breaker terminal"
],
"jobType": "electrical",
"laborMinutes": 65,
"materials": [
{
"name": "20 amp breakers",
"quantity": 2,
"unit": null
},
{
"name": "12 gauge wire",
"quantity": 18,
... | electrical | rambling | [
"multiple-materials"
] | synthetic |
tr-0100 | Found ceiling box not rated for the fixture, but installed ceiling light fixture with 5 wire nuts and 1 single pole switch. Took 95 minutes, make that 65 minutes. Customer officially accepted the installation; waiting on customer to pick a dimmer model. | {
"customerApproved": true,
"followUps": [
"Wait on customer to pick a dimmer model"
],
"issuesFound": [
"ceiling box not rated for the fixture"
],
"jobType": "electrical",
"laborMinutes": 65,
"materials": [
{
"name": "wire nuts",
"quantity": 5,
"unit": null
},
{
... | electrical | terse | [
"self-correction"
] | synthetic |
tr-0101 | Had to dodge some nasty morning construction traffic along the parkway, but the client was super gracious and had a cup of coffee ready when I arrived at their lovely brick colonial. Pulled apart the dryer cabinet and found a burnt-out heating element. Replaced the dryer heating element using 3, no 1 dryer heating elem... | {
"customerApproved": true,
"followUps": [
"Recommend an annual vent cleaning when sending the invoice"
],
"issuesFound": [
"burnt-out heating element"
],
"jobType": "appliance",
"laborMinutes": 80,
"materials": [
{
"name": "dryer heating element",
"quantity": 1,
"unit": nu... | appliance | rambling | [
"self-correction"
] | synthetic |
tr-0102 | Um so yeah took apart the back inside panel and the evaporator coil was iced over, so replaced the refrigerator defrost timer and put on 1 door gasket. Took uh 90 minutes on the clock. Client reviewed it and gave the thumbs up to wrap up the ticket. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"evaporator coil iced over"
],
"jobType": "appliance",
"laborMinutes": 90,
"materials": [
{
"name": "door gasket",
"quantity": 1,
"unit": null
}
],
"workPerformed": [
"Replaced the refrigerator defrost time... | appliance | spoken-fillers | [] | synthetic |
tr-0103 | Took the scenic route by the lake since the main boulevard was backed up, and the customer's renovated space looks fantastic. Cleaned post-renovation dust from the bathroom and then sealed the grout lines all around the shower and floor. Spent two and a half hours on the job. The homeowner did a full walk-through inspe... | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "cleaning",
"laborMinutes": 150,
"materials": [],
"workPerformed": [
"Cleaned post-renovation dust from the bathroom",
"Sealed the grout lines all around the shower and floor"
]
} | cleaning | rambling | [
"hours-phrasing",
"no-materials"
] | synthetic |
tr-0104 | pulled the machine inside and spotted old pet stains in the hallway and then steam cleaned the living room carpet using 1 gallon of carpet shampoo and 1 bottle of carpet deodorizer and the main cleaning took 75 minutes and then treated pet stains which took another 20 minutes | {
"customerApproved": null,
"followUps": [],
"issuesFound": [
"old pet stains in the hallway"
],
"jobType": "cleaning",
"laborMinutes": 95,
"materials": [
{
"name": "carpet shampoo",
"quantity": 1,
"unit": "gallon"
},
{
"name": "carpet deodorizer",
"quantity":... | cleaning | run-on | [
"approval-absent",
"extra-labor"
] | synthetic |
tr-0105 | got under the kitchen counter and found a leaking slip nut on the P-trap and then replaced the kitchen sink P-trap using 4 slip joint washers and 1 braided supply line and the whole repair took 65 minutes and then the customer inspected the plumbing and gave their final sign-off | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"leaking slip nut on the P-trap"
],
"jobType": "plumbing",
"laborMinutes": 65,
"materials": [
{
"name": "slip joint washers",
"quantity": 4,
"unit": null
},
{
"name": "braided supply line",
"quantit... | plumbing | run-on | [] | synthetic |
tr-0106 | Put up replacements for missing shingles and spotted lifted shingles on the ridge during the 90 minute repair. Used 1 tube of roofing cement along with 3, no 2 bundles of architectural shingles. Homeowner refused to approve the repairs. | {
"customerApproved": false,
"followUps": [],
"issuesFound": [
"lifted shingles on the ridge"
],
"jobType": "roofing",
"laborMinutes": 90,
"materials": [
{
"name": "roofing cement",
"quantity": 1,
"unit": "tube"
},
{
"name": "architectural shingles",
"quantity... | roofing | terse | [
"negation",
"self-correction"
] | synthetic |
tr-0107 | Traffic on Route 4 was an absolute mess getting out to this charming brick house, but I got the front door painted. Noticed peeling paint on the door trim while looking it over. I ended up using 3 sanding sponges and 1 quart of exterior satin paint for the door. Still have to put on a second coat once the first cures. | {
"customerApproved": null,
"followUps": [
"Put on a second coat once the first cures"
],
"issuesFound": [
"peeling paint on the door trim"
],
"jobType": "painting",
"laborMinutes": null,
"materials": [
{
"name": "sanding sponges",
"quantity": 3,
"unit": null
},
{
... | painting | rambling | [
"approval-absent"
] | synthetic |
tr-0108 | I replaced the dryer heating element and the job took 90 minutes and then the client signed off on everything and then we have to recommend annual vent cleaning down the road | {
"customerApproved": true,
"followUps": [
"Recommend annual vent cleaning down the road"
],
"issuesFound": [],
"jobType": "appliance",
"laborMinutes": 90,
"materials": [],
"workPerformed": [
"Replaced the dryer heating element"
]
} | appliance | run-on | [
"no-materials"
] | synthetic |
tr-0109 | Took care of replacing the rotted deck boards using 3 5/4 deck boards and 1 box of deck screws and I found a rotted joist end under two boards and the job took an hour and then the homeowner OK'd the completed work and then we still need to quote sistering the joist | {
"customerApproved": true,
"followUps": [
"Quote sistering the joist"
],
"issuesFound": [
"rotted joist end under two boards"
],
"jobType": "carpentry",
"laborMinutes": 60,
"materials": [
{
"name": "5/4 deck boards",
"quantity": 3,
"unit": null
},
{
"name": "... | carpentry | run-on | [
"hours-phrasing"
] | synthetic |
tr-0110 | Steam cleaned living room carpet in 90 minutes using 1 gallon of carpet shampoo, then treated pet stains which took another 30 minutes. Carpet pad soaked by the window. Customer officially approved the finished job. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"carpet pad soaked by the window"
],
"jobType": "cleaning",
"laborMinutes": 120,
"materials": [
{
"name": "carpet shampoo",
"quantity": 1,
"unit": "gallon"
}
],
"workPerformed": [
"Steam cleaned living room... | cleaning | terse | [
"extra-labor"
] | synthetic |
tr-0111 | Um so yeah I got the refrigerator defrost timer replaced, uh it took 100 minutes, wait no, 70 minutes, and yeah the customer gave the go-ahead and approved the repair. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "appliance",
"laborMinutes": 70,
"materials": [],
"workPerformed": [
"Replaced the refrigerator defrost timer"
]
} | appliance | spoken-fillers | [
"no-materials",
"self-correction"
] | synthetic |
tr-0112 | The drive out to the property took me down some really winding back roads, but I got there and replaced the water heater anode rod and flushed the water heater tank. Found heavy sediment in the tank. I had to make a run to the supply house to pick up 1 tube of thread sealant. In total the job took 110 minutes, scratch ... | {
"customerApproved": true,
"followUps": [
"Quote a new water heater"
],
"issuesFound": [
"heavy sediment in the tank"
],
"jobType": "plumbing",
"laborMinutes": 80,
"materials": [
{
"name": "thread sealant",
"quantity": 1,
"unit": "tube"
}
],
"workPerformed": [
... | plumbing | rambling | [
"self-correction",
"supply-house-trip"
] | synthetic |
tr-0113 | So yeah, um, got theβinstalled closet shelving, used 3 melamine shelf boards and 11 drywall anchors, which took 60 minutes. Then uh patched old bracket holes, that was another 25 minutes, and um the customer gave their stamp of approval. | {
"customerApproved": true,
"followUps": [],
"issuesFound": [],
"jobType": "carpentry",
"laborMinutes": 85,
"materials": [
{
"name": "melamine shelf boards",
"quantity": 3,
"unit": null
},
{
"name": "drywall anchors",
"quantity": 11,
"unit": null
}
],
... | carpentry | spoken-fillers | [
"extra-labor"
] | synthetic |
tr-0114 | I patched a drywall hole and used 1 kit of drywall patch kit and some joint compound and then used 1 door stop and the whole job took 85 minutes | {
"customerApproved": null,
"followUps": [],
"issuesFound": [],
"jobType": "general",
"laborMinutes": 85,
"materials": [
{
"name": "drywall patch kit",
"quantity": 1,
"unit": "kit"
},
{
"name": "joint compound",
"quantity": null,
"unit": null
},
{
... | general | run-on | [
"approval-absent",
"multiple-materials"
] | synthetic |
tr-0115 | Went ahead and replaced the kitchen sink P-trap and found a corroded trap arm and used 1 roll of plumber's tape and 3 slip joint washers and 1 braided supply line and the job took 100 minutes no wait 70 minutes and then the homeowner signed off on the repair and then I have to check for leaks next week | {
"customerApproved": true,
"followUps": [
"Check for leaks next week"
],
"issuesFound": [
"corroded trap arm"
],
"jobType": "plumbing",
"laborMinutes": 70,
"materials": [
{
"name": "plumber's tape",
"quantity": 1,
"unit": "roll"
},
{
"name": "slip joint washe... | plumbing | run-on | [
"multiple-materials",
"self-correction"
] | synthetic |
tr-0116 | Finished up replacing the furnace thermostat and found the thermostat wiring corroded and used 3 wire nuts and 2 furnace filters and the work took 45 minutes and then the client gave the green light and approved the work | {
"customerApproved": true,
"followUps": [],
"issuesFound": [
"corroded thermostat wiring"
],
"jobType": "hvac",
"laborMinutes": 45,
"materials": [
{
"name": "wire nuts",
"quantity": 3,
"unit": null
},
{
"name": "furnace filters",
"quantity": 2,
"unit": ... | hvac | run-on | [] | synthetic |
JobTrail field notes: synthetic training set v1
799 tradesperson end-of-job notes, each paired with a structured job record, for fine-tuning a small on-device model to turn a note into a record. It's the training set of JobTrail (issue #74). The frozen eval sets it was kept apart from are in the same repository (data card).
All of it is synthetic. Gemini 3.8 Flash wrote and labeled every note, through the
Antigravity CLI. No real customer or job is in it. Google's terms for Gemini output apply in
addition to the MIT license, and OpenAI's to the 150 GPT-6 Luna cross-check labels in the raw
configuration.
Configurations
default(train.jsonl, 799 rows): the training set. Fields areid,note,target(the record),trade,style,tagsandsource.raw(raw.jsonl, 930 rows): every note of plans 1β930, kept or not, with its plan, the labels (labels, keyed by the models that labeled the note;nullwould mean an unparseable or invalid answer, and none is),kept, and why it was dropped (reason,contradicts). It's there to audit the filter or to build a different one.
target follows schema v2: jobType, workPerformed, issuesFound, materials
(name, quantity, unit), laborMinutes, customerApproved and followUps. A value the note
doesn't state is null or empty. The labeling rules are in
data/LABELING.md.
Other files: filter.json (counts, mix and the SHA-256 of every data file), leakage.json,
heldout.json, config.yaml (every setting of the run) and raw/: the files the run appended
to, from which filter rebuilds everything above. They include every model answer and the time
and tokens of every call, and 30 notes written past plan 930 that v1 doesn't use.
How it was made
- Plan. A seeded sampler draws a record from the job templates in
data/scenarios.yaml: 9 trades, 4 note styles (terse, rambling, spoken-fillers, run-on) and 8 hard-case tags (hours phrasing, negation, self-correction, multiple materials, no materials, supply-house trip, extra labor, approval absent). The tags that caused most baseline failures are weighted up, and no plan repeats an eval answer key. A plan may repeat in a different style: 7 plans appear twice among the kept notes. The plans are a fixed prefix (1β930) of a 6,000-plan pool, so a later, larger run adds notes without changing these. - Write.
gemini-3.8-flash-mediumwrites each note from its plan in its own words, 15 at a time. - Label, blind. Two labelers read only the note:
gemini-3.8-flash-high(97.3% zero-edit on the dev set with this prompt) and, separately,gemini-3.8-flash-medium. The target is the High label, so it uses the note's wording, not the plan's. - Filter. A note is kept only if:
- both labels are valid;
- they agree, under the JobTrail scorer's zero-edit test in both directions;
- the target matches what the plan fixed: the trade, minutes and approval; the number of
tasks, issues and follow-ups (not their wording); and the materials by quantity and unit
(not by name). Up to one extra task per material is allowed, since the eval gold also lists
narrated installs as tasks. One planned issue, "Doorknob punched through the drywall", may
be left out, as the eval gold labels it both ways (
LABELING.mdreads it as the job's own task); 3 kept notes leave it out.
- Leakage check. A kept note is dropped if it's a near-copy of any test or dev note: 5-word shingle Jaccard β₯ 0.2, or 8-gram containment β₯ 0.3. Both thresholds were set from the test-vs-dev distribution (95th percentiles 0.139 and 0.154) before any training note existed.
Results
| Step | Notes |
|---|---|
| Planned and written | 930 |
| Labelers disagree | β77 |
| Target contradicts the plan | β43 |
| Near-copy of an eval note | β11 |
| Kept | 799 (85.9%) |
Of the 43 contradictions, the fields involved were materials 21, issues 18, tasks 18, trade 15, minutes 15, approval 12 and follow-ups 11 (a note can break several).
Kept notes by style: terse 203, rambling 182, spoken-fillers 204, run-on 210. By trade: 74β109
each. Every hard-case tag has at least 86 kept notes; self-correction, the most common baseline
failure, has 188. The full mix is in filter.json.
Cross-check, not part of the filter. GPT-6 Luna (another model family, through the Codex CLI) labeled the first 150 notes blind. On the 126 of them that were kept, its label agrees with the target on 83 (66%) and keeps the plan facts on 98 (78%).
Held-out templates
One job template per trade never reaches training. That way a fine-tuned model can be scored
separately on eval notes from templates it has never seen, to tell whether it learned the task or
the templates. The slice is 49 of the 163 test notes and 27 of the 110 dev notes; the ids are in
heldout.json.
| Trade | Held-out template |
|---|---|
| appliance | Replaced dishwasher drain pump |
| carpentry | Rehung sagging exterior door |
| cleaning | Deep cleaned kitchen |
| electrical | Installed GFCI outlets in bathroom |
| general | Assembled flat-pack wardrobe |
| hvac | Replaced blower motor capacitor |
| painting | Stained deck |
| plumbing | Replaced toilet wax ring |
| roofing | Cleaned gutters |
Limitations
- Smaller than planned. The issue asked for 3,000β5,000 kept notes. At about 43 s of model time per note (writing 7 s, Flash High labeling 22 s, Flash Medium 13 s, from the usage logs), the owner stopped at plans 1β930 and will add more only if fine-tuning shows it needs them.
- One model family. The writer and both labelers are Gemini 3.8 Flash, so the targets carry its reading of the labeling rules. The cross-check shows another family reads about a third of the notes differently.
- Agreement isn't correctness. Two labelers can agree on the same mistake. The plan check catches wrong numbers, trades and counts, but not wrong wording, material names or field routing.
- Templates. Outside the held-out ones, training and eval notes share job templates, and 442 of the 810 notes checked share at least one 8-gram with an eval note (54 of the 110 dev notes do with test, too). Only near-copies were dropped.
- No human reviewed it.
Reproduce
From the repository, in ml/:
uv run python scripts/gen_train_notes.py write
uv run python scripts/gen_train_notes.py label gemini
uv run python scripts/gen_train_notes.py label gemini-medium
uv run python scripts/gen_train_notes.py filter
The limit (930) comes from config.yaml. Every stage resumes where it stopped, and
--shard K/N splits a stage across processes. Model output isn't deterministic, so a rerun
writes different notes. Put this dataset's raw/ files in data/train/raw/ and filter
rebuilds train.jsonl and raw.jsonl byte for byte; filter.json records the SHA-256 of
both and of every raw file.
- Downloads last month
- 61