id string | image image | query string | answer string |
|---|---|---|---|
train_18 | What is the work instruction number? | 53551/11001/201 | |
train_40 | What was the start date of the work? | 04.09.2024 | |
train_27 | What were the final remarks to SDRS? | DSSSR | |
train_26 | What action was recommended? | 1. Overhauling of motor blower motor to be done.2. IR to be improved. | |
train_38 | What is the occasion repair reference? | SR/NR/MR/RA/OPDEF | |
train_68 | How many mutton cloths were consumed? | 4 metres | |
train_24 | What was noted under remarks? | PU: 11001 | |
train_33 | How many Bearings are required? | 2 | |
train_0 | What is the ship name? | INS "A" | |
train_42 | What is the defect description? | Low insulation observed in blower motor (Rating 0.23kW) | |
train_86 | What is the satisfaction level mentioned? | (Blank, not filled) | |
train_72 | How much spirit was consumed? | ยฝ litre | |
train_60 | What procedure was followed for the trials? | As per QP/QA/ ELE/2024 | |
train_61 | Were trials witnessed by Ship Staff? | Yes | |
train_17 | What is the ship name? | INS "A" | |
train_7 | What is the occasion? | SR | |
train_52 | What was the report for point 02? | Stage clear | |
train_21 | Who supervised the work? | "A" CM | |
train_79 | What is the page number? | 27 of 37 | |
train_25 | What defect was observed? | Low insulation observed in blower motor (Rating 0.23kW) of CO2 absorber no-14. | |
train_87 | What remarks are mentioned? | (Blank, not filled) | |
train_74 | What is the nature of spirit? | Consumable | |
train_10 | What action is to be undertaken? | 1. Overhauling of motor blower to be done. 2. IR to be improved. | |
train_50 | What was the inspection report? | Stage clear | |
train_5 | Was WP required? | Yes | |
train_55 | What was done in QC inspection point 04? | QC Rep inspected pressure testing for COโ Absorber cooling pressure (5kg/cmยฒ) at NRW Lab | |
train_1 | What is the work instruction number? | 5555/11001/201 | |
train_37 | What is the system/equipment being repaired? | COโ Absorber Motor | |
train_43 | Who raised the job? | USER DEPT | |
train_67 | What was the second item listed? | Mutton Cloths | |
train_71 | What was the third item listed? | Spirit | |
train_81 | What is the ship/unit name? | INS "A" | |
train_20 | Which system/equipment was inspected? | CO2 Complex / CO2 Absorber Motor | |
train_75 | Are there any additional remarks? | No, the field is blank | |
train_63 | What spare item was used with pattern numbers 120364 & 120365? | Bearing DE & NDE (6306ZZ/C) | |
train_32 | What is the part number of the Bearings? | 6306ZZ/C | |
train_59 | Was the QC satisfied in final trials? | Yes, QC found SAT | |
train_23 | What was the occasion mentioned? | SR | |
train_84 | What is the DCD (completion) date? | 14.09.2024 | |
train_56 | What was the report for point 04? | Stage clear | |
train_15 | What is the date of issue? | Aug-24 | |
train_85 | What is the name of the repair/service provided? | Low insulation of COโ absorber motor | |
train_45 | Who were the technicians involved? | HSK-II, SK | |
train_9 | What defect was observed? | Low insulation observed in blower motor (Rating 0.23kW) of COโ absorber no-14. | |
train_31 | What is the description of the required spare? | Bearings | |
train_62 | What is the final trial report? | SAT (Appendix C) | |
train_80 | What is the D.L. number? | 11001 | |
train_16 | What is the page number? | 1 of 29 | |
train_44 | Who supervised the work? | โAโ CM | |
train_48 | What was the QC inspection done? | Inspected for deflection & dismantling of motor at NRW Shop floor | |
train_46 | Who accepted the work? | DSSSR | |
train_83 | What is the DSD (start) date? | 04.09.2024 | |
train_70 | What is the nature of mutton cloths? | Consumable | |
train_3 | What is the system / equipment? | COโ complex / COโ Absorber motor | |
train_34 | What is the availability status of the Bearings? | S. S | |
train_30 | How many items are listed in the Required Spares List? | 1 item | |
train_58 | What was the report for point 05? | SAT | |
train_76 | What is the document number? | NDV/NRW/PD/204/01 | |
train_54 | What was the report for point 03? | Stage clear | |
train_49 | Who did the inspection? | QC ELE NOM | |
train_6 | What was the examination report? | Low insulation observed in blower motor (Rating 0.2kW) of COโ absorber no-14. | |
train_78 | What is the date of issue? | 2021 | |
train_11 | What are the final remarks to SDRS? | DSSSR | |
train_73 | Who provided the spirit? | User Store | |
train_41 | What was the completion date of the work? | 14.09.2024 | |
train_22 | What was the examination report finding? | Low insulation observed in blower motor (Rating 0.2kW) of CO2 absorber no-14. | |
train_19 | What is the date of inspection? | 04.09.2024 | |
train_35 | Which department prepared this record sheet? | NRW department, Naval Dockyard-Visakhapatnam | |
train_64 | How many bearings were used? | 2 | |
train_47 | Who raised the remarks? | By USER DEPT on 09.09.24 | |
train_12 | What is the SAT/UNSAT status? | UNSAT | |
train_53 | What was done in QC inspection point 03? | QC Rep inspected the CFA, AC1 and No Load Trials of COโ Absorber Motor No.14 at NRW Electrical Work Shop | |
train_14 | What is the revision number (Rev. No.)? | 0 | |
train_13 | What is the document number? | WNT/DEPT/PD/161/06 | |
train_66 | What is the nature of bearings as a spare? | โ (not explicitly marked, assumed normal part) | |
train_36 | What is the name of the ship/submarine? | INS โAโ | |
train_65 | Who provided the bearings? | S. S | |
train_77 | What is the revision number? | 0 | |
train_8 | What are the remarks? | PU: 11001 |
README.md exists but content is empty.
- Downloads last month
- 8