Dataset Viewer
Auto-converted to Parquet Duplicate
derived_fields
list
hold_point
string
id
string
jurisdiction
string
prerequisite
string
process
string
source
string
source_quote
string
step_name
string
step_order
string
url
string
verified_fields
list
also_reported
list
disagreements
list
deadline
string
[ "jurisdiction", "process" ]
the permit holder must request a final inspection and obtain final approval before any occupancy of the building or structure may occur
creve-coeur-missouri-duty-to-request-a-final-inspection-and-obtain-final-approval
Creve Coeur, Missouri
Upon completion of the work described in the permit application and on the approved construction documents
Residential building inspection sequence
https://www.crevecoeurmo.gov/253/Sequence-of-Inspection-Page-2
10. Duty to Request a Final Inspection and Obtain Final Approval Upon completion of the work described in the permit application and on the approved construction documents, the permit holder must request a final inspection and obtain final approval before any occupancy of the building or structure may occur. Failure of...
Duty to Request a Final Inspection and Obtain Final Approval
10
https://referencesource.org/prerequisite-sequencing-regulated-processes/creve-coeur-missouri-duty-to-request-a-final-inspection-and-obtain-final-approval/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
null
creve-coeur-missouri-final-inspection
Creve Coeur, Missouri
after all required inspections are approved, including the final mechanical, electrical, plumbing and fire inspections
Residential building inspection sequence
https://www.crevecoeurmo.gov/253/Sequence-of-Inspection-Page-2
7. Final Inspection A final building inspection must be made after all required inspections are approved, including the final mechanical, electrical, plumbing and fire inspections.
Final Inspection
7
https://referencesource.org/prerequisite-sequencing-regulated-processes/creve-coeur-missouri-final-inspection/
[ "prerequisite", "step_name", "step_order" ]
[ { "as_of": "2026-08-11T00:00:00", "field": "hold_point", "source": "https://www.crevecoeurmo.gov/87/Sequence-of-Inspections-for-Wood-Decks", "source_quote": "Final Inspection: The completed deck project must be inspected and approved prior to use.", "value": "The completed deck project must be i...
[ { "field": "process", "versions": [ { "as_of": "2026-08-11T00:00:00", "source": "https://www.crevecoeurmo.gov/253/Sequence-of-Inspection-Page-2", "source_quote": "7. Final Inspection A final building inspection must be made after all required inspections are approved, including...
null
[ "jurisdiction", "process" ]
No concrete may be placed without this inspection being approved
creve-coeur-missouri-foundation-inspection
Creve Coeur, Missouri
after the top of the footing has been cleaned, the foundation forms have been properly set, the reinforcing steel has been cleaned and tied in place and the proper anchor bolts are on-site
Residential building inspection sequence
https://www.crevecoeurmo.gov/86/Sequence-of-Inspections
2. Foundation Inspection A foundation inspection is required after the top of the footing has been cleaned, the foundation forms have been properly set, the reinforcing steel has been cleaned and tied in place and the proper anchor bolts are on-site. A city-approved barrier must be in place around the excavation until ...
Foundation Inspection
2
https://referencesource.org/prerequisite-sequencing-regulated-processes/creve-coeur-missouri-foundation-inspection/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
No mechanical, electrical, plumbing or framing systems may be concealed before this inspection is completed and approved by the building official
creve-coeur-missouri-framing-inspection
Creve Coeur, Missouri
after the plumbing, mechanical, electrical and fire rough-in inspections have been approved and noted on the posted Record of Inspections
Residential building inspection sequence
https://www.crevecoeurmo.gov/86/Sequence-of-Inspections
4. Framing Inspection A framing inspection is required after the plumbing, mechanical, electrical and fire rough-in inspections have been approved and noted on the posted Record of Inspections. Also, all masonry walls, fireplace chimneys and vents and all framing; including the floor, wall and roof structures, firestop...
Framing Inspection
4
https://referencesource.org/prerequisite-sequencing-regulated-processes/creve-coeur-missouri-framing-inspection/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
[ { "field": "process", "versions": [ { "as_of": "2026-08-11T00:00:00", "source": "https://www.crevecoeurmo.gov/86/Sequence-of-Inspections", "source_quote": "4. Framing Inspection A framing inspection is required after the plumbing, mechanical, electrical and fire rough-in inspec...
null
[ "jurisdiction", "process" ]
No joint compound may be applied over the joints and fasteners prior to this inspection being approved
creve-coeur-missouri-gypsum-board-plaster-inspection
Creve Coeur, Missouri
after all gypsum board sheets are in place and properly fastened
Residential building inspection sequence
https://www.crevecoeurmo.gov/86/Sequence-of-Inspections
5. Gypsum Board & Plaster Inspection A gypsum board inspection is required after all gypsum board sheets are in place and properly fastened. No joint compound may be applied over the joints and fasteners prior to this inspection being approved.
Gypsum Board & Plaster Inspection
5
https://referencesource.org/prerequisite-sequencing-regulated-processes/creve-coeur-missouri-gypsum-board-plaster-inspection/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
null
creve-coeur-missouri-mechanical-equipment-inspection
Creve Coeur, Missouri
null
Residential building inspection sequence
https://www.crevecoeurmo.gov/253/Sequence-of-Inspection-Page-2
6. Mechanical Equipment Inspection A final inspection will be made of all duct work, venting, heating and air-conditioning systems, exhaust devices and louvers, safety devices and all other mechanical equipment under operational conditions.
Mechanical Equipment Inspection
6
https://referencesource.org/prerequisite-sequencing-regulated-processes/creve-coeur-missouri-mechanical-equipment-inspection/
[ "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
No concrete may be placed without this inspection being approved
creve-coeur-missouri-pier-inspection
Creve Coeur, Missouri
Reinforcing steel must be placed to allow for proper inspections
Residential building inspection sequence
https://www.crevecoeurmo.gov/86/Sequence-of-Inspections
3. Pier Inspection A pier inspection is required where special foundations, such as drilled and poured-in-place concrete piers, caissons, driven piles and other extraordinary types are used. Additional pier inspections may be required if the building official determines the size of the project warrants it. The building...
Pier Inspection
3
https://referencesource.org/prerequisite-sequencing-regulated-processes/creve-coeur-missouri-pier-inspection/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
[ { "field": "process", "versions": [ { "as_of": "2026-08-11T00:00:00", "source": "https://www.crevecoeurmo.gov/86/Sequence-of-Inspections", "source_quote": "3. Pier Inspection A pier inspection is required where special foundations, such as drilled and poured-in-place concrete p...
null
[ "jurisdiction", "process" ]
No concrete may be placed without this inspection being approved
creve-coeur-missouri-soil-inspection
Creve Coeur, Missouri
after the excavation for the building or structure is complete and trenches for footings, column pads, grade beams and other types of footings are crumbed, formed, have reinforcing steel tied in place and are ready for concrete
Residential building inspection sequence
https://www.crevecoeurmo.gov/86/Sequence-of-Inspections
1. Soil Inspection A soil inspection is required after the excavation for the building or structure is complete and trenches for footings, column pads, grade beams and other types of footings are crumbed, formed, have reinforcing steel tied in place and are ready for concrete. A city-approved barrier must be in place a...
Soil Inspection
1
https://referencesource.org/prerequisite-sequencing-regulated-processes/creve-coeur-missouri-soil-inspection/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
null
creve-coeur-missouri-temporary-occupancy
Creve Coeur, Missouri
providing that such portion of the building can be occupied safely prior to full completion of the project, without endangering life or public welfare
Residential building inspection sequence
https://www.crevecoeurmo.gov/253/Sequence-of-Inspection-Page-2
11. Temporary Occupancy Upon request of the permit holder, a <https://www.crevecoeurmo.gov/88/Temporary-Certificate-of-Occupancy> temporary certificate of occupancy may be issued prior to completion of the entire work covered by the permit, providing that such portion of the building can be occupied safely prior to ful...
Temporary Occupancy
11
https://referencesource.org/prerequisite-sequencing-regulated-processes/creve-coeur-missouri-temporary-occupancy/
[ "deadline", "prerequisite", "step_name", "step_order" ]
null
null
renewed, at the discretion of the building official, every 30 days
[ "jurisdiction", "process" ]
All lintels required to be bolted to the framing for support shall not be covered by any interior or exterior wall or ceiling finish materials before approval
mecklenburg-county-north-carolina-building-framing-inspection
Mecklenburg County, North Carolina
after the roof wall, ceiling, and floor framing is complete with appropriate blocking, bracing and fire stopping in place
Residential building inspection sequence
https://code.mecknc.gov/inspections/schedule
6. Building Framing Inspection To be made after the roof wall, ceiling, and floor framing is complete with appropriate blocking, bracing and fire stopping in place. The following items should be in place and visible for inspection: Pipes Chimneys and vents Flashing for roofs, chimneys and wall openings Insulation baffl...
Building Framing Inspection
6
https://referencesource.org/prerequisite-sequencing-regulated-processes/mecklenburg-county-north-carolina-building-framing-inspection/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
Once all final inspections are complete and any outside agency holds have been satisfied (if any), a certificate will be issued for the property
mecklenburg-county-north-carolina-final-inspection
Mecklenburg County, North Carolina
Each trade must be completed prior to requesting a final inspection for each
Residential building inspection sequence
https://code.mecknc.gov/inspections/schedule
8. Final Inspection Each trade must be completed prior to requesting a final inspection for each. Typically the building final inspection is performed last. all final grading, drainage, hand rails, guardrails in place. Once all final inspections are complete and any outside agency holds have been satisfied (if any), a ...
Final Inspection
8
https://referencesource.org/prerequisite-sequencing-regulated-processes/mecklenburg-county-north-carolina-final-inspection/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
before any concrete is placed
mecklenburg-county-north-carolina-footing-inspection
Mecklenburg County, North Carolina
after the trenches are excavated, all grade stakes are installed, all reinforcing steel and supports are in place and appropriately tied, all necessary forms are in place and braced
Residential building inspection sequence
https://code.mecknc.gov/inspections/schedule
1. Footing Inspection To be made after the trenches are excavated, all grade stakes are installed, all reinforcing steel and supports are in place and appropriately tied, all necessary forms are in place and braced and before any concrete is placed
Footing Inspection
1
https://referencesource.org/prerequisite-sequencing-regulated-processes/mecklenburg-county-north-carolina-footing-inspection/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
null
mecklenburg-county-north-carolina-foundation-inspection
Mecklenburg County, North Carolina
after all foundation supports are installed
Residential building inspection sequence
https://code.mecknc.gov/inspections/schedule
4. Foundation Inspection To be made after all foundation supports are installed. This inspection is to check foundation supports, crawl space leveling, ground clearances, and positive drainage, where required.
Foundation Inspection
4
https://referencesource.org/prerequisite-sequencing-regulated-processes/mecklenburg-county-north-carolina-foundation-inspection/
[ "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
before any wall or ceiling covering is applied
mecklenburg-county-north-carolina-insulation-inspection
Mecklenburg County, North Carolina
after an approved building framing and trade rough-in inspections
Residential building inspection sequence
https://code.mecknc.gov/inspections/schedule
7. Insulation Inspection To be made after an approved building framing and trade rough-in inspections. All insulation and vapor retarders must be in place, but before any wall or ceiling covering is applied. Blown-in ceiling insulation may be inspected at the final inspection if all areas are accessible.
Insulation Inspection
7
https://referencesource.org/prerequisite-sequencing-regulated-processes/mecklenburg-county-north-carolina-insulation-inspection/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
null
mecklenburg-county-north-carolina-monolithic-slab-inspection-ms
Mecklenburg County, North Carolina
the footing and slab preparations described are in place prior to the inspection
Residential building inspection sequence
https://code.mecknc.gov/inspections/schedule
3. Monolithic Slab Inspection (MS) A monolithic slab is a combination of footing, and slab where the footing and slab preparations described are in place prior to the inspection.
Monolithic Slab Inspection (MS)
3
https://referencesource.org/prerequisite-sequencing-regulated-processes/mecklenburg-county-north-carolina-monolithic-slab-inspection-ms/
[ "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
before any wall, ceiling finish, or building insulation is installed
mecklenburg-county-north-carolina-rough-in-inspection
Mecklenburg County, North Carolina
after all parts of the building framing are in place
Residential building inspection sequence
https://code.mecknc.gov/inspections/schedule
5. Rough-In Inspection To be made on parts of the electrical, plumbing, heating/ventilation, or cooling system that will be hidden from view in the finished building after all parts of the building framing are in place, but before any wall, ceiling finish, or building insulation is installed.
Rough-In Inspection
5
https://referencesource.org/prerequisite-sequencing-regulated-processes/mecklenburg-county-north-carolina-rough-in-inspection/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
null
mecklenburg-county-north-carolina-sheathing-inspection-optional
Mecklenburg County, North Carolina
null
Residential building inspection sequence
https://code.mecknc.gov/inspections/schedule
6A. Sheathing Inspection (Optional) This is an optional inspection provided for an extra fee of $50.00 per site visit ($25.00 per townhouse when grouped in pairs). This may be used to inspection house wrap, flashings, lintels, window and door installations to allow exterior wallcovering to be installed in advance of a ...
Sheathing Inspection (Optional)
6A
https://referencesource.org/prerequisite-sequencing-regulated-processes/mecklenburg-county-north-carolina-sheathing-inspection-optional/
[ "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
before any concrete is placed
mecklenburg-county-north-carolina-under-slab-inspection-for-habitable-spaces
Mecklenburg County, North Carolina
after all forms have been placed, all electrical plumbing and/or heating and air conditioning facilities, all crushed stone, a vapor retarder, insulation, all reinforcing steel with supports and tied and/or all welded wire fabric is installed
Residential building inspection sequence
https://code.mecknc.gov/inspections/schedule
2. Under Slab Inspection for Habitable Spaces To be made after all forms have been placed, all electrical plumbing and/or heating and air conditioning facilities, all crushed stone, a vapor retarder, insulation, all reinforcing steel with supports and tied and/or all welded wire fabric is installed, when required, and ...
Under Slab Inspection for Habitable Spaces
2
https://referencesource.org/prerequisite-sequencing-regulated-processes/mecklenburg-county-north-carolina-under-slab-inspection-for-habitable-spaces/
[ "hold_point", "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
null
united-states-cbp-appendix-d-stand-alone-continuous-isf-bonds
United States (CBP)
null
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/documents/10_2faq_0.pdf
Appendix D stand-alone continuous ISF bonds must be submitted to, and approved by CBP’s Office of Finance in advance of the filing of an ISF. Once approved, CBP will record the bond information within the Automated Commercial System (ACS) and issue a unique bond identification number.
Appendix D stand-alone continuous ISF bonds
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-appendix-d-stand-alone-continuous-isf-bonds/
[ "deadline", "step_name" ]
null
null
in advance of the filing of an ISF
[ "jurisdiction", "process" ]
null
united-states-cbp-bill-of-lading-number
United States (CBP)
Without the bill of lading number, the ISF cannot be matched to a customs manifest
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/assets/documents/2018-Nov/Updated%20ISF%20FAQ%20FINAL%2011282018.pdf
The ISF Importer must obtain the bill of lading number, as it is an integral part of the security filing. Without the bill of lading number, the ISF cannot be matched to a customs manifest. The bill of lading number is part of the customs manifest information that is already required to be presented to CBP by the carri...
bill of lading number
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-bill-of-lading-number/
[ "deadline", "prerequisite", "step_name" ]
null
null
24 hours prior to the cargo being laden on a vessel destined to the United States
[ "jurisdiction", "process" ]
null
united-states-cbp-change-the-in-bond-entry-into-a-consumption-entry
United States (CBP)
Such permission would only be granted upon receipt by Customs and Border Protection (CBP) of a complete Importer Security Filing as required by part 149 of this chapter
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/documents/10_2faq_0.pdf
“[permission to] change the in-bond entry into a consumption entry must be obtained from the port director of the port of origin. Such permission would only be granted upon receipt by Customs and Border Protection (CBP) of a complete Importer Security Filing as required by part 149 of this chapter.”
change the in-bond entry into a consumption entry
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-change-the-in-bond-entry-into-a-consumption-entry/
[ "prerequisite", "step_name" ]
null
null
null
[ "jurisdiction", "process" ]
null
united-states-cbp-ct-compliant-transaction
United States (CBP)
All data is present and is based upon the best information available at the time of the filing
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/assets/documents/2018-Nov/Updated%20ISF%20FAQ%20FINAL%2011282018.pdf
CT - Compliant Transaction – All data is present and is based upon the best information available at the time of the filing; no special flexibility rules apply. If CT is used, the ISF can be updated if necessary, but CBP does not necessarily expect to see updates for these filings. CT is also used to finalize a FR, FT ...
CT - Compliant Transaction
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-ct-compliant-transaction/
[ "prerequisite", "step_name" ]
null
null
null
[ "jurisdiction", "process" ]
null
united-states-cbp-early-filing-of-isf
United States (CBP)
a bond can be secured in time for the filing
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/assets/documents/2018-Nov/Updated%20ISF%20FAQ%20FINAL%2011282018.pdf
Early filing of ISF is encouraged as it allows more time to make amendments and it is a good practice to ensure that a bond can be secured in time for the filing.
Early filing of ISF
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-early-filing-of-isf/
[ "prerequisite", "step_name" ]
null
null
null
[ "jurisdiction", "process" ]
null
united-states-cbp-fr-flexible-range
United States (CBP)
the ISF must be updated as soon as better information becomes available
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/assets/documents/2018-Nov/Updated%20ISF%20FAQ%20FINAL%2011282018.pdf
FR - Flexible Range – A range of data for the Manufacturer, and/or Ship To Party, and/or Country of Origin, and/or Commodity HTSUS number has been provided. In these cases, the ISF must be updated as soon as better information becomes available, but in any event no later than 24 hours prior to arrival. If FR is used, C...
FR - Flexible Range
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-fr-flexible-range/
[ "deadline", "prerequisite", "step_name" ]
null
null
no later than 24 hours prior to arrival
[ "jurisdiction", "process" ]
null
united-states-cbp-frob
United States (CBP)
null
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/assets/documents/2018-Nov/Updated%20ISF%20FAQ%20FINAL%2011282018.pdf
Similarly, for FROB, the required elements must be submitted prior to lading aboard a vessel destined to the United States.
FROB
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-frob/
[ "deadline", "step_name" ]
null
null
prior to lading aboard a vessel destined to the United States
[ "jurisdiction", "process" ]
null
united-states-cbp-ft-flexible-timing
United States (CBP)
The ISF must be updated as soon as better information becomes available
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/assets/documents/2018-Nov/Updated%20ISF%20FAQ%20FINAL%2011282018.pdf
FT - Flexible Timing – The CS (consolidator name/address) and/or the LG (stuffing location) has not been provided. The ISF must be updated as soon as better information becomes available, but in any event no later than 24 hours prior to arrival. If FT is used, CBP will expect to receive a timely update.
FT - Flexible Timing
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-ft-flexible-timing/
[ "deadline", "prerequisite", "step_name" ]
null
null
no later than 24 hours prior to arrival
[ "jurisdiction", "process" ]
null
united-states-cbp-fx-flexible-range-and-flexible-timing
United States (CBP)
The ISF must be updated as soon as better information becomes available
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/assets/documents/2018-Nov/Updated%20ISF%20FAQ%20FINAL%2011282018.pdf
FX - Flexible Range and Flexible Timing - A range of data as described in FR has been provided and the CS (consolidator name/address) and/or LG (stuffing location) have not been provided. The ISF must be updated as soon as better information becomes available, but in any event no later than 24 hours prior to arrival. I...
FX - Flexible Range and Flexible Timing
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-fx-flexible-range-and-flexible-timing/
[ "deadline", "prerequisite", "step_name" ]
null
null
no later than 24 hours prior to arrival
[ "jurisdiction", "process" ]
null
united-states-cbp-isf-10-will-be-replacing-the-existing-isf-5
United States (CBP)
an active ISF-5 filing must already exist for this shipment against the same bill of lading number (i.e., lowest AMS bill of lading number) in order for this new filing to be valid
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/documents/10_2faq_0.pdf
In these instances, a new ISF-10 must be created and ISF Submission Type “3” must be selected to denote that an ISF-10 will be replacing the existing ISF-5. Note that an active ISF-5 filing must already exist for this shipment against the same bill of lading number (i.e., lowest AMS bill of lading number) in order for ...
ISF-10 will be replacing the existing ISF-5
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-isf-10-will-be-replacing-the-existing-isf-5/
[ "prerequisite", "step_name" ]
null
null
null
[ "jurisdiction", "process" ]
null
united-states-cbp-isf-elements
United States (CBP)
null
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/assets/documents/2018-Nov/Updated%20ISF%20FAQ%20FINAL%2011282018.pdf
For ISF elements that must be submitted no later than 24 hours before the cargo is laden aboard the vessel at the foreign port, the elements must be submitted no later than 24 hours before the cargo is laden aboard a vessel destined to the United States.
ISF elements
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-isf-elements/
[ "deadline", "step_name" ]
null
null
no later than 24 hours before the cargo is laden aboard a vessel destined to the United States
[ "jurisdiction", "process" ]
null
united-states-cbp-isfs-for-break-bulk-cargo
United States (CBP)
Break-bulk cargo that is exempt from the timing requirements of the 24 Hour Rule are automatically exempt from the timing requirements of the ISF filing
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/documents/10_2faq_0.pdf
Break-bulk cargo that is exempt from the timing requirements of the 24 Hour Rule are automatically exempt from the timing requirements of the ISF filing. ISFs for break-bulk cargo that are exempt from the timing requirements of the 24 Hour Rule must be filed no later than 24 hours prior to arrival.
ISFs for break-bulk cargo
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-isfs-for-break-bulk-cargo/
[ "deadline", "prerequisite", "step_name" ]
null
null
no later than 24 hours prior to arrival
[ "jurisdiction", "process" ]
null
united-states-cbp-late-isfs
United States (CBP)
null
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/assets/documents/2018-Nov/Updated%20ISF%20FAQ%20FINAL%2011282018.pdf
H. Late ISFs 1. If an ISF is filed the day of the vessel sail date, will there be a fine or enforcement of some kind? Because the ISF is required at least 24 hours prior to the vessel departure, a filing that is completed the same day the vessel sails will be considered a violation and it can be expected that CBP will ...
Late ISFs
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-late-isfs/
[ "deadline", "step_name" ]
null
null
at least 24 hours prior to the vessel departure
[ "jurisdiction", "process" ]
Release of shipments with no associated ISF will be withheld until the ISF is provided
united-states-cbp-release-of-shipments
United States (CBP)
null
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/assets/documents/2018-Nov/Updated%20ISF%20FAQ%20FINAL%2011282018.pdf
CBP has been in full enforcement phase of the ISF since July 9, 2013. Release of shipments with no associated ISF will be withheld until the ISF is provided.
Release of shipments
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-release-of-shipments/
[ "hold_point", "step_name" ]
null
null
null
[ "jurisdiction", "process" ]
null
united-states-cbp-step-1
United States (CBP)
null
Appendix D stand-alone single transaction ISF bond submission
https://www.cbp.gov/sites/default/files/documents/10_2faq_0.pdf
Step 1: The ISF Importer, or its agent, must denote the usage of the Appendix D stand- alone single transaction ISF bond on the ISF by identifying bond activity code 16, bond type 9 (single transaction), the valid surety code and the bond reference number.
Step 1
1
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-step-1/
[ "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
null
united-states-cbp-step-2
United States (CBP)
After CBP has received and accepted the ISF
Appendix D stand-alone single transaction ISF bond submission
https://www.cbp.gov/sites/default/files/documents/10_2faq_0.pdf
Step 2: After CBP has received and accepted the ISF, the ISF filer will receive a unique ISF transaction number from CBP. The ISF Importer, or its agent, must affix a legible copy of the ISF transaction number (e.g., typed and of a font size 12) onto the Appendix D stand-alone ISF bond.
Step 2
2
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-step-2/
[ "prerequisite", "step_name", "step_order" ]
null
null
null
[ "jurisdiction", "process" ]
null
united-states-cbp-step-3
United States (CBP)
null
Appendix D stand-alone single transaction ISF bond submission
https://www.cbp.gov/sites/default/files/documents/10_2faq_0.pdf
Step 3: An electronic copy of the bond containing the unique ISF transaction number must be created in a .pdf or .tif format and e-mailed to the ISF_Bond@cbp.dhs.gov mailbox within 12 hours of receipt of the unique ISF transaction number.
Step 3
3
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-step-3/
[ "deadline", "step_name", "step_order" ]
null
null
within 12 hours of receipt of the unique ISF transaction number
[ "jurisdiction", "process" ]
null
united-states-cbp-the-isf-must-be-amended
United States (CBP)
null
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/assets/documents/2018-Nov/Updated%20ISF%20FAQ%20FINAL%2011282018.pdf
The ISF must be amended if there is a change or if more accurate information becomes available before the goods enter the limits of the port of first arrival in the United States.
The ISF must be amended
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-the-isf-must-be-amended/
[ "deadline", "step_name" ]
null
null
before the goods enter the limits of the port of first arrival in the United States
[ "jurisdiction", "process" ]
null
united-states-cbp-written-permission-from-the-local-cbp-port-director
United States (CBP)
CBP expects the new ISF-10 to be completed electronically prior to seeking the written permission from the local CBP port director
Importer Security Filing (ISF)
https://www.cbp.gov/sites/default/files/documents/10_2faq_0.pdf
In terms of the business process, CBP expects the new ISF-10 to be completed electronically prior to seeking the written permission from the local CBP port director. Accordingly, the ISF-10 transaction number needs to be referenced in the written letter to the local port director as part of the request for the change f...
written permission from the local CBP port director
null
https://referencesource.org/prerequisite-sequencing-regulated-processes/united-states-cbp-written-permission-from-the-local-cbp-port-director/
[ "prerequisite", "step_name" ]
null
null
null

What must pass before the next step: mandated step order in regulated processes

Canonical, always-current version: https://referencesource.org/prerequisite-sequencing-regulated-processes/ Machine-readable: https://referencesource.org/prerequisite-sequencing-regulated-processes/data.json — this mirror is a point-in-time copy.

  • Last verified: 2026-08-11
  • Stale after: 2027-08-11 (past this date, prefer the canonical copy — it re-verifies on a cadence this snapshot does not)
  • Records: 37

The mandated order of steps in multi-step regulated processes, from the authority that enforces the order: which inspection or filing must be approved before the next one may happen, what may not proceed until it passes, and the deadline attached to it. One record is one step in one authority's published sequence. Covers municipal building inspection sequences (the rough-in must pass before the wall closes; no concrete before the footing inspection) and the US import Importer Security Filing chain (ISF no later than 24 hours before lading; flexible filings finalised no later than 24 hours before arrival; cargo release withheld without an ISF). Answers 'did I need an inspection before drywall', 'what order do building inspections happen in', 'when does the ISF have to be filed', and 'what happens if the ISF is late'. The sequence is usually published only as prose on the enforcing authority's own page, one jurisdiction at a time; no comparison table exists anywhere.

Provenance — what every record carries

Every record carries source (the URL the value was read from) and source_quote (a verbatim quote from that page stating it). A value you cannot check against its page is indistinguishable from an invented one; these can all be checked. Each record is also individually addressable on the canonical site at its url.

Licence position

Facts extracted from the freely published pages of the authorities that enforce each sequence — municipal building departments and US Customs and Border Protection — with a short attributed quote and a link back. Inspection order and filing deadlines are public regulatory facts. No source page used carries a restrictive notice; US federal documents are public domain.

Facts are not copyrightable; what this dataset takes from each source is a fact plus a short attributed quote linking back to the page that states it.

Sources

Fields

See any record in data/records.jsonl — field names are self-describing, and the canonical page for each record renders them with labels: https://referencesource.org/prerequisite-sequencing-regulated-processes/

Downloads last month