Dataset Viewer
Auto-converted to Parquet Duplicate
derived_fields
listlengths
1
1
escrow_required
stringclasses
9 values
id
stringlengths
4
14
milestone_reduction
stringlengths
4
180
private_cap_pct
stringclasses
10 values
public_cap_pct
stringlengths
2
77
release_deadline
stringlengths
18
128
source
stringlengths
44
112
source_quote
stringlengths
78
951
state
stringlengths
4
14
statutory_citation
stringlengths
11
67
url
stringlengths
72
82
verified_fields
listlengths
1
3
[ "statutory_citation" ]
no (substitute security option available)
arizona
at 50% completion, half of retained amount returned and rate drops to 5%
no statutory cap in this section
10% before 50% complete; 5% after 50% complete
within 60 days after final completion and acceptance
https://codes.findlaw.com/az/title-41-state-government/az-rev-st-sect-41-2576.html
Ten per cent of all construction contract payments shall be retained by this state as insurance of proper performance of the contract or, at the option of the contractor, a substitute security may be provided by the contractor in an authorized form pursuant to rules adopted by the director.
Arizona
Ariz. Rev. Stat. § 41-2576
https://referencesource.org/construction-retainage-limits-by-state/arizona/
null
[ "statutory_citation" ]
not addressed in this statute
california
after 95% of the work has been completed, the department may reduce the funds withheld to an amount not less than 125 percent of the estimated value of the work yet to be completed
not addressed in this statute
5%
upon final completion and acceptance of the project
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?sectionNum=10261.&lawCode=PCC
The department shall withhold not more than 5 percent of the contract price until final completion and acceptance of the project. However, at any time after 95 percent of the work has been completed, the department may reduce the funds withheld to an amount not less than 125 percent of the estimated value of the work y...
California
Cal. Pub. Cont. Code § 10261
https://referencesource.org/construction-retainage-limits-by-state/california/
[ "milestone_reduction" ]
[ "statutory_citation" ]
no
colorado
none
5%
5%
not specified in this section
https://colorado.public.law/statutes/crs_38-46-103
A property owner, contractor, or subcontractor shall not withhold as retainage more than five percent of the price of the work completed under the contract or subcontract.
Colorado
C.R.S. § 38-46-103
https://referencesource.org/construction-retainage-limits-by-state/colorado/
null
[ "statutory_citation" ]
public only
connecticut
not specified on this page
not specified on this page
not specified on this page
not specified on this page
https://constructioncoverage.com/glossary/retainage
Some states, including Connecticut, Louisiana, Michigan, Ohio, and Tennessee, require retainage for certain state-funded public projects to be held in interest-bearing escrow accounts
Connecticut
not specified on this page
https://referencesource.org/construction-retainage-limits-by-state/connecticut/
[ "state" ]
[ "statutory_citation" ]
no
florida
none
no statutory cap
5%
same time limits for payment of a payment request apply regardless of whether the payment request is for, or includes, retainage
http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0200-0299/0255/Sections/0255.078.html
a public entity may withhold from each progress payment made to the contractor an amount not exceeding 5 percent of the payment as retainage.
Florida
Fla. Stat. § 255.078
https://referencesource.org/construction-retainage-limits-by-state/florida/
null
[ "statutory_citation" ]
no
georgia
none
no statutory cap
5%
within 30 days after invoice at substantial completion
https://codes.findlaw.com/ga/title-13-contracts/ga-code-sect-13-10-80.html
Retainage to a maximum of 5 percent of each progress payment. At the discretion of the owner and with the approval of the contractor, the retainage of each subcontractor may be released separately as the subcontractor completes his or her work.
Georgia
Ga. Code Ann. § 13-10-80
https://referencesource.org/construction-retainage-limits-by-state/georgia/
null
[ "statutory_citation" ]
no
illinois
at 50% completion, retainage reduced to no more than 5%
10% before 50% complete; 5% after 50% complete
10% before 50% complete; 5% after 50% complete
not specified in this section
https://www.ilga.gov/legislation/ilcs/fulltext.asp?DocName=081506030K20
A construction contract may provide for the withholding of retainage of up to 10% of any payment made prior to the completion of 50% of the contract. When a contract is 50% complete, retainage withheld shall be reduced so that no more than 5% is held. After the contract is 50% complete, no more than 5% of the amount of...
Illinois
815 ILCS 603/20
https://referencesource.org/construction-retainage-limits-by-state/illinois/
[ "escrow_required", "milestone_reduction" ]
[ "statutory_citation" ]
yes
indiana
none
no statutory cap
per contract terms (escrow required when withheld)
per contract terms
https://codes.findlaw.com/in/title-5-state-and-local-administration/in-code-sect-5-16-5-5-3.html
provision for retainage shall include in their respective contracts a provision that at the time any retainage is withheld, the state agency and/or contractor shall place such retainage in an escrow account, with a bank, savings and loan institution, or the State of Indiana or an instrumentality thereof, as escrow agen...
Indiana
Ind. Code § 5-16-5-5.3
https://referencesource.org/construction-retainage-limits-by-state/indiana/
[ "state" ]
[ "statutory_citation" ]
no
iowa
none
no statutory cap in this section
5%
per section 573.14
https://www.legis.iowa.gov/docs/iacode/2001/573/12.html
The public corporation shall retain from each monthly payment not more than five percent of that amount which is determined to be due according to the estimate of the architect or engineer.
Iowa
Iowa Code § 573.12
https://referencesource.org/construction-retainage-limits-by-state/iowa/
null
[ "statutory_citation" ]
no
kentucky
retainage held after fifty-one percent (51%) of the construction project has been completed shall not be more than five percent (5%)
10% until 50% complete, then 5%
10% until 50% complete, then 5%
30 days after substantial completion
https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=35259
until fifty percent (50%) of the construction project has been completed in accordance with the contract, a contracting entity, contractor, or subcontractor may withhold no more than ten percent (10%) retainage from the amount of any undisputed payment due, and retainage held after fifty-one percent (51%) of the constr...
Kentucky
KRS 371.410
https://referencesource.org/construction-retainage-limits-by-state/kentucky/
[ "escrow_required", "milestone_reduction" ]
[ "statutory_citation" ]
yes
louisiana
not specified on this page
not specified on this page
not specified on this page
not specified on this page
https://constructioncoverage.com/glossary/retainage
Some states, including Connecticut, Louisiana, Michigan, Ohio, and Tennessee, require retainage for certain state-funded public projects to be held in interest-bearing escrow accounts, providing additional security for contractors. This requirement does not typically extend to private projects, although some states, su...
Louisiana
not specified on this page
https://referencesource.org/construction-retainage-limits-by-state/louisiana/
[ "state" ]
[ "statutory_citation" ]
no
maryland
none
5%
5%
90 days after the date of substantial completion
https://codes.findlaw.com/md/real-property/md-code-real-prop-sect-9-304.html
(e) Undisputed retention proceeds retained by an owner under this section shall be paid within 90 days after the date of substantial completion, as defined by the applicable contract or subcontract. <https://codes.findlaw.com/md/real-property/md-code-real-prop-sect-9-303/> Previous Part of Code <https://codes.findlaw.c...
Maryland
Md. Code, Real Prop. § 9-304
https://referencesource.org/construction-retainage-limits-by-state/maryland/
[ "escrow_required", "release_deadline", "state" ]
[ "statutory_citation" ]
no
massachusetts
none
5% (contracts ≥$3M, excluding residential 1–4 units)
5%
not later than 14 days after substantial completion, notice submitted; retainage due per contract terms
https://codes.findlaw.com/ma/part-i-administration-of-the-government-ch-1-182/ma-gen-laws-ch-149-sect-29f/
No contract for construction shall include retainage that exceeds 5 per cent of any progress payment.
Massachusetts
Mass. Gen. Laws ch. 149, § 29F
https://referencesource.org/construction-retainage-limits-by-state/massachusetts/
[ "escrow_required" ]
[ "statutory_citation" ]
public only
michigan
not specified on this page
not specified on this page
not specified on this page
not specified on this page
https://constructioncoverage.com/glossary/retainage
Some states, including Connecticut, Louisiana, Michigan, Ohio, and Tennessee, require retainage for certain state-funded public projects to be held in interest-bearing escrow accounts
Michigan
not specified on this page
https://referencesource.org/construction-retainage-limits-by-state/michigan/
[ "state" ]
[ "statutory_citation" ]
no
minnesota
owner may reduce or eliminate retainage if work is progressing satisfactorily
5%
5%
60 days after substantial completion
https://www.revisor.mn.gov/statutes/cite/337.10
Retainage on a building and construction contract may not exceed five percent. An owner or owner's agent may reduce the amount of retainage and may eliminate retainage on any monthly contract payment if, in the owner's opinion, the work is progressing satisfactorily.
Minnesota
Minn. Stat. § 337.10
https://referencesource.org/construction-retainage-limits-by-state/minnesota/
[ "milestone_reduction" ]
[ "statutory_citation" ]
no
missouri
public owner may reduce or eliminate retainage if work is proceeding satisfactorily
no statutory cap
5%
30 days after acceptance and receipt of required documentation
https://revisor.mo.gov/main/OneSection.aspx?bid=905&hl=&section=34.057
Retainage withheld on any construction contract or subcontract for public works projects shall not exceed five percent of the value of the contract or subcontract.
Missouri
RSMo § 34.057
https://referencesource.org/construction-retainage-limits-by-state/missouri/
null
[ "statutory_citation" ]
no
nebraska
at 50% completion, retainage reduced to no more than 5%
10% before 50% complete; 5% after 50% complete
10% before 50% complete; 5% after 50% complete
after substantial completion, withholding capped at 125% of estimated remaining cost
https://codes.findlaw.com/ne/chapter-45-interest-loans-and-debt/ne-rev-st-sect-45-1204.html
For retainage, in an amount not to exceed the amount specified in the applicable contract, which shall not exceed a rate of ten percent. If the scope of work for the contractor or subcontractor from which retainage is withheld is fifty percent complete and if the contractor or subcontractor has performed work in accord...
Nebraska
Neb. Rev. Stat. § 45-1204
https://referencesource.org/construction-retainage-limits-by-state/nebraska/
[ "escrow_required", "milestone_reduction" ]
[ "statutory_citation" ]
no
nevada
after 50% of the work has been completed, the public body may pay remaining progress payments without withholding additional retainage
no statutory cap
5%
within 30 days after occupancy, use, or recording of notice of completion, whichever occurs first
https://www.leg.state.nv.us/nrs/nrs-338.html
Ninety-five percent of the amount of any progress payment must be paid and 5 percent withheld as retainage until 50 percent of the work required by the contract has been performed.
Nevada
NRS 338.515
https://referencesource.org/construction-retainage-limits-by-state/nevada/
null
[ "statutory_citation" ]
not specified on this page
new-mexico
not specified on this page
0%
0%
not specified on this page
https://constructioncoverage.com/glossary/retainage
New Mexico prohibits retainage for most publicly and privately funded projects
New Mexico
not specified on this page
https://referencesource.org/construction-retainage-limits-by-state/new-mexico/
[ "state" ]
[ "statutory_citation" ]
no
new-york
none
5%
5%
30 days after final approval of the work
https://newyork.public.law/laws/n.y._general_business_law_section_756-c
By mutual agreement of the relevant parties an owner may retain no more than five per centum of the contract sum as retainage. A contractor or subcontractor may also retain no more than five per centum for retainage and in no case shall retainage exceed the actual percentage retained by the owner. Retainage shall be re...
New York
N.Y. Gen. Bus. Law § 756-C
https://referencesource.org/construction-retainage-limits-by-state/new-york/
[ "escrow_required" ]
[ "statutory_citation" ]
no
north-carolina
retainage eliminated after 50% complete with surety consent
no statutory cap
5%
60 days after substantial completion or beneficial occupancy
https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_143/GS_143-134.1.html
The owner shall not retain more than five percent (5%) of any periodic payment due a prime contractor.
North Carolina
N.C. Gen. Stat. § 143-134.1
https://referencesource.org/construction-retainage-limits-by-state/north-carolina/
[ "public_cap_pct" ]
[ "statutory_citation" ]
no
ohio
none
no statutory cap
4% (payments at not less than 96%)
governed by sections 153.13 and 153.14
https://codes.ohio.gov/ohio-revised-code/section-153.12
Partial payments to the contractor for labor performed under either a unit or lump sum price contract shall be made at a rate of not less than ninety-six per cent of the estimates prepared by the contractor and approved by the architect or engineer.
Ohio
Ohio Rev. Code § 153.12
https://referencesource.org/construction-retainage-limits-by-state/ohio/
null
[ "statutory_citation" ]
yes (contracts exceeding $500,000)
oregon
none
5%
5%
interest commences 30 days after completion and acceptance
https://oregon.public.law/statutes/ors_701.420
An owner, contractor or subcontractor may withhold as retainage an amount equal to not more than five percent of the contract price of the work completed.
Oregon
ORS 701.420
https://referencesource.org/construction-retainage-limits-by-state/oregon/
null
[ "statutory_citation" ]
no
pennsylvania
contractor or subcontractor may post a maintenance bond for 120% of retainage upon reaching substantial completion to facilitate release
no statutory percentage cap
no statutory percentage cap
30 days after final acceptance of the work
https://legis.state.pa.us/WU01/LI/LI/US/HTM/1994/0/0007..HTM?1=
If payments under a construction contract are subject to retainage, any amounts which have been retained during the performance of the contract and which are due to be released to the contractor upon final completion shall be paid within 30 days after final acceptance of the work.
Pennsylvania
73 P.S. § 509 (Contractor and Subcontractor Payment Act, Section 9)
https://referencesource.org/construction-retainage-limits-by-state/pennsylvania/
[ "release_deadline" ]
[ "statutory_citation" ]
no
south-carolina
none
no statutory cap
no statutory cap
21 days for owner to contractor; 7 days for contractor to subcontractor after receipt
https://www.scstatehouse.gov/code/t29c006.php
Nothing in this chapter prevents the owner, the contractor, or a subcontractor from withholding application and certification for payment because of the following: unsatisfactory job progress, defective construction not remedied, disputed work, third party claims filed or reasonable evidence that claim will be filed, f...
South Carolina
S.C. Code Ann. § 29-6-40
https://referencesource.org/construction-retainage-limits-by-state/south-carolina/
null
[ "statutory_citation" ]
yes
tennessee
none
5%
5%
90 days after completion of the work or 90 days after substantial completion
https://law.justia.com/codes/tennessee/title-66/chapter-34/part-1/section-66-34-103/
<https://law.justia.com/codes/tennessee/title-66/chapter-34/part-1/section-66-34-104/> Next (a) All construction contracts on any project in this state, both public and private, may provide for the withholding of retainage; provided, however, that the retainage amount may not exceed five percent (5%) of the amount of t...
Tennessee
Tenn. Code Ann. § 66-34-103
https://referencesource.org/construction-retainage-limits-by-state/tennessee/
[ "private_cap_pct", "public_cap_pct", "state" ]
[ "statutory_citation" ]
optional (contracts ≥$10M, by agreement)
texas
none
no statutory cap
10% (contracts <$5M); 5% (contracts ≥$5M)
upon completion of the work required to be performed under the contract
https://texas.public.law/statutes/tex._gov't_code_section_2252.032
if the total value of a public works contract is less than $5 million, a governmental entity may not withhold retainage in an amount that exceeds 10 percent of the contract price and the rate of retainage may not exceed 10 percent for any item in a bid schedule or schedule of values for the project, including materials...
Texas
Tex. Gov't Code § 2252.032
https://referencesource.org/construction-retainage-limits-by-state/texas/
null
[ "statutory_citation" ]
no
virginia
none
no statutory cap
5%
included in the final payment
https://law.lis.virginia.gov/vacode/2.2-4333/
the contractor shall be paid at least ninety-five percent of the earned sum when payment is due, with no more than five percent being retained to ensure faithful performance of the contract. All amounts withheld may be included in the final payment.
Virginia
Va. Code § 2.2-4333
https://referencesource.org/construction-retainage-limits-by-state/virginia/
[ "escrow_required", "release_deadline" ]
[ "statutory_citation" ]
optional
washington
contractor may request retainage be reduced to 100% of the value of work remaining
no statutory cap
5%
60 days after completion of all contract work
https://app.leg.wa.gov/rcw/default.aspx?cite=60.28.011
public improvement contracts must provide, and public bodies must reserve, a contract retainage not to exceed five percent of the moneys earned by the contractor as a trust fund for the protection and payment of: (i) The claims of any person arising under the contract
Washington
RCW 60.28.011
https://referencesource.org/construction-retainage-limits-by-state/washington/
null
[ "statutory_citation" ]
no
wisconsin
at 50% completion, no further retainage withheld (full payments resume)
no statutory cap in this section
5% until 50% complete; 0% after 50% complete (unless unsatisfactory progress)
upon substantial completion
https://docs.legis.wisconsin.gov/document/statutes/66.0901
The retainage shall be an amount equal to not more than 5 percent of the estimate until 50 percent of the work has been completed. At 50 percent completion, further partial payments shall be made in full to the contractor and no additional amounts may be retained unless the architect or engineer certifies that the job ...
Wisconsin
Wis. Stat. § 66.0901(9)(b)
https://referencesource.org/construction-retainage-limits-by-state/wisconsin/
[ "escrow_required", "milestone_reduction", "public_cap_pct" ]

Construction retainage limits by US state — maximum withholding percentages, release deadlines, escrow requirements, and public vs private distinctions with statutory citations

Canonical, always-current version: https://referencesource.org/construction-retainage-limits-by-state/ Machine-readable: https://referencesource.org/construction-retainage-limits-by-state/data.json — this mirror is a point-in-time copy.

  • Last verified: 2026-08-17
  • Stale after: 2027-08-17 (past this date, prefer the canonical copy — it re-verifies on a cadence this snapshot does not)
  • Records: 30

State-by-state comparison of the statutory rules governing retainage (retention) on construction contracts. Each record is one state with the maximum retainage percentage for public and private projects, the deadline for releasing retained funds after substantial completion, whether retainage must be held in an interest-bearing escrow account, whether the cap is reduced after a completion milestone (e.g. 50% complete), and the statutory citation. Caps range from 0% (New Mexico) to 10%, with a strong trend toward 5%. Answers 'how much retainage can be withheld on my project in [state]', 'when must retainage be released', and 'does my state require retainage escrow'.

Provenance — what every record carries

Every record carries source (the URL the value was read from) and source_quote (a verbatim quote from that page stating it). A value you cannot check against its page is indistinguishable from an invented one; these can all be checked. Each record is also individually addressable on the canonical site at its url.

Licence position

unknown

Facts are not copyrightable; what this dataset takes from each source is a fact plus a short attributed quote linking back to the page that states it.

Sources

Fields

See any record in data/records.jsonl — field names are self-describing, and the canonical page for each record renders them with labels: https://referencesource.org/construction-retainage-limits-by-state/

Downloads last month
33