code_citation stringclasses 4
values | commencement_deadline stringclasses 4
values | derived_fields listlengths 2 2 | id stringclasses 7
values | inactivity_window stringclasses 4
values | jurisdiction stringclasses 3
values | permit_type stringclasses 6
values | source stringclasses 3
values | source_quote stringclasses 7
values | source_type stringclasses 2
values | url stringclasses 7
values | verified_fields listlengths 3 6 | maximum_life stringclasses 2
values | renewal_fee_basis stringclasses 2
values | extension_rule stringclasses 3
values |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
105.5 | null and void if the authorized work is not begun and inspected pursuant to Section 109 within one year after the permit is issued | [
"permit_type",
"source_type"
] | building-permit-adopted-code-district-of-columbia | if the authorized work is suspended, abandoned or not inspected pursuant to Section 109 for a period of one year | District of Columbia | building permit | https://up.codes/s/expiration-of-permit | permit issued shall become null and void if the authorized work is not begun and inspected pursuant to <https://up.codes/viewer/district-of-columbia/ibc-2012/chapter/new_1/administration-and-enforcement#new_109> Section 109 within one year after the <https://up.codes/viewer/district-of-columbia/ibc-2012/chapter/2/defin... | adopted code | https://referencesource.org/building-permit-validity-and-renewal/building-permit-adopted-code-district-of-columbia/ | [
"code_citation",
"commencement_deadline",
"inactivity_window",
"jurisdiction"
] | null | null | null |
Sec. 91.1.105.5.2 | it will expire if the work is not started within two years. To meet this requirement, the permittee must call for, and pass a valid inspection | [
"permit_type",
"source_type"
] | building-permit-department-page-san-diego-county | passing a valid inspection at least every 180 days (six months) | San Diego County | building permit | https://www.sandiegocounty.gov/content/sdc/pds/bldg-perm-exp.html | San Diego County's Building Code sets timeline requirements when building permits are issued. The work authorized by the permit must begin and demonstrate progress by certain dates, and all work must be completed within three years. From the day the permit is issued, it will expire if the work is not started within two... | department page | https://referencesource.org/building-permit-validity-and-renewal/building-permit-department-page-san-diego-county/ | [
"code_citation",
"commencement_deadline",
"inactivity_window",
"jurisdiction",
"maximum_life",
"renewal_fee_basis"
] | all work must be completed within three years | One-half of current permit fees are due upon renewal unless progress has been made (and approved) so that only a final inspection is needed, then one-quarter of current permit fees are due | null |
105.5.1 Extension of Permit | null | [
"permit_type",
"source_type"
] | building-permit-extension-of-permit-adopted-code-district-of-columbia | null | District of Columbia | building permit — extension of permit | https://up.codes/s/expiration-of-permit | 105.5.1 Extension of Permit A <https://up.codes/viewer/district-of-columbia/ibc-2012/chapter/2/definitions#permit_> permit may be extended upon written request, prior to expiration and upon a showing of good cause. The code official is authorized to grant extensions of time not to exceed 180 days per extension. Not mor... | adopted code | https://referencesource.org/building-permit-validity-and-renewal/building-permit-extension-of-permit-adopted-code-district-of-columbia/ | [
"code_citation",
"extension_rule",
"jurisdiction"
] | null | null | extensions of time not to exceed 180 days per extension. Not more than four extensions of time will be granted to any permit. The code official may issue an extension for a period of 365 days upon demonstration of need at the time of extension application, but, in no event, shall the aggregate extensions of time exceed... |
105.5.1 | invalid if the authorized work is not begun within 30 days after the permit is issued | [
"permit_type",
"source_type"
] | premises-deemed-to-be-unsafe-or-unfit-for-human-occupancy-or-abandoned-or-deteri-adopted-code-district-of-columbia | null | District of Columbia | premises deemed to be unsafe or unfit for human occupancy, or abandoned or deteriorated property | https://up.codes/s/expiration-of-permit | permit issued for work on premises, including any buildings or <https://up.codes/viewer/district-of-columbia/ibc-2012/chapter/2/definitions#other_structures_> other structures , that have been deemed to be unsafe or unfit for human occupancy (in accordance with <https://up.codes/viewer/district-of-columbia/ibc-2012/cha... | adopted code | https://referencesource.org/building-permit-validity-and-renewal/premises-deemed-to-be-unsafe-or-unfit-for-human-occupancy-or-abandoned-or-deteri-adopted-code-district-of-columbia/ | [
"code_citation",
"commencement_deadline",
"extension_rule",
"jurisdiction",
"maximum_life"
] | completed within six months after the date work is begun | null | unless the permit is extended in accordance with Section 105.5.1 |
null | invalid if the authorized work is not begun within 180 days after the permit is issued | [
"permit_type",
"source_type"
] | residential-code-adopted-code-district-of-columbia | suspended or abandoned for a period of 180 days after the date work is begun as evidenced by lack of continuous work | District of Columbia | Residential Code | https://up.codes/s/expiration-of-permit | permit issued for construction regulated by the <https://up.codes/viewer/district-of-columbia/irc-2012> Residential Code shall become invalid if the authorized work is not begun within 180 days after the <https://up.codes/viewer/district-of-columbia/ibc-2012/chapter/2/definitions#permit_> permit is issued, or if the au... | adopted code | https://referencesource.org/building-permit-validity-and-renewal/residential-code-adopted-code-district-of-columbia/ | [
"commencement_deadline",
"inactivity_window",
"jurisdiction"
] | null | null | null |
null | invalid if the authorized work is not begun within 180 days after the permit is issued | [
"permit_type",
"source_type"
] | special-flood-hazard-area-adopted-code-district-of-columbia | suspended or abandoned for a period of 180 days after the date work is begun as evidenced by a lack of continuous work | District of Columbia | Special Flood Hazard Area | https://up.codes/s/expiration-of-permit | permit issued for work that is to occur on land designated as a <https://up.codes/viewer/district-of-columbia/ibc-2012/chapter/2/definitions#special_flood_hazard_area_> Special Flood Hazard Area on the Federal Emergency Management Agency's Flood Insurance Rate Map shall become invalid if the authorized work is not begu... | adopted code | https://referencesource.org/building-permit-validity-and-renewal/special-flood-hazard-area-adopted-code-district-of-columbia/ | [
"commencement_deadline",
"inactivity_window",
"jurisdiction"
] | null | null | null |
null | null | [
"permit_type",
"source_type"
] | temporary-certificate-of-occupancy-department-page-creve-coeur-mo | null | Creve Coeur, MO | temporary certificate of occupancy | https://www.crevecoeurmo.gov/86/Sequence-of-Inspections | temporary certificate of occupancy may be issued prior to completion of the entire work covered by the permit, providing that such portion of the building can be occupied safely prior to full completion of the project, without endangering life or public welfare. The temporary certificate of occupancy may be renewed, at... | department page | https://referencesource.org/building-permit-validity-and-renewal/temporary-certificate-of-occupancy-department-page-creve-coeur-mo/ | [
"extension_rule",
"jurisdiction",
"renewal_fee_basis"
] | null | a fee of $65 each month until the final building inspection is approved | may be renewed, at the discretion of the building official, every 30 days |
Building permit expiry, progress and renewal rules by jurisdiction
Canonical, always-current version: https://referencesource.org/building-permit-validity-and-renewal/ Machine-readable: https://referencesource.org/building-permit-validity-and-renewal/data.json — this mirror is a point-in-time copy.
- Last verified: 2026-08-11
- Stale after: 2027-08-11 (past this date, prefer the canonical copy — it re-verifies on a cadence this snapshot does not)
- Records: 7
How long a building permit stays valid, what keeps it alive, what it costs to renew once it has lapsed, and how the local rule differs from the model-code section it amends. One record is one rule for one jurisdiction, placed next to the adopted code section it replaces. Answers 'how long is a building permit valid before it expires', 'does an inspection reset the permit clock', 'my building permit expired what do I do', 'building permit renewal fee after expiration', and 'IRC 105.5 permit expiration'. The memorised answer is 180 days and it is wrong in the places people ask about: unincorporated San Diego County allows two years to start work, then requires a passed inspection every 180 days, with an outer life of three years and renewal at one-half of current permit fees — one-quarter if only a final inspection remains. DC's adopted code gives one year to begin, with a 180-day carve-out for residential work and no more than four extensions per permit.
Provenance — what every record carries
Every record carries source (the URL the value was read from) and
source_quote (a verbatim quote from that page stating it). A value you
cannot check against its page is indistinguishable from an invented one;
these can all be checked. Each record is also individually addressable on
the canonical site at its url.
Licence position
Facts extracted from freely published municipal and county building department pages and from published jurisdiction-amended code sections, with a short attributed quote and a link back. Expiry periods and renewal fee bases are facts about a legal requirement, not reproductions of a standards developer's expression. UpCodes is used only for the amended-section value with a short attributed quote, never as a bulk source: its product IS the compilation of code text and it is in active litigation with ICC and ASTM over exactly that. Prefer the jurisdiction's own publication wherever it exists.
Facts are not copyrightable; what this dataset takes from each source is a fact plus a short attributed quote linking back to the page that states it.
Sources
- https://up.codes/s/expiration-of-permit
- https://www.sandiegocounty.gov/content/sdc/pds/bldg-perm-exp.html
- https://www.crevecoeurmo.gov/86/Sequence-of-Inspections
Fields
See any record in data/records.jsonl — field names are self-describing,
and the canonical page for each record renders them with labels:
https://referencesource.org/building-permit-validity-and-renewal/