Dataset Viewer
Auto-converted to Parquet Duplicate
advance_notice_days
stringclasses
7 values
delegated_authority
stringclasses
7 values
derived_fields
listlengths
2
2
emergency_notification_rules
stringclasses
7 values
id
stringclasses
7 values
jurisdiction
stringclasses
7 values
notification_fee
stringclasses
7 values
notification_trigger_threshold
stringclasses
7 values
residential_exemption
stringclasses
6 values
source
stringclasses
7 values
source_quote
stringclasses
7 values
statute_or_regulation_citation
stringclasses
7 values
url
stringclasses
7 values
verified_fields
listlengths
6
6
at least ten (10) days
Connecticut Department of Public Health, Asbestos Program
[ "jurisdiction", "statute_or_regulation_citation" ]
An Emergency notification must be filed within one (1) working day. Contractors should discuss with program staff before proceeding with an emergency filing unless the facility poses an imminent risk of harming the public.
connecticut
Connecticut
$100.00 for abatement less than 160 square feet; $100.00 plus one percent (multiply cost by 0.01) of the total abatement cost (excluding cost to reinsulate) up to a maximum fee of $5,000.00 for abatement of 160 square feet or greater; $50.00 for demolition notification; $200.00 for alternative work practice application
All asbestos abatement projects require notification; all demolitions require notification even if no asbestos is present
No specific residential exemption stated in state notification fee schedule; follows federal NESHAP exemption
https://portal.ct.gov/dph/asbestos-program/asbestos-program/asbestos-related-notification-fees
An initial asbestos notification must be post marked, or hand delivered at least ten (10) days prior to the start of asbestos abatement.
Connecticut Department of Public Health Asbestos Program notification requirements
https://referencesource.org/asbestos-notification-requirements-by-state/connecticut/
[ "advance_notice_days", "delegated_authority", "emergency_notification_rules", "notification_fee", "notification_trigger_threshold", "residential_exemption" ]
At least 10 working days
EPA, with delegation available to state agencies under 40 CFR 61.04
[ "jurisdiction", "statute_or_regulation_citation" ]
As early as possible before, but not later than, the following working day
federal-united-states
Federal (United States)
No federal fee
All demolitions regardless of asbestos amount; renovations at least 80 linear meters (260 linear feet) on pipes or at least 15 square meters (160 square feet) on other facility components, or at least 1 cubic meter (35 cubic feet) off facility components
Facility excludes residential buildings having four or fewer dwelling units
https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M
Facility means any institutional, commercial, public, industrial, or residential structure, installation, or building (including any structure, installation, or building containing condominiums or individual dwelling units operated as a residential cooperative, but excluding residential buildings having four or fewer d...
40 CFR Part 61, Subpart M
https://referencesource.org/asbestos-notification-requirements-by-state/federal-united-states/
[ "advance_notice_days", "delegated_authority", "emergency_notification_rules", "notification_fee", "notification_trigger_threshold", "residential_exemption" ]
ten (10) working day
Georgia Environmental Protection Division, Lead-Based Paint and Asbestos Program
[ "jurisdiction", "statute_or_regulation_citation" ]
Notification of the emergency situation should be submitted within 24 hours from the time of its occurrence, or from the time you are contacted with a request for emergency work to be performed
georgia
Georgia
$0.10 per square foot of friable asbestos-containing materials plus $0.10 linear foot of friable asbestos-containing materials, with a minimum of $25 for any project; but not to exceed $50 for any small project or residential dwelling project nor exceed $1,000 for any other project
All demolitions regardless of asbestos amount; any project involving ten (10) or more continuous linear feet or ten (10) or more square feet of asbestos-containing material for renovations/abatement
Legal owners or residences where four (4) or fewer dwelling units are involved, unless part of a larger project, are exempt from demolition project notification requirements
https://epd.georgia.gov/asbestos-notification-requirements
$0.10 per square foot of friable asbestos-containing materials plus $0.10 linear foot of friable asbestos-containing materials, with a minimum of $25 for any project; but not to exceed $50 for any small project or residential dwelling project nor exceed $1,000 for any other project.
Georgia Department of Natural Resources Rules for Air Quality Control, Chapter 391-3-1-.02(9)(b)7; Georgia Rules of Asbestos Removal and Encapsulation, Chapter 391-3-14
https://referencesource.org/asbestos-notification-requirements-by-state/georgia/
[ "advance_notice_days", "delegated_authority", "emergency_notification_rules", "notification_fee", "notification_trigger_threshold", "residential_exemption" ]
10 working days (per federal NESHAP)
Iowa Department of Natural Resources
[ "jurisdiction", "statute_or_regulation_citation" ]
Per federal NESHAP emergency provisions
iowa
Iowa
$100 for each required original or each annual notification for each demolition or renovation, including abatement
Projects subject to the requirements of the national emission standard for hazardous air pollutants (NESHAP) for asbestos
Follows federal NESHAP exemption for residential buildings having four or fewer dwelling units
https://iowadnr.gov/media/2084/download?inline=
Asbestos notification fee is $100 for each required original or each annual notification for each demolition or renovation, including abatement.
567 IAC 23.2(3); Iowa Environmental Protection Commission rules adopted December 15, 2015
https://referencesource.org/asbestos-notification-requirements-by-state/iowa/
[ "advance_notice_days", "delegated_authority", "emergency_notification_rules", "notification_fee", "notification_trigger_threshold", "residential_exemption" ]
five (5) calendar days
Minnesota Department of Health, Asbestos Program
[ "jurisdiction", "statute_or_regulation_citation" ]
Contact MDH and MPCA as soon as possible to verify whether the project meets the requirements of an emergency project
minnesota
Minnesota
$35 permit fee for residential projects with friable ACM less than 160 square feet; 3% of total project cost for all other notifiable projects
Friable ACM exceeding 260 linear feet on pipes, 160 square feet on other components, or 35 cubic feet; residential projects exceeding 10 linear feet, 6 square feet, or 1 cubic foot
Residential projects with friable ACM below 6 square feet, 10 linear feet, or 1 cubic foot are not notifiable
https://www.health.state.mn.us/communities/environment/asbestos/prof/notification.html
For non-residential or commercial projects (single projects, a series of small projects, and maintenance projects) where the quantity of friable ACM is greater than 160 square feet, 260 linear feet, or 35 cubic feet, the permit fee is 3%.
Minnesota Statutes 326.71; Minnesota Rules 4620
https://referencesource.org/asbestos-notification-requirements-by-state/minnesota/
[ "advance_notice_days", "delegated_authority", "emergency_notification_rules", "notification_fee", "notification_trigger_threshold", "residential_exemption" ]
at least 10 working days
Texas Department of State Health Services, Asbestos Program (TAHPR)
[ "jurisdiction", "statute_or_regulation_citation" ]
Emergency notifications may be submitted online or hardcopy by mail to the department no later than the following work day after the incident
texas
Texas
the building owner is required to pay a notification fee that is based upon the amount of asbestos removed, with a minimum fee of $55.00 and a 3% subscription fee per original notification
Renovation projects which include the disturbance of any asbestos-containing building material in a public building or the disturbance of the NESHAP threshold amount of asbestos-containing material in a facility; demolition of a building or facility, even when no asbestos is present
One private residence is not subject to the asbestos NESHAP regulations and notification is not required
https://www.dshs.texas.gov/asbestos-program/frequently-asked-questions-about-asbestos-abatement-demolition-notifications
the building owner is required to pay a notification fee that is based upon the amount of asbestos removed, with a minimum fee of $55.00 and a 3% subscription fee per original notification
TAHPR, Title 25 of the Texas Administrative Code, Chapter 295, Subchapter C, Section 295.61
https://referencesource.org/asbestos-notification-requirements-by-state/texas/
[ "advance_notice_days", "delegated_authority", "emergency_notification_rules", "notification_fee", "notification_trigger_threshold", "residential_exemption" ]
20 days
Virginia Department of Labor and Industry, Safety and Health Codes Board
[ "jurisdiction", "statute_or_regulation_citation" ]
Notification and asbestos permit fee shall be submitted within five working days after the start of the emergency abatement; emergencies include protection of life, health, or property such as leaking or ruptured pipes, accidentally damaged or fallen asbestos
virginia
Virginia
$50 for each project equal to or greater than 10 linear feet or 10 square feet up to and including 260 linear feet or 160 square feet; $160 for each project of more than 260 linear feet or 160 square feet up to and including 2600 linear feet or 1600 square feet; $470 for each project of more than 2600 linear feet or 16...
any asbestos project of 10 linear feet or more or 10 square feet or more
Follows federal NESHAP exemption for residential buildings having four or fewer dwelling units
https://law.lis.virginia.gov/admincode/title16/agency25/chapter20/section30/
Written notification of any asbestos project of 10 linear feet or more or 10 square feet or more shall be made to the department on a department form. Such notification shall be sent by facsimile transmission as set out in <https://law.lis.virginia.gov/admincode/title16/agency25/chapter20/section30/> 16VAC25-20-30 J, c...
16VAC25-20-30
https://referencesource.org/asbestos-notification-requirements-by-state/virginia/
[ "advance_notice_days", "delegated_authority", "emergency_notification_rules", "notification_fee", "notification_trigger_threshold", "residential_exemption" ]

Asbestos Abatement Notification Requirements, Thresholds, and Fees by State

Canonical, always-current version: https://referencesource.org/asbestos-notification-requirements-by-state/ Machine-readable: https://referencesource.org/asbestos-notification-requirements-by-state/data.json — this mirror is a point-in-time copy.

  • Last verified: 2026-08-15
  • Stale after: 2027-08-15 (past this date, prefer the canonical copy — it re-verifies on a cadence this snapshot does not)
  • Records: 7

Notification requirements for asbestos abatement and demolition projects vary by state. The federal NESHAP (40 CFR 61 Subpart M) requires 10 working days' notice for projects exceeding 260 linear feet, 160 square feet, or 35 cubic feet of regulated asbestos-containing material. States with delegated authority impose their own notification fees, advance-notice periods, material quantity thresholds, and exemptions. This table gives the notification trigger, advance-notice period, fee structure, and delegated authority for each state so a contractor knows what is required before starting work.

Provenance — what every record carries

Every record carries source (the URL the value was read from) and source_quote (a verbatim quote from that page stating it). A value you cannot check against its page is indistinguishable from an invented one; these can all be checked. Each record is also individually addressable on the canonical site at its url.

Licence position

unknown

Facts are not copyrightable; what this dataset takes from each source is a fact plus a short attributed quote linking back to the page that states it.

Sources

Fields

See any record in data/records.jsonl — field names are self-describing, and the canonical page for each record renders them with labels: https://referencesource.org/asbestos-notification-requirements-by-state/

Downloads last month
31