Dataset Viewer
Auto-converted to Parquet Duplicate
text
stringlengths
225
1.13k
label
stringclasses
2 values
Process: electricity, lignite IGCC plant 400MW, CCS, 400km & 2500m depleted gasfield | Scenario: 2025, very optimistic, Renew in Europe. Description: Included in NEEDS original file: 2025VO_Renew_electricity_lignite_IGCC_plant_400MW_CCS_400km_&_2500m_depleted_gasfield_RER_[kWh].xml. CO2 Emissions: 0.13 kg/kg. Energy Co...
low_impact
Process: electricity, hard coal power plant 500MW class post CCS, 200km & 800m aquifer | Scenario: 2025, very optimistic, 440ppm in Europe. Description: Dataset combines the 520 MW hard coal power plant with CO2 post-combustion capture & 200 km transport and storage in a 800 m deep saline aquifer, with an estimation of...
low_impact
Process: electricity, hard coal plant 500MW class post CCS, 400km & 2500m deplet gasfield | Scenario: 2050, realistic-optimistic, 440ppm in Europe. Description: Dataset combines the 510 MW hard coal power plant with CO2 post-combustion capture & 400 km transport (one intermediate recompression) and storage in a 2500 m ...
low_impact
Process: electricity, lignite plant 800 MW class post CCS, 200km & 2500m depl. gasfield | Scenario: 2050, very optimistic, Renew | U in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power pla...
low_impact
Process: electricity, production mix UCTE | Scenario: 2050, pessimistic, 440ppm in Union for the Co-ordination of Transmission of Electricity. Description: this dataset represent the situation in 2050 in the pessimistic scenario, an electricity mix according to the 440ppm-Strategy is assumed.(v1.1) Included in NEEDS or...
low_impact
Process: flat glass, uncoated, at plant | Scenario: 2050, pessimistic, BAU in Europe. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plant over the entire lifet...
low_impact
Process: electricity, nuclear, at EFR reactor | Scenario: 2050, pessimistic, BAU in Union for the Co-ordination of Transmission of Electricity. Description: Included in NEEDS original file: 2050PE_BAU_electricity_nuclear_at_EFR_reactor_UCTE_[kWh].xml. CO2 Emissions: 0.00 kg/kg. Energy Consumption: 0.00 kWh/kg. Water Us...
low_impact
Process: electricity, hard coal, at power plant 800 MW | Scenario: 2025, realistic-optimistic, 440ppm in Europe. Description: Dataset combines 800 MW hard coal power plant in Europe for realistic-optimistic technology-specific 2025 scenario., with average European future coal supply chain. Included in NEEDS original fi...
low_impact
Process: electricity, at MCFC CHP 250kW | Scenario: 2050, very optimistic, 440ppm in Germany. Description: Included in NEEDS original file: 2050VO_440ppm_electricity_at_MCFC_CHP_250kW_DE_[kWh].xml. CO2 Emissions: 0.40 kg/kg. Energy Consumption: 0.04 kWh/kg. Water Usage: 0.05 L/kg. Recycled Content Input: 0.00%. Acidifi...
low_impact
Process: electricity, nuclear, at power plant pressure water reactor (N4-type) | Scenario: 2025, very optimistic, Renew in Union for the Co-ordination of Transmission of Electricity. Description: Included in NEEDS original file: 2025VO_Renew_electricity_nuclear_at_power_plant_pressure_water_reactor_(N4-type)_UCTE_[kWh]...
low_impact
Process: ferronickel, 25% Ni, at plant | Scenario: 2025, very optimistic, 440ppm in Global. Description: This dataset represents the scenario 'Very Optimistic 2025' Included in NEEDS original file: 2025VO_440ppm_ferronickel_25%_Ni_at_plant_GLO_[kg].xml. CO2 Emissions: 7.93 kg/kg. Energy Consumption: 32.13 kWh/kg. Water...
high_impact
Process: electricity, pv, ground mounted power plant, sc-Si, 100, Southern Europe | Scenario: 2025, very optimistic, 440ppm in Europe. Description: Average electricity production during the life time of a ground mounted power plant. Parameters considered: Average annual solar radiation: 1800 kWh/m2 Life time: 35 years ...
low_impact
Process: electricity, hard coal IGCC plant 400MW, CCS, 400km & 2500m depleted gasfield | Scenario: 2025, very optimistic, 440ppm in Europe. Description: Included in NEEDS original file: 2025VO_440ppm_electricity_hard_coal_IGCC_plant_400MW_CCS_400km_&_2500m_depleted_gasfield_RER_[kWh].xml. CO2 Emissions: 0.12 kg/kg. Ene...
low_impact
Process: electricity, natural gas, CC plant, 500MWe post CCS, 400km&2500m deplet gasfield | Scenario: 2050, very optimistic, 440ppm in Europe. Description: Refers to a new combined cycle power plant of 500MWe class. Included in NEEDS original file: 2050VO_440ppm_electricity_natural_gas_CC_plant_500MWe_post_CCS_400km&25...
low_impact
Process: electricity, hard coal, at power plant 350 MW | Scenario: 2025, very optimistic, 440ppm in Europe. Description: Dataset combines 350 MW hard coal power plant in Europe for very-optimistic technology-specific 2025 scenario., with average European future coal supply chain. Included in NEEDS original file: 2025VO...
low_impact
Process: electricity, pv, tilted roof, CdTe, integrated, Southern Europe | Scenario: 2050, very optimistic, 440ppm in Europe. Description: Average electricity production during the life time of a tilted roof, integrated. Parameters considered: Average annual solar radiation: 900 kWh/m2 Life time: 40 years n pos: 97% n ...
low_impact
Process: electricity, at steam turbine (poplar), emission ctrl., Centr. EU, alloc. exergy | Scenario: Today in Europe. Description: Electricity production from generic steam turbine, generic emission control, allocation exergy Included in NEEDS original file: today_electricity_at_steam_turbine_(poplar)_emission_ctrl._C...
low_impact
Process: electricity, at SOFC, tubular CHP, hybrid, 1000kW | Scenario: 2050, realistic-optimistic, 440ppm in Germany. Description: Included in NEEDS original file: 2050RO_440ppm_electricity_at_SOFC_tubular_CHP_hybrid_1000kW_DE_[kWh].xml. CO2 Emissions: 0.02 kg/kg. Energy Consumption: 0.11 kWh/kg. Water Usage: 0.31 L/kg...
low_impact
Process: electricity, lignite plant 800 MW class oxyf CCS, 400km & 2500m depl. gasfield | Scenario: 2025, very optimistic, 440ppm | U in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power pl...
low_impact
Process: electricity, lignite power plant 800 MW class oxyf CCS, 400km & 800m aquifer | Scenario: 2025, very optimistic, 440ppm in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plant te...
low_impact
Process: electricity, from wave energy, 7MW | Scenario: 2050, very optimistic, 440ppm in Europe. Description: Included in NEEDS original file: 2050VO_440ppm_electricity_from_wave_energy_7MW_RER_[kWh].xml. CO2 Emissions: 0.01 kg/kg. Energy Consumption: 3.61 kWh/kg. Water Usage: 0.03 L/kg. Recycled Content Input: 0.00%. ...
low_impact
Process: electricity, hard coal power plant 500MW class post CCS, 200km & 800m aquifer | Scenario: 2025, realistic-optimistic, 440ppm in Europe. Description: Dataset combines the 510 MW hard coal power plant with CO2 post-combustion capture & 200 km transport and storage in a 800 m deep saline aquifer, with an estimati...
low_impact
Process: clinker, at plant | Scenario: 2050, realistic-optimistic, 440ppm in Switzerland. Description: This dataset represents the scenario 'Optimistic-Realistic 2050' Included in NEEDS original file: 2050RO_440ppm_clinker_at_plant_CH_[kg].xml. CO2 Emissions: 0.82 kg/kg. Energy Consumption: 0.24 kWh/kg. Water Usage: 1....
low_impact
Process: electricity, pv, tilted roof, CdTe, integrated, short, Southern Europe | Scenario: 2050, realistic-optimistic, 440ppm in Europe. Description: Average electricity production during the life time of a tilted roof, integrated. Parameters considered: Average annual solar radiation: 900 kWh/m2 Life time: 35 years n...
low_impact
Process: electricity, lignite power plant 800 MW class post CCS, 200km & 800m aquifer | Scenario: 2025, pessimistic, BAU in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plant technolog...
low_impact
Process: electricity, lignite power plant 800 MW class post CCS, 400km & 800m aquifer | Scenario: 2025, pessimistic, BAU | U in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plant techn...
low_impact
Process: pig iron, at plant | Scenario: Today in Global. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plant over the entire lifetime of 25 years amounts thus ...
low_impact
Process: electricity, hard coal power plant 500MW class post CCS, 400km & 800m aquifer | Scenario: 2025, very optimistic, 440ppm in Europe. Description: Dataset combines the 510 MW hard coal power plant with CO2 post-combustion capture & 400 km transport (one intermediate recompression) and storage in a 800 m deep sali...
low_impact
Process: electricity, lignite power plant 800 MW class post CCS, 200km & 800m aquifer | Scenario: 2050, very optimistic, 440ppm in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plant te...
low_impact
Process: electricity, hard coal plant 500MW class oxyf CCS, 200km & 2500m deplet gasfield | Scenario: 2025, pessimistic, 440ppm in Europe. Description: Dataset combines the 500 MW hard coal power plant with CO2 oxyfuel-combustion capture & 200 km transport and storage in a 2500 m deep depleted gas field, with an estima...
low_impact
Process: electricity, hard coal plant 500MW class post CCS, 200km & 2500m deplet gasfield | Scenario: 2025, pessimistic, 440ppm | U in Europe. Description: Dataset combines the 510 MW hard coal power plant with CO2 post-combustion capture & 200 km transport and storage in a 2500 m deep depleted gas field, with an estim...
low_impact
Process: electricity, hard coal, at power plant 600 MW | Scenario: 2050, very optimistic, Renew | U in Europe. Description: Dataset combines 600 MW hard coal power plant in Europe for Very-optimistic technology-specific 2050 scenario, with average European future coal supply chain. Included in NEEDS original file: 2050...
low_impact
Process: electricity, at MCFC CHP 250kW, from wood gas | Scenario: 2025, pessimistic, BAU in Germany. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plant over ...
low_impact
Process: electricity, hard coal plant 500MW class post CCS, 400km & 2500m deplet gasfield | Scenario: 2025, realistic-optimistic, 440ppm in Europe. Description: Dataset combines the 510 MW hard coal power plant with CO2 post-combustion capture & 400 km transport (one intermediate recompression) and storage in a 2500 m ...
low_impact
Process: pig iron, at plant | Scenario: 2025, pessimistic, 440ppm in Global. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plant over the entire lifetime of 25...
low_impact
Process: electricity, lignite plant 800 MW class post CCS, 400km & 2500m depl. gasfield | Scenario: 2050, pessimistic, 440ppm in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plant tech...
low_impact
Process: electricity, photovoltaic, vertical facade, mc-Si, integrated, Southern Europe | Scenario: Today in Europe. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of ...
low_impact
Process: electricity, natural gas, CC plant, 500MWe post CCS, 400km&2500m deplet gasfield | Scenario: 2050, realistic-optimistic, 440ppm in Europe. Description: Refers to a new combined cycle power plant of 500MWe class. Included in NEEDS original file: 2050RO_440ppm_electricity_natural_gas_CC_plant_500MWe_post_CCS_400...
low_impact
Process: electricity, at offshore wind park 160MW | Scenario: Today in Denmark. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plant over the entire lifetime of...
low_impact
Process: electricity, hard coal IGCC power plant 400MW, CCS, 200km & 800m aquifer | Scenario: 2025, realistic-optimistic, 440ppm in Europe. Description: Included in NEEDS original file: 2025RO_440ppm_electricity_hard_coal_IGCC_power_plant_400MW_CCS_200km_&_800m_aquifer_RER_[kWh].xml. CO2 Emissions: 0.11 kg/kg. Energy C...
low_impact
Process: electricity, lignite power plant 800 MW class post CCS, 200km & 800m aquifer | Scenario: 2025, pessimistic, BAU | U in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plant techn...
low_impact
Process: electricity, lignite plant 800 MW class oxyf CCS, 200km & 2500m depl. gasfield | Scenario: 2025, very optimistic, 440ppm | U in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power pl...
low_impact
Process: electricity, hard coal, at power plant 600 MW | Scenario: 2025, very optimistic, Renew in Europe. Description: Dataset combines 600 MW hard coal power plant in Europe for realistic-optimistic technology-specific 2025 scenario, with average European future coal supply chain. Included in NEEDS original file: 202...
low_impact
Process: electricity, hard coal power plant 500MW class post CCS, 200km & 800m aquifer | Scenario: 2050, pessimistic, 440ppm in Europe. Description: Dataset combines the 540 MW hard coal power plant with CO2 post-combustion capture & 200 km transport and storage in a 800 m deep saline aquifer, with an estimation of the...
low_impact
Process: electricity, photovoltaic, tilted roof, mc-Si, retrofit, Central Europe | Scenario: Today in Europe. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the pla...
low_impact
Process: electricity, lignite power plant 800 MW class post CCS, 400km & 800m aquifer | Scenario: 2050, realistic-optimistic, 440ppm | U in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power...
low_impact
Process: operation, lorry 16t | Scenario: 2025, pessimistic, BAU in Europe. Description: Average data for the operation of 50% loaded heavy duty vehicles (3.5-16t) in Europe (EU 15). These data are derived from year 2000 data and refer to a pessimistic scenario. Included in NEEDS original file: 2025PE_BAU_operation_lor...
low_impact
Process: electricity, hard coal, at power plant 600 MW | Scenario: 2025, very optimistic, 440ppm in Europe. Description: Dataset combines 600 MW hard coal power plant in Europe for realistic-optimistic technology-specific 2025 scenario, with average European future coal supply chain. Included in NEEDS original file: 20...
low_impact
Process: electricity, nuclear, at EFR reactor | Scenario: 2025, pessimistic, BAU in Union for the Co-ordination of Transmission of Electricity. Description: Included in NEEDS original file: 2025PE_BAU_electricity_nuclear_at_EFR_reactor_UCTE_[kWh].xml. CO2 Emissions: 0.00 kg/kg. Energy Consumption: 0.00 kWh/kg. Water Us...
low_impact
Process: electricity, hard coal plant 500MW class oxyf CCS, 400km & 2500m deplet gasfield | Scenario: 2050, very optimistic, 440ppm in Europe. Description: Dataset combines the 500 MW hard coal power plant with CO2 oxyfuel-combustion capture & 400 km transport (one intermediate recompression) and storage in a 2500 m de...
low_impact
Process: electricity, hard coal power plant 500MW class oxyf CCS, 400km & 800m aquifer | Scenario: 2025, very optimistic, Renew | U in Europe. Description: Dataset combines the 510 MW hard coal power plant with CO2 oxyfuel-combustion capture & 400 km transport (one intermediate recompression) and storage in a 800 m dee...
low_impact
Process: electricity, hard coal power plant 500MW class oxyf CCS, 400km & 800m aquifer | Scenario: 2050, realistic-optimistic, 440ppm in Europe. Description: Dataset combines the 500 MW hard coal power plant with CO2 oxyfuel-combustion capture & 400 km transport (one intermediate recompression) and storage in a 800 m d...
low_impact
Process: electricity, hard coal IGCC power plant 400MW, CCS, 200km & 800m aquifer | Scenario: 2050, very optimistic, Renew in Europe. Description: Included in NEEDS original file: 2050VO_Renew_electricity_hard_coal_IGCC_power_plant_400MW_CCS_200km_&_800m_aquifer_RER_[kWh].xml. CO2 Emissions: 0.10 kg/kg. Energy Consumpt...
low_impact
Process: electricity, at steam turbine (poplar), emission ctrl., Centr. EU, alloc. exergy | Scenario: 2050, pessimistic, BAU in Europe. Description: Electricity production from generic steam turbine, generic emission control, allocation exergy control, allocation exergy 2050 pessimistic scenario Included in NEEDS origi...
low_impact
Process: electricity, lignite power plant 800 MW class oxyf CCS, 200km & 800m aquifer | Scenario: 2025, pessimistic, BAU in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plant technolog...
low_impact
Process: electricity, pv, tilted roof, c-Si, integrated, very thick, Central EU | Scenario: 2050, pessimistic, 440ppm in Europe. Description: Average electricity production during the life time of a tilted roof, integrated. Parameters considered: Average annual solar radiation: 900 kWh/m2 Life time: 35 years n pos: 97%...
low_impact
Process: electricity, hard coal, at power plant 800 MW | Scenario: 2050, very optimistic, Renew in Europe. Description: Dataset combines 800 MW hard coal power plant in Europe for very-optimistic technology-specific 2050 scenario., with average European future coal supply chain. Included in NEEDS original file: 2050VO_...
low_impact
Process: sinter, iron, at plant | Scenario: 2025, pessimistic, BAU in Global. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plant over the entire lifetime of 2...
low_impact
Process: aluminium, primary, liquid, at plant | Scenario: 2025, pessimistic, 440ppm in Europe. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plant over the ent...
high_impact
Process: electricity, pv, tilted roof, CdTe, integrated, low eff. Southern Europe | Scenario: 2025, pessimistic, 440ppm in Europe. Description: Average electricity production during the life time of a tilted roof, integrated. Parameters considered: Average annual solar radiation: 900 kWh/m2 Life time: 25 years n pos: 9...
low_impact
Process: electricity, pv, tilted roof, c-Si, integrated, thick, Southern Europe | Scenario: 2050, very optimistic, Renew in Europe. Description: Average electricity production during the life time of a tilted roof, integrated. Parameters considered: Average annual solar radiation: 1800 kWh/m2 Life time: 50 years n pos:...
low_impact
Process: electricity, hard coal, at power plant 600 MW | Scenario: 2050, pessimistic, 440ppm | U in Europe. Description: Dataset combines 600 MW hard coal power plant in Europe for pessimistic technology-specific 2050 scenario, with average European future coal supply chain. Included in NEEDS original file: 2050PE_440p...
low_impact
Process: electricity, lignite power plant 800 MW class oxyf CCS, 200km & 800m aquifer | Scenario: 2050, pessimistic, 440ppm in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plant techno...
low_impact
Process: electricity, pv, tilted roof, c-Si, integrated, thick, Southern Europe | Scenario: 2025, realistic-optimistic, 440ppm in Europe. Description: Average electricity production during the life time of a tilted roof, integrated. Parameters considered: Average annual solar radiation: 1800 kWh/m2 Life time: 35 years ...
low_impact
Process: electricity, hard coal plant 500MW class post CCS, 200km & 2500m deplet gasfield | Scenario: 2050, pessimistic, 440ppm | U in Europe. Description: Dataset combines the 540 MW hard coal power plant with CO2 post-combustion capture & 200 km transport and storage in a 2500 m deep depleted gas field, with an estim...
low_impact
Process: electricity, at steam turbine (poplar), emiss. ctrl., South EU, alloc. exergy | Scenario: Today in Europe. Description: Electricity production from generic steam turbine, generic emission control, allocation exergy Included in NEEDS original file: today_electricity_at_steam_turbine_(poplar)_emiss._ctrl._South_...
low_impact
Process: MG-silicon, at plant | Scenario: 2050, very optimistic, 440ppm in Norway. Description: This dataset represents the scenario 'Very Optimistic 2050' Included in NEEDS original file: 2050VO_440ppm_MG-silicon_at_plant_NO_[kg].xml. CO2 Emissions: 7.52 kg/kg. Energy Consumption: 102.85 kWh/kg. Water Usage: 10.86 L/k...
high_impact
Process: copper, primary, at refinery | Scenario: Today in Latin America and the Caribbean. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plant over the entire...
high_impact
Process: electricity, nuclear, at power plant boiling water reactor | Scenario: Today in Union for the Co-ordination of Transmission of Electricity. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste ...
low_impact
Process: copper, primary, at refinery | Scenario: 2025, pessimistic, BAU in Latin America and the Caribbean. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plan...
high_impact
Process: electricity, solar trough, salt storage, at power plant, 180MW | Scenario: 2025, pessimistic, 440ppm in Morocco. Description: Included in NEEDS original file: 2025PE_440ppm_electricity_solar_trough_salt_storage_at_power_plant_180MW_MA_[kWh].xml. CO2 Emissions: 0.01 kg/kg. Energy Consumption: 2.24 kWh/kg. Water...
low_impact
Process: electricity, lignite power plant 800 MW class post CCS, 400km & 800m aquifer | Scenario: 2050, pessimistic, BAU in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plant technolog...
low_impact
Process: electricity, hard coal power plant 500MW class oxyf CCS, 200km & 800m aquifer | Scenario: 2050, very optimistic, Renew in Europe. Description: Dataset combines the 530 MW hard coal power plant with CO2 oxyfuel-combustion capture & 200 km transport and storage in a 800 m deep saline aquifer, with an estimation ...
low_impact
Process: electricity, pv, tilted roof, c-Si, integrated, very thick, Southern EU | Scenario: 2025, pessimistic, 440ppm in Europe. Description: Average from 3 specific processes of which one in pilot phase. Energy consumption has been estimated as 20% reduction with respect to 2004. Material consumption has been calcula...
low_impact
Process: electricity, hard coal plant 500MW class oxyf CCS, 400km & 2500m deplet gasfield | Scenario: 2050, very optimistic, 440ppm | U in Europe. Description: Dataset combines the 530 MW hard coal power plant with CO2 oxyfuel-combustion capture & 400 km transport (one intermediate recompression) and storage in a 2500 ...
low_impact
Process: electricity, hard coal power plant 500MW class oxyf CCS, 200km & 800m aquifer | Scenario: 2050, pessimistic, 440ppm in Europe. Description: Dataset combines the 520 MW hard coal power plant with CO2 oxyfuel-combustion capture & 200 km transport and storage in a 800 m deep saline aquifer, with an estimation of ...
low_impact
Process: electricity, lignite plant 800 MW class oxyf CCS, 200km & 2500m depl. gasfield | Scenario: 2025, very optimistic, 440ppm in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plant ...
low_impact
Process: electricity, hard coal plant 500MW class oxyf CCS, 200km & 2500m deplet gasfield | Scenario: 2025, pessimistic, 440ppm | U in Europe. Description: Dataset combines the 500 MW hard coal power plant with CO2 oxyfuel-combustion capture & 200 km transport and storage in a 2500 m deep depleted gas field, with an es...
low_impact
Process: operation, van < 3,5t | Scenario: 2050, realistic-optimistic, 440ppm in Europe. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plant over the entire li...
low_impact
Process: electricity, hard coal, at power plant 350 MW | Scenario: 2025, pessimistic, BAU in Europe. Description: Dataset combines 350 MW hard coal power plant in Europe for pessimistic technology-specific 2025 scenario, with average European future coal supply chain. Included in NEEDS original file: 2025PE_BAU_electri...
low_impact
Process: electricity, pv, ground mounted power plant, sc-Si, 100, Central Europe | Scenario: 2025, very optimistic, 440ppm in Europe. Description: Average electricity production during the life time of a ground mounted power plant. Parameters considered: Average annual solar radiation: 900 kWh/m2 Life time: 35 years n ...
low_impact
Process: electricity, at SOFC, tubular CHP, hybrid, 300kW | Scenario: 2050, realistic-optimistic, 440ppm in Germany. Description: Included in NEEDS original file: 2050RO_440ppm_electricity_at_SOFC_tubular_CHP_hybrid_300kW_DE_[kWh].xml. CO2 Emissions: 0.38 kg/kg. Energy Consumption: 0.02 kWh/kg. Water Usage: 0.15 L/kg. ...
low_impact
Process: clinker, at plant | Scenario: Today in Switzerland. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plant over the entire lifetime of 25 years amounts t...
low_impact
Process: electricity, lignite power plant 800 MW class oxyf CCS, 400km & 800m aquifer | Scenario: 2050, very optimistic, 440ppm | U in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plan...
low_impact
Process: electricity, lignite IGCC power plant 400MW, CCS, 200km & 800m aquifer | Scenario: 2025, pessimistic, 440ppm in Europe. Description: Included in NEEDS original file: 2025PE_440ppm_electricity_lignite_IGCC_power_plant_400MW_CCS_200km_&_800m_aquifer_RER_[kWh].xml. CO2 Emissions: 0.12 kg/kg. Energy Consumption: 0...
low_impact
Process: electricity, at MCFC CHP 250kW | Scenario: 2025, pessimistic, 440ppm in Germany. Description: Included in NEEDS original file: 2025PE_440ppm_electricity_at_MCFC_CHP_250kW_DE_[kWh].xml. CO2 Emissions: 0.42 kg/kg. Energy Consumption: 0.03 kWh/kg. Water Usage: 0.06 L/kg. Recycled Content Input: 0.00%. Acidificati...
low_impact
Process: electricity, hard coal power plant 500MW class post CCS, 400km & 800m aquifer | Scenario: 2050, pessimistic, BAU | U in Europe. Description: Dataset combines the 540 MW hard coal power plant with CO2 post-combustion capture & 400 km transport (one intermediate recompression) and storage in a 800 m deep saline ...
low_impact
Process: electricity, hard coal IGCC plant 400MW, CCS, 200km & 2500m depleted gasfield | Scenario: 2050, very optimistic, Renew in Europe. Description: Included in NEEDS original file: 2050VO_Renew_electricity_hard_coal_IGCC_plant_400MW_CCS_200km_&_2500m_depleted_gasfield_RER_[kWh].xml. CO2 Emissions: 0.10 kg/kg. Energ...
low_impact
Process: electricity mix, aluminium industry | Scenario: 2050, pessimistic, 440ppm in Global. Description: The inventory refers to a compost plant over the lifetime of 25 years. The compost plant is constructed for a treating capactiy of 10‘000 tons biogenic waste per year. The total turnover of the plant over the enti...
low_impact
Process: electricity, hard coal, at power plant 600 MW | Scenario: 2050, very optimistic, Renew in Europe. Description: Dataset combines 600 MW hard coal power plant in Europe for realistic-optimistic technology-specific 2025 scenario, with average European future coal supply chain. Included in NEEDS original file: 205...
low_impact
Process: operation, lorry 32t | Scenario: 2050, pessimistic, BAU in Europe. Description: Average data for the operation of 50% loaded heavy duty vehicles (>16t) in Europe (EU 15). These data are derived from year 2000 data and refer to a pessimistic scenario. Included in NEEDS original file: 2050PE_BAU_operation_lorry_...
low_impact
Process: electricity, hard coal power plant 500MW class oxyf CCS, 400km & 800m aquifer | Scenario: 2025, very optimistic, Renew in Europe. Description: Dataset combines the 500 MW hard coal power plant with CO2 oxyfuel-combustion capture & 400 km transport (one intermediate recompression) and storage in a 800 m deep sa...
low_impact
Process: electricity, Fresnel CHP for desalination, at power plant, with PCM-stor., 200MW | Scenario: 2025, very optimistic, 440ppm in Morocco. Description: Included in NEEDS original file: 2025VO_440ppm_electricity_Fresnel_CHP_for_desalination_at_power_plant_with_PCM-stor._200MW_MA_[kWh].xml. CO2 Emissions: 0.01 kg/kg...
low_impact
Process: electricity, at MCFC CHP 250kW | Scenario: 2050, pessimistic, 440ppm in Germany. Description: Included in NEEDS original file: 2050PE_440ppm_electricity_at_MCFC_CHP_250kW_DE_[kWh].xml. CO2 Emissions: 0.41 kg/kg. Energy Consumption: 0.03 kWh/kg. Water Usage: 0.06 L/kg. Recycled Content Input: 0.00%. Acidificati...
low_impact
Process: electricity, hard coal IGCC power plant 400MW, CCS, 200km & 800m aquifer | Scenario: 2050, very optimistic, 440ppm in Europe. Description: Included in NEEDS original file: 2050VO_440ppm_electricity_hard_coal_IGCC_power_plant_400MW_CCS_200km_&_800m_aquifer_RER_[kWh].xml. CO2 Emissions: 0.10 kg/kg. Energy Consum...
low_impact
Process: electricity, lignite plant 800 MW class oxyf CCS, 200km & 2500m depl. gasfield | Scenario: 2050, very optimistic, 440ppm in Europe. Description: Conversion of lignite to electricity at power plant; LHV of lignite is taken from ecoinvent (8.8 MJ/kg); efficiency assumed as representative for lignite power plant ...
low_impact
Process: electricity, pv, ground mounted power plant, c-Si, thick, Southern Europe | Scenario: 2025, very optimistic, 440ppm in Europe. Description: Average electricity production during the life time of a ground mounted power plant. Parameters considered: Average annual solar radiation: 1800 kWh/m2 Life time: 35 years...
low_impact
Process: electricity, lignite, at IGCC power plant 450MW | Scenario: 2050, very optimistic, 440ppm in Europe. Description: Included in NEEDS original file: 2050VO_440ppm_electricity_lignite_at_IGCC_power_plant_450MW_RER_[kWh].xml. CO2 Emissions: 0.61 kg/kg. Energy Consumption: 0.02 kWh/kg. Water Usage: 0.04 L/kg. Recyc...
low_impact
Process: electricity, hard coal plant 500MW class oxyf CCS, 200km & 2500m deplet gasfield | Scenario: 2025, pessimistic, BAU in Europe. Description: Dataset combines the 500 MW hard coal power plant with CO2 oxyfuel-combustion capture & 200 km transport and storage in a 2500 m deep depleted gas field, with an estimatio...
low_impact
Process: electricity, hard coal power plant 500MW class post CCS, 400km & 800m aquifer | Scenario: 2025, very optimistic, 440ppm | U in Europe. Description: Dataset combines the 520 MW hard coal power plant with CO2 post-combustion capture & 400 km transport (one intermediate recompression) and storage in a 800 m deep ...
low_impact
End of preview. Expand in Data Studio

No dataset card yet

Downloads last month
1