Dataset Viewer
Auto-converted to Parquet Duplicate
id
stringlengths
21
21
kind
stringclasses
3 values
options
listlengths
2
6
target
listlengths
2
6
state
stringlengths
160
247
question
stringclasses
21 values
domain
stringclasses
3 values
family
stringclasses
1 value
source
stringclasses
1 value
v3_98edf02e928314ee_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.39, 0.1, 0.15, 0.17, 0.16, 0.03 ]
A cache node creates a single point of failure; additionally satisfies the 1.5m clearance code. Context: under the current lease terms, mid-incident. Reported by the supervisor.
Rate capacity gain for this scenario on a 0-5 scale.
resource_placement
spatial
yuri_v3
v3_987a28539fbdc505_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.29, 0.05, 0.1, 0.13, 0.3, 0.13 ]
A cache node is within the redundancy requirement; additionally blocks the fire egress path. Context: in the seismic zone, during the morning shift. Reported by the automated check.
Rate capacity gain for this scenario on a 0-5 scale.
resource_placement
spatial
yuri_v3
v3_2828ed90e892a0da_n
noul
[ "false", "true" ]
[ 0.96, 0.04 ]
The overflow stock blocks the fire egress path; additionally would sit 2m from the water main. Context: in the seismic zone, during the holiday freeze. Reported by the operator.
Is this scenario one where: the placement meets code?
resource_placement
spatial
yuri_v3
v3_e1055583a30431cd_c
choice
[ "capacity", "redundancy", "accessibility", "safety" ]
[ 0.01, 0.03, 0.33, 0.63 ]
A cache node satisfies the 1.5m clearance code; additionally would sit 2m from the water main. Context: under the current lease terms, mid-incident. Reported by the review queue.
Priority zone for this scenario.
resource_placement
spatial
yuri_v3
v3_4c46a8963a661526_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0, 0.05, 0.41, 0.51, 0.03 ]
The approval chain has a 10-business-day regulatory clock; additionally has sequential steps summing past the deadline. Context: under the contract terms, during normal operations. Reported by the operator.
Rate deadline pressure for this scenario on a 0-5 scale.
temporal_reasoning
spatial
yuri_v3
v3_92b3411f28b6ac55_c
choice
[ "highway_bypass", "urban_direct", "toll_road", "wait_for_clearance" ]
[ 0.58, 0, 0.12, 0.3 ]
The delivery route shows a 40-minute delay from construction; additionally requires an unpaved segment for 8km. Context: with a 3,500kg vehicle, during the holiday freeze. Reported by the monitoring system.
Route choice for this scenario.
navigation_routing
spatial
yuri_v3
v3_248412cf8400ff77_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0, 0.01, 0.22, 0.73, 0.04 ]
The approval chain has a 10-business-day regulatory clock; additionally has sequential steps summing past the deadline. Context: before quarter close, during the morning shift. Reported by the operator.
Rate schedule risk for this scenario on a 0-5 scale.
temporal_reasoning
spatial
yuri_v3
v3_bb9bee26ec138a79_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.03, 0.05, 0.12, 0.41, 0.37, 0.02 ]
The overflow stock shares a circuit already at 82% load; additionally doubles capacity in the constrained zone. Context: under the current lease terms, while legacy systems are still active. Reported by the monitoring system.
Rate code-compliance risk for this scenario on a 0-5 scale.
resource_placement
spatial
yuri_v3
v3_0a7b3b0a36256151_c
choice
[ "fastest", "shortest", "safest", "cheapest" ]
[ 0, 0.01, 0.99, 0 ]
The warehouse robot requires an unpaved segment for 8km; additionally passes an active school zone at dismissal. Context: with a 3,500kg vehicle, during the quarterly review. Reported by the on-call engineer.
Mode for this scenario.
navigation_routing
spatial
yuri_v3
v3_20e4b1d6283ffa7c_n
noul
[ "false", "true" ]
[ 0.12, 0.88 ]
The project milestone expires 30 days before the audit; additionally has sequential steps summing past the deadline. Context: per the standard SLA, following a recent audit. Reported by the automated check.
Is this scenario one where: a buffer is required?
temporal_reasoning
spatial
yuri_v3
v3_9479a267d4725810_n
noul
[ "false", "true" ]
[ 0.69, 0.31 ]
The warehouse robot shows a 40-minute delay from construction; additionally is closed for a parade until 14:00. Context: with a 3,500kg vehicle, while legacy systems are still active. Reported by the monitoring system.
Is this scenario one where: the vehicle can clear this route?
navigation_routing
spatial
yuri_v3
v3_649731aa5e275587_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.02, 0.08, 0.18, 0.6, 0.11, 0.01 ]
An evacuation path has charging available at the midpoint; additionally is the shortest path by 6 minutes. Context: in low-visibility conditions, with a new vendor onboarded. Reported by the supervisor.
Rate arrival risk for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_3cbb8b397bbd1031_n
noul
[ "false", "true" ]
[ 0.47, 0.53 ]
The certification window has a 10-business-day regulatory clock; additionally has a built-in 3-day buffer. Context: before quarter close, during an external partner integration. Reported by the automated check.
Is this scenario one where: the sequence is valid?
temporal_reasoning
spatial
yuri_v3
v3_3635ca2137a94ee4_c
choice
[ "fastest", "shortest", "safest", "cheapest" ]
[ 0.73, 0.01, 0.26, 0 ]
An evacuation path has charging available at the midpoint; additionally has a bridge with a 4.2m height limit. Context: under a 90-minute deadline, during the morning shift. Reported by the review queue.
Mode for this scenario.
navigation_routing
spatial
yuri_v3
v3_0598e094a19408d2_n
noul
[ "false", "true" ]
[ 0.44, 0.56 ]
The certification window was completed 2 days early; additionally needs a document that takes 15 days to obtain. Context: per the standard SLA, during peak load. Reported by the operator.
Is this scenario one where: the deadline is achievable?
temporal_reasoning
spatial
yuri_v3
v3_a69faa108dc8a92c_n
noul
[ "false", "true" ]
[ 0.84, 0.16 ]
The project milestone can start only after the freeze lifts; additionally has sequential steps summing past the deadline. Context: per the standard SLA, during the holiday freeze. Reported by the supervisor.
Is this scenario one where: the sequence is valid?
temporal_reasoning
spatial
yuri_v3
v3_76befff8dbffd62f_n
noul
[ "false", "true" ]
[ 0.51, 0.49 ]
The certification window expires 30 days before the audit; additionally needs a document that takes 15 days to obtain. Context: under the contract terms, with a new vendor onboarded. Reported by the review queue.
Is this scenario one where: the sequence is valid?
temporal_reasoning
spatial
yuri_v3
v3_ef90dad34636b5d7_n
noul
[ "false", "true" ]
[ 0.93, 0.07 ]
The delivery route includes a toll segment costing $14; additionally requires an unpaved segment for 8km. Context: with hazardous cargo, under an active deadline. Reported by the operator.
Is this scenario one where: a closure blocks the path?
navigation_routing
spatial
yuri_v3
v3_c7aba54c216efe0a_n
noul
[ "false", "true" ]
[ 0.58, 0.42 ]
An evacuation path crosses a flood-warning zone; additionally shows a 40-minute delay from construction. Context: under a 90-minute deadline, during normal operations. Reported by the operator.
Is this scenario one where: the vehicle can clear this route?
navigation_routing
spatial
yuri_v3
v3_56f36fc39be968c7_n
noul
[ "false", "true" ]
[ 0.27, 0.73 ]
The new shelving unit is within the redundancy requirement; additionally doubles capacity in the constrained zone. Context: in facility A, at the end of the fiscal period. Reported by the monitoring system.
Is this scenario one where: the load rating is sufficient?
resource_placement
spatial
yuri_v3
v3_59c4d783ebb9d50e_n
noul
[ "false", "true" ]
[ 0.06, 0.94 ]
The overflow stock is within the redundancy requirement; additionally satisfies the 1.5m clearance code. Context: under the current lease terms, as part of a compliance sweep. Reported by the monitoring system.
Is this scenario one where: the placement meets code?
resource_placement
spatial
yuri_v3
v3_4abcdbdd5c2a09ad_c
choice
[ "start_now", "expedite", "renegotiate_date", "escalate_blocker" ]
[ 0.41, 0.54, 0.02, 0.03 ]
The renewal deadline was completed 2 days early; additionally needs a document that takes 15 days to obtain. Context: with expedite fees available, at the end of the fiscal period. Reported by the monitoring system.
Timing decision for this scenario.
temporal_reasoning
spatial
yuri_v3
v3_80cb3d7f5cda1fd1_n
noul
[ "false", "true" ]
[ 0.43, 0.57 ]
The renewal deadline depends on a vendor response with a 5-day SLA; additionally expires 30 days before the audit. Context: with expedite fees available, during the quarterly review. Reported by the monitoring system.
Is this scenario one where: the deadline is achievable?
temporal_reasoning
spatial
yuri_v3
v3_9bc2854dea57c2e8_n
noul
[ "false", "true" ]
[ 0.12, 0.88 ]
An evacuation path has a bridge with a 4.2m height limit; additionally is closed for a parade until 14:00. Context: in low-visibility conditions, during the quarterly review. Reported by the review queue.
Is this scenario one where: a closure blocks the path?
navigation_routing
spatial
yuri_v3
v3_38652800a387ed46_n
noul
[ "false", "true" ]
[ 0.83, 0.17 ]
The certification window expires 30 days before the audit; additionally has sequential steps summing past the deadline. Context: with expedite fees available, at the end of the fiscal period. Reported by the monitoring system.
Is this scenario one where: the sequence is valid?
temporal_reasoning
spatial
yuri_v3
v3_20162ecf6e65dd7f_n
noul
[ "false", "true" ]
[ 0.67, 0.33 ]
The renewal deadline requires signoffs from 4 people with 2 on leave; additionally depends on a vendor response with a 5-day SLA. Context: before quarter close, while legacy systems are still active. Reported by the supervisor.
Is this scenario one where: the deadline is achievable?
temporal_reasoning
spatial
yuri_v3
v3_2884f9970cbd5e32_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.06, 0.25, 0.25, 0.39, 0.05, 0 ]
The renewal deadline can start only after the freeze lifts; additionally was completed 2 days early. Context: with expedite fees available, with a new vendor onboarded. Reported by the monitoring system.
Rate schedule risk for this scenario on a 0-5 scale.
temporal_reasoning
spatial
yuri_v3
v3_3d4b69457c76b631_c
choice
[ "capacity", "redundancy", "accessibility", "safety" ]
[ 0.02, 0.89, 0, 0.09 ]
The backup generator creates a single point of failure; additionally would sit 2m from the water main. Context: in facility A, during peak load. Reported by the automated check.
Priority zone for this scenario.
resource_placement
spatial
yuri_v3
v3_b4d665549fb7909b_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0, 0.01, 0.69, 0.3, 0 ]
The certification window depends on a vendor response with a 5-day SLA; additionally needs a document that takes 15 days to obtain. Context: with expedite fees available, with staffing at reduced levels. Reported by the monitoring system.
Rate schedule risk for this scenario on a 0-5 scale.
temporal_reasoning
spatial
yuri_v3
v3_1b04bb693752d8a4_n
noul
[ "false", "true" ]
[ 0.14, 0.86 ]
The project milestone has a 10-business-day regulatory clock; additionally lands on a public holiday. Context: under the contract terms, with a new vendor onboarded. Reported by the monitoring system.
Is this scenario one where: a buffer is required?
temporal_reasoning
spatial
yuri_v3
v3_40c51f90a2b99235_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0, 0, 0.03, 0.76, 0.21 ]
An autonomous vehicle passes an active school zone at dismissal; additionally requires an unpaved segment for 8km. Context: in low-visibility conditions, during an external partner integration. Reported by the operator.
Rate arrival risk for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_048bb74093f09cd1_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.01, 0.05, 0.24, 0.63, 0.07, 0 ]
An autonomous vehicle has charging available at the midpoint; additionally is closed for a parade until 14:00. Context: in low-visibility conditions, during normal operations. Reported by the supervisor.
Rate arrival risk for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_4bf885aa107d2ed1_c
choice
[ "capacity", "redundancy", "accessibility", "safety" ]
[ 0.17, 0, 0.01, 0.82 ]
The overflow stock satisfies the 1.5m clearance code; additionally requires a permit for the added height. Context: in facility A, during peak load. Reported by the supervisor.
Priority zone for this scenario.
resource_placement
spatial
yuri_v3
v3_7fbfc1ea3e6e53fc_c
choice
[ "approved", "approved_with_conditions", "relocate", "reject" ]
[ 0.02, 0.48, 0.26, 0.24 ]
A cache node shares a circuit already at 82% load; additionally fits the rated floor load of 400kg/m2. Context: on the mezzanine level, as part of a compliance sweep. Reported by the operator.
Placement for this scenario.
resource_placement
spatial
yuri_v3
v3_bbcd245f31809691_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.08, 0.16, 0.22, 0.36, 0.16, 0.02 ]
An autonomous vehicle has a bridge with a 4.2m height limit; additionally has charging available at the midpoint. Context: under a 90-minute deadline, immediately after go-live. Reported by the monitoring system.
Rate arrival risk for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_9d21193986e843ef_n
noul
[ "false", "true" ]
[ 0.57, 0.43 ]
An evacuation path has a weight-restricted road; additionally has charging available at the midpoint. Context: in low-visibility conditions, during the holiday freeze. Reported by the operator.
Is this scenario one where: the ETA is achievable?
navigation_routing
spatial
yuri_v3
v3_a510a1d495d186ad_n
noul
[ "false", "true" ]
[ 0.65, 0.35 ]
The backup generator doubles capacity in the constrained zone; additionally would sit 2m from the water main. Context: on the mezzanine level, during the morning shift. Reported by the on-call engineer.
Is this scenario one where: the placement meets code?
resource_placement
spatial
yuri_v3
v3_f89f4135dfe3aaa8_n
noul
[ "false", "true" ]
[ 0.9, 0.1 ]
The approval chain lands on a public holiday; additionally has sequential steps summing past the deadline. Context: before quarter close, during normal operations. Reported by the operator.
Is this scenario one where: the deadline is achievable?
temporal_reasoning
spatial
yuri_v3
v3_3015afc6d6e1923d_c
choice
[ "fastest", "shortest", "safest", "cheapest" ]
[ 0.64, 0.05, 0.31, 0 ]
The warehouse robot has charging available at the midpoint; additionally is closed for a parade until 14:00. Context: under a 90-minute deadline, while legacy systems are still active. Reported by the automated check.
Mode for this scenario.
navigation_routing
spatial
yuri_v3
v3_ef55fd9ec1e6844b_n
noul
[ "false", "true" ]
[ 0.66, 0.34 ]
The new shelving unit requires a permit for the added height; additionally doubles capacity in the constrained zone. Context: in the seismic zone, during peak load. Reported by the supervisor.
Is this scenario one where: the placement meets code?
resource_placement
spatial
yuri_v3
v3_90849ff0ef46f173_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.52, 0.33, 0.1, 0.05, 0, 0 ]
A cache node is within the redundancy requirement; additionally satisfies the 1.5m clearance code. Context: under the current lease terms, as part of a compliance sweep. Reported by the supervisor.
Rate code-compliance risk for this scenario on a 0-5 scale.
resource_placement
spatial
yuri_v3
v3_589d30fb8221627a_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0.01, 0.04, 0.35, 0.57, 0.03 ]
The renewal deadline has sequential steps summing past the deadline; additionally can start only after the freeze lifts. Context: under the contract terms, during the holiday freeze. Reported by the on-call engineer.
Rate schedule risk for this scenario on a 0-5 scale.
temporal_reasoning
spatial
yuri_v3
v3_fea7877faf35b6ac_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.01, 0.01, 0.07, 0.68, 0.22, 0.01 ]
An autonomous vehicle has a bridge with a 4.2m height limit; additionally is closed for a parade until 14:00. Context: under a 90-minute deadline, during the quarterly review. Reported by the supervisor.
Rate route difficulty for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_38d03dfb65bce591_n
noul
[ "false", "true" ]
[ 0.08, 0.92 ]
The certification window has a built-in 3-day buffer; additionally requires signoffs from 4 people with 2 on leave. Context: under the contract terms, during the quarterly review. Reported by the operator.
Is this scenario one where: a buffer is required?
temporal_reasoning
spatial
yuri_v3
v3_b3b0263b9db77c25_c
choice
[ "capacity", "redundancy", "accessibility", "safety" ]
[ 0, 0.96, 0, 0.04 ]
The backup generator satisfies the 1.5m clearance code; additionally creates a single point of failure. Context: on the mezzanine level, mid-incident. Reported by the on-call engineer.
Priority zone for this scenario.
resource_placement
spatial
yuri_v3
v3_b062404ce69e2e77_c
choice
[ "capacity", "redundancy", "accessibility", "safety" ]
[ 0.02, 0.66, 0, 0.32 ]
The backup generator needs climate control the room lacks; additionally is within the redundancy requirement. Context: under the current lease terms, during the holiday freeze. Reported by the supervisor.
Priority zone for this scenario.
resource_placement
spatial
yuri_v3
v3_65ea21959f3a3b36_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0, 0, 0, 0.18, 0.82 ]
The new shelving unit doubles capacity in the constrained zone; additionally blocks the fire egress path. Context: in the seismic zone, immediately after go-live. Reported by the operator.
Rate code-compliance risk for this scenario on a 0-5 scale.
resource_placement
spatial
yuri_v3
v3_062ac6e47a2e5458_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.01, 0.13, 0.59, 0.24, 0.03, 0 ]
A cache node satisfies the 1.5m clearance code; additionally needs climate control the room lacks. Context: under the current lease terms, at the end of the fiscal period. Reported by the automated check.
Rate code-compliance risk for this scenario on a 0-5 scale.
resource_placement
spatial
yuri_v3
v3_c41d6e755234d2eb_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.0101, 0.0606, 0.2525, 0.5657, 0.101, 0.0101 ]
The delivery route is the shortest path by 6 minutes; additionally is closed for a parade until 14:00. Context: under a 90-minute deadline, under an active deadline. Reported by the review queue.
Rate route difficulty for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_442f047724f654ba_n
noul
[ "false", "true" ]
[ 0.67, 0.33 ]
A cache node fits the rated floor load of 400kg/m2; additionally creates a single point of failure. Context: in facility A, while legacy systems are still active. Reported by the review queue.
Is this scenario one where: relocation is required?
resource_placement
spatial
yuri_v3
v3_3f8a09df703f46d5_c
choice
[ "capacity", "redundancy", "accessibility", "safety" ]
[ 0.27, 0.47, 0, 0.26 ]
The overflow stock requires a permit for the added height; additionally is within the redundancy requirement. Context: in facility A, shortly after a software update. Reported by the operator.
Priority zone for this scenario.
resource_placement
spatial
yuri_v3
v3_ec4210501c712d2a_n
noul
[ "false", "true" ]
[ 0.07, 0.93 ]
The project milestone needs a document that takes 15 days to obtain; additionally requires signoffs from 4 people with 2 on leave. Context: under the contract terms, while legacy systems are still active. Reported by the review queue.
Is this scenario one where: a buffer is required?
temporal_reasoning
spatial
yuri_v3
v3_a4342303bda28fa9_c
choice
[ "start_now", "expedite", "renegotiate_date", "escalate_blocker" ]
[ 0.61, 0.27, 0.03, 0.09 ]
The renewal deadline was completed 2 days early; additionally has sequential steps summing past the deadline. Context: with expedite fees available, during normal operations. Reported by the operator.
Timing decision for this scenario.
temporal_reasoning
spatial
yuri_v3
v3_f7066e70adb2225f_c
choice
[ "start_now", "expedite", "renegotiate_date", "escalate_blocker" ]
[ 0.38, 0.35, 0.08, 0.19 ]
The project milestone was completed 2 days early; additionally depends on a vendor response with a 5-day SLA. Context: under the contract terms, at the end of the fiscal period. Reported by the supervisor.
Timing decision for this scenario.
temporal_reasoning
spatial
yuri_v3
v3_05a54a884e54a524_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0.01, 0.04, 0.45, 0.49, 0.01 ]
An evacuation path has a weight-restricted road; additionally is the shortest path by 6 minutes. Context: with a 3,500kg vehicle, during the holiday freeze. Reported by the automated check.
Rate arrival risk for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_197717eea6345fb5_c
choice
[ "capacity", "redundancy", "accessibility", "safety" ]
[ 0.11, 0, 0.04, 0.85 ]
The overflow stock requires a permit for the added height; additionally satisfies the 1.5m clearance code. Context: under the current lease terms, at the end of the fiscal period. Reported by the review queue.
Priority zone for this scenario.
resource_placement
spatial
yuri_v3
v3_2719bb1ea52f6c51_c
choice
[ "fastest", "shortest", "safest", "cheapest" ]
[ 0.45, 0.38, 0.17, 0 ]
The delivery route has a bridge with a 4.2m height limit; additionally is the shortest path by 6 minutes. Context: under a 90-minute deadline, during a scheduled maintenance window. Reported by the monitoring system.
Mode for this scenario.
navigation_routing
spatial
yuri_v3
v3_6637b55450bc1c09_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0, 0, 0.11, 0.85, 0.04 ]
An evacuation path crosses a flood-warning zone; additionally is closed for a parade until 14:00. Context: under a 90-minute deadline, following a recent audit. Reported by the review queue.
Rate arrival risk for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_82371191a8a848a3_c
choice
[ "approved", "approved_with_conditions", "relocate", "reject" ]
[ 0.86, 0.14, 0, 0 ]
A cache node is within the redundancy requirement; additionally satisfies the 1.5m clearance code. Context: in the seismic zone, following a recent audit. Reported by the operator.
Placement for this scenario.
resource_placement
spatial
yuri_v3
v3_9035485d7d58d6f1_n
noul
[ "false", "true" ]
[ 0.92, 0.08 ]
An evacuation path has charging available at the midpoint; additionally includes a toll segment costing $14. Context: under a 90-minute deadline, during peak load. Reported by the operator.
Is this scenario one where: a closure blocks the path?
navigation_routing
spatial
yuri_v3
v3_18e34ce219febe28_c
choice
[ "start_now", "expedite", "renegotiate_date", "escalate_blocker" ]
[ 0.05, 0.46, 0, 0.49 ]
The certification window depends on a vendor response with a 5-day SLA; additionally has a 10-business-day regulatory clock. Context: before quarter close, under an active deadline. Reported by the supervisor.
Timing decision for this scenario.
temporal_reasoning
spatial
yuri_v3
v3_779fef78fed81937_n
noul
[ "false", "true" ]
[ 0.26, 0.74 ]
The backup generator creates a single point of failure; additionally fits the rated floor load of 400kg/m2. Context: under the current lease terms, during the quarterly review. Reported by the review queue.
Is this scenario one where: the load rating is sufficient?
resource_placement
spatial
yuri_v3
v3_1d49488c80c5ce04_n
noul
[ "false", "true" ]
[ 0.74, 0.26 ]
An evacuation path is the shortest path by 6 minutes; additionally is closed for a parade until 14:00. Context: with hazardous cargo, during a scheduled maintenance window. Reported by the operator.
Is this scenario one where: the ETA is achievable?
navigation_routing
spatial
yuri_v3
v3_93c3965fbda025fe_n
noul
[ "false", "true" ]
[ 0.28, 0.72 ]
The overflow stock needs climate control the room lacks; additionally would sit 2m from the water main. Context: in the seismic zone, at the end of the fiscal period. Reported by the automated check.
Is this scenario one where: relocation is required?
resource_placement
spatial
yuri_v3
v3_a694863d38303459_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.06, 0.01, 0.01, 0.18, 0.7, 0.04 ]
The overflow stock creates a single point of failure; additionally shares a circuit already at 82% load. Context: on the mezzanine level, with staffing at reduced levels. Reported by the review queue.
Rate capacity gain for this scenario on a 0-5 scale.
resource_placement
spatial
yuri_v3
v3_148afad49e477682_c
choice
[ "approvals", "vendor", "compliance", "resources" ]
[ 0.01, 0.22, 0.77, 0 ]
The renewal deadline was completed 2 days early; additionally has a 10-business-day regulatory clock. Context: per the standard SLA, during an external partner integration. Reported by the automated check.
Critical path for this scenario.
temporal_reasoning
spatial
yuri_v3
v3_14f0189950fa83a3_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0.04, 0.23, 0.6, 0.13, 0 ]
The warehouse robot is the shortest path by 6 minutes; additionally requires an unpaved segment for 8km. Context: with a 3,500kg vehicle, during an external partner integration. Reported by the supervisor.
Rate arrival risk for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_6e3bda1125225c5b_n
noul
[ "false", "true" ]
[ 0.2, 0.8 ]
A cache node blocks the fire egress path; additionally doubles capacity in the constrained zone. Context: in the seismic zone, during the holiday freeze. Reported by the review queue.
Is this scenario one where: relocation is required?
resource_placement
spatial
yuri_v3
v3_e1038a098535637f_n
noul
[ "false", "true" ]
[ 0.74, 0.26 ]
The new shelving unit creates a single point of failure; additionally shares a circuit already at 82% load. Context: under the current lease terms, shortly after a software update. Reported by the review queue.
Is this scenario one where: the placement meets code?
resource_placement
spatial
yuri_v3
v3_09c3f53f9045f018_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0, 0.03, 0.33, 0.6, 0.04 ]
The certification window expires 30 days before the audit; additionally has a built-in 3-day buffer. Context: per the standard SLA, under an active deadline. Reported by the automated check.
Rate deadline pressure for this scenario on a 0-5 scale.
temporal_reasoning
spatial
yuri_v3
v3_0ef9483f4f190475_n
noul
[ "false", "true" ]
[ 0.1, 0.9 ]
The approval chain has sequential steps summing past the deadline; additionally can start only after the freeze lifts. Context: before quarter close, during the holiday freeze. Reported by the monitoring system.
Is this scenario one where: a buffer is required?
temporal_reasoning
spatial
yuri_v3
v3_b002469c58d8fba5_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0.04, 0.15, 0.75, 0.06, 0 ]
The delivery route has charging available at the midpoint; additionally has a bridge with a 4.2m height limit. Context: under a 90-minute deadline, under an active deadline. Reported by the automated check.
Rate route difficulty for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_795f5c56d031ddc0_n
noul
[ "false", "true" ]
[ 0.84, 0.16 ]
The delivery route has a bridge with a 4.2m height limit; additionally crosses a flood-warning zone. Context: under a 90-minute deadline, during the morning shift. Reported by the on-call engineer.
Is this scenario one where: a closure blocks the path?
navigation_routing
spatial
yuri_v3
v3_42508d2582cb0962_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0.0202, 0.1414, 0.697, 0.1414, 0 ]
The overflow stock requires a permit for the added height; additionally would sit 2m from the water main. Context: on the mezzanine level, during normal operations. Reported by the review queue.
Rate code-compliance risk for this scenario on a 0-5 scale.
resource_placement
spatial
yuri_v3
v3_a2c492ca12e80220_n
noul
[ "false", "true" ]
[ 0.77, 0.23 ]
The backup generator requires a permit for the added height; additionally is within the redundancy requirement. Context: under the current lease terms, during normal operations. Reported by the automated check.
Is this scenario one where: relocation is required?
resource_placement
spatial
yuri_v3
v3_9cd423e1e0b237e1_n
noul
[ "false", "true" ]
[ 0.81, 0.19 ]
The overflow stock is within the redundancy requirement; additionally would sit 2m from the water main. Context: in the seismic zone, during normal operations. Reported by the review queue.
Is this scenario one where: relocation is required?
resource_placement
spatial
yuri_v3
v3_8052a9dc42d418a7_c
choice
[ "highway_bypass", "urban_direct", "toll_road", "wait_for_clearance" ]
[ 0.25, 0, 0.01, 0.74 ]
An autonomous vehicle has charging available at the midpoint; additionally crosses a flood-warning zone. Context: with a 3,500kg vehicle, at the end of the fiscal period. Reported by the review queue.
Route choice for this scenario.
navigation_routing
spatial
yuri_v3
v3_26631806ef8a2772_n
noul
[ "false", "true" ]
[ 0.85, 0.15 ]
The approval chain depends on a vendor response with a 5-day SLA; additionally has sequential steps summing past the deadline. Context: under the contract terms, during the holiday freeze. Reported by the automated check.
Is this scenario one where: the sequence is valid?
temporal_reasoning
spatial
yuri_v3
v3_be7a7a1038ea5665_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0, 0.02, 0.78, 0.2, 0 ]
The delivery route passes an active school zone at dismissal; additionally requires an unpaved segment for 8km. Context: with a 3,500kg vehicle, with a new vendor onboarded. Reported by the on-call engineer.
Rate arrival risk for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_5feed4599948ed79_c
choice
[ "approvals", "vendor", "compliance", "resources" ]
[ 0.49, 0.13, 0.37, 0.01 ]
The approval chain was completed 2 days early; additionally expires 30 days before the audit. Context: with expedite fees available, with a new vendor onboarded. Reported by the supervisor.
Critical path for this scenario.
temporal_reasoning
spatial
yuri_v3
v3_241bcdedb6e159de_c
choice
[ "approvals", "vendor", "compliance", "resources" ]
[ 0.02, 0.07, 0.91, 0 ]
The certification window has a built-in 3-day buffer; additionally needs a document that takes 15 days to obtain. Context: before quarter close, following a recent audit. Reported by the review queue.
Critical path for this scenario.
temporal_reasoning
spatial
yuri_v3
v3_37579da7826ffbdd_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0.01, 0.04, 0.08, 0.57, 0.3 ]
The new shelving unit blocks the fire egress path; additionally is within the redundancy requirement. Context: in the seismic zone, shortly after a software update. Reported by the on-call engineer.
Rate code-compliance risk for this scenario on a 0-5 scale.
resource_placement
spatial
yuri_v3
v3_f93711bcc98f21d4_n
noul
[ "false", "true" ]
[ 0.89, 0.11 ]
The certification window needs a document that takes 15 days to obtain; additionally has sequential steps summing past the deadline. Context: before quarter close, shortly after a software update. Reported by the supervisor.
Is this scenario one where: the deadline is achievable?
temporal_reasoning
spatial
yuri_v3
v3_c8adc0620becdc74_n
noul
[ "false", "true" ]
[ 0.56, 0.44 ]
A cache node requires a permit for the added height; additionally doubles capacity in the constrained zone. Context: in facility A, during normal operations. Reported by the automated check.
Is this scenario one where: the load rating is sufficient?
resource_placement
spatial
yuri_v3
v3_e5a4c1d8e8862eed_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.01, 0.1, 0.12, 0.43, 0.31, 0.03 ]
The renewal deadline has a built-in 3-day buffer; additionally has sequential steps summing past the deadline. Context: per the standard SLA, during a scheduled maintenance window. Reported by the automated check.
Rate deadline pressure for this scenario on a 0-5 scale.
temporal_reasoning
spatial
yuri_v3
v3_069e3f5407b18de0_n
noul
[ "false", "true" ]
[ 0.37, 0.63 ]
The new shelving unit doubles capacity in the constrained zone; additionally is within the redundancy requirement. Context: on the mezzanine level, under reduced staffing. Reported by the monitoring system.
Is this scenario one where: the load rating is sufficient?
resource_placement
spatial
yuri_v3
v3_de523e70943064cd_n
noul
[ "false", "true" ]
[ 0.8, 0.2 ]
An evacuation path passes an active school zone at dismissal; additionally requires an unpaved segment for 8km. Context: in low-visibility conditions, during the holiday freeze. Reported by the operator.
Is this scenario one where: a closure blocks the path?
navigation_routing
spatial
yuri_v3
v3_82a204b900688429_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0.05, 0.18, 0.69, 0.08, 0 ]
The warehouse robot requires an unpaved segment for 8km; additionally is the shortest path by 6 minutes. Context: with a 3,500kg vehicle, while legacy systems are still active. Reported by the operator.
Rate arrival risk for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_1526d718bb0c9488_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0, 0, 0.02, 0.81, 0.17 ]
The project milestone has a 10-business-day regulatory clock; additionally has sequential steps summing past the deadline. Context: before quarter close, during the holiday freeze. Reported by the operator.
Rate deadline pressure for this scenario on a 0-5 scale.
temporal_reasoning
spatial
yuri_v3
v3_abbc5fcc6829ce55_n
noul
[ "false", "true" ]
[ 0.57, 0.43 ]
The project milestone lands on a public holiday; additionally depends on a vendor response with a 5-day SLA. Context: before quarter close, following a recent audit. Reported by the review queue.
Is this scenario one where: the sequence is valid?
temporal_reasoning
spatial
yuri_v3
v3_ef7570382fbc78e6_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.08, 0.01, 0.01, 0.13, 0.72, 0.05 ]
The new shelving unit creates a single point of failure; additionally shares a circuit already at 82% load. Context: in the seismic zone, under an active deadline. Reported by the review queue.
Rate capacity gain for this scenario on a 0-5 scale.
resource_placement
spatial
yuri_v3
v3_9b49cb15bc9c1468_c
choice
[ "highway_bypass", "urban_direct", "toll_road", "wait_for_clearance" ]
[ 0.45, 0.08, 0.08, 0.39 ]
The warehouse robot requires an unpaved segment for 8km; additionally is the shortest path by 6 minutes. Context: with hazardous cargo, at the end of the fiscal period. Reported by the automated check.
Route choice for this scenario.
navigation_routing
spatial
yuri_v3
v3_0873c5bac34876c3_n
noul
[ "false", "true" ]
[ 0.59, 0.41 ]
The delivery route has charging available at the midpoint; additionally crosses a flood-warning zone. Context: with hazardous cargo, under an active deadline. Reported by the monitoring system.
Is this scenario one where: the ETA is achievable?
navigation_routing
spatial
yuri_v3
v3_c59f0c760c4bf22b_c
choice
[ "start_now", "expedite", "renegotiate_date", "escalate_blocker" ]
[ 0.04, 0.66, 0.18, 0.12 ]
The project milestone lands on a public holiday; additionally expires 30 days before the audit. Context: with expedite fees available, under reduced staffing. Reported by the operator.
Timing decision for this scenario.
temporal_reasoning
spatial
yuri_v3
v3_7c02d99241415d63_n
noul
[ "false", "true" ]
[ 0.09, 0.91 ]
The certification window requires signoffs from 4 people with 2 on leave; additionally lands on a public holiday. Context: before quarter close, while legacy systems are still active. Reported by the supervisor.
Is this scenario one where: a buffer is required?
temporal_reasoning
spatial
yuri_v3
v3_2ad62ebd4ac7554e_n
noul
[ "false", "true" ]
[ 0.71, 0.29 ]
The backup generator creates a single point of failure; additionally doubles capacity in the constrained zone. Context: on the mezzanine level, under reduced staffing. Reported by the automated check.
Is this scenario one where: the placement meets code?
resource_placement
spatial
yuri_v3
v3_32505c53bbe2d9c6_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0.01, 0.04, 0.12, 0.47, 0.33, 0.03 ]
The backup generator needs climate control the room lacks; additionally doubles capacity in the constrained zone. Context: in the seismic zone, following a recent audit. Reported by the supervisor.
Rate capacity gain for this scenario on a 0-5 scale.
resource_placement
spatial
yuri_v3
v3_1080246f63f191e5_s
score
[ "0", "1", "2", "3", "4", "5" ]
[ 0, 0.01, 0.04, 0.7, 0.25, 0 ]
The warehouse robot has charging available at the midpoint; additionally is closed for a parade until 14:00. Context: in low-visibility conditions, during the holiday freeze. Reported by the review queue.
Rate route difficulty for this scenario on a 0-5 scale.
navigation_routing
spatial
yuri_v3
v3_4348e79d19d1d0ab_n
noul
[ "false", "true" ]
[ 0.73, 0.27 ]
The backup generator requires a permit for the added height; additionally creates a single point of failure. Context: in the seismic zone, with staffing at reduced levels. Reported by the on-call engineer.
Is this scenario one where: relocation is required?
resource_placement
spatial
yuri_v3
v3_9b3d2d9db3bec823_c
choice
[ "approved", "approved_with_conditions", "relocate", "reject" ]
[ 0.53, 0.39, 0.04, 0.04 ]
The overflow stock fits the rated floor load of 400kg/m2; additionally would sit 2m from the water main. Context: under the current lease terms, immediately after go-live. Reported by the supervisor.
Placement for this scenario.
resource_placement
spatial
yuri_v3
End of preview. Expand in Data Studio

JEV corpus - spatial family

22,966 typed calibrated decision rows from the jev-distill-corpus-v3 corpus, grouped by family.

Each row is one typed decision: kind (noul / choice / score), a state, a question, options, and a target probability distribution over the options.

Domains in this family

  • temporal_reasoning - 7,784 rows
  • resource_placement - 7,641 rows
  • navigation_routing - 7,541 rows

Other views of the same data

Downloads last month
-