Sentence Similarity
sentence-transformers
Safetensors
mpnet
feature-extraction
Generated from Trainer
dataset_size:6241
loss:CosineSimilarityLoss
text-embeddings-inference
Instructions to use ennygaebs/cv-jd-matcher with libraries, inference providers, notebooks, and local apps. Follow these links to get started.
- Libraries
- sentence-transformers
How to use ennygaebs/cv-jd-matcher with sentence-transformers:
from sentence_transformers import SentenceTransformer model = SentenceTransformer("ennygaebs/cv-jd-matcher") sentences = [ "Professional SummarySeeking a position as an electrical engineer at the management level. Licensed Professional Electrical Engineer with over fifteen years of extensive and progressive professional experience in the Mass Transit and Electric Power Utility Industries. Currently serve as a lead engineer and technical expert for supporting and coordinating multiple complex electrical engineering projects for all Pepco's transmission and distribution substations. \nServed as a Senior Electrical Engineer and a technical expert with extensive latitude in the Engineering Support Services Department at WMATA. Evaluated, designed, and coordinated multiple difficult and complex electrical engineering projects for WMATA's rail, bus, and maintenance facilities. Inspected and analyzed various electrical equipment and facilities throughout the entire WMATA's system, and provided engineering reports with recommendations and detailing inadequacies and variances. Provided expert advice and guidance on code compliance and good engineering practices to the maintenance department to rectify various electrical engineering issues. Performed feasibility and reliability studies on existing and proposed electric systems. Performed in-depth technical and economical evaluations of existing and proposed electric systems. Provided assistance to the Assistant Chief Engineer to train, assign work, and mentor junior engineers.\nProject Engineer: Managed multiple complex infrastructure and facility engineering projects and ensured work adhere to approved permit drawings, specifications and design criteria. Planned, organized, initiated and monitored various WMATA's facility projects and Pepco's transmission and distribution substations construction projects. Developed and provided cost estimates and scope of work to senior management.\nWritten and Oral Communications: Write reports, technical specifications and procedures to effectively install equipment, electrical systems and operate the transmission and distribution systems. Provide presentations and detailed load analysis reports with supporting load calculations, contingency plans, and system analysis to senior management. Provide electrical construction progress reports to management. Represent Company in equipment inspections and meetings with consultants, county inspectors, manufacturers, and contractors.\nCore QualificationsGuest servicesInventory control proceduresMerchandising expertiseLoss preventionCash register operationsProduct promotions\nExperience08/2011toPresentAssistant Chief EngineerMarriott International–Omaha,,Transit Infrastructure and Engineering Services Serving as the Assistant Chief Engineer of AC power for all of WMATA's facilities that includes all Passenger Rail Stations, Bus, and other ancillary facilities.Manages a team of eleven electrical engineers...08/2010to08/2011Lead Electrical Engineer System OperationsHdr, Inc.–Ann Arbor,,Perform the role of Lead Electrical Engineer that perform electrical system studies and evaluate impacts of planned outages using GE's energy management system software, power system simulator software, and other engineering tools.Model and provides updates for PJM's model in accordance to industry standards.Review and provide system operations advice and guidance to all co-generation customers including solar and photovoltaic generating plants.Manages Company's under-frequency and manual load shed programs.Ensure Company is compliant in regards to NERC requirements for UFLS and critical assets programs.Monitor the system operations daily activity report and initiate investigations in abnormal system behavior.Perform the duties of a Restoration Information Coordinator that provides investigative work on outages for critical customers.Work independently to provide normal and after hours support to the system operators.Major Accomplishments: Revised and maintain Company's Restoration Manual.Revised several system operations procedures.Successfully coordinated the implementation of metering equipment for several co-generation customers.Worked with construction crews to develop and maintain outage schedules.Simulated and provided documentation of load data profiles of substation batteries.Provided documentation that certified the company in regards to NERC requirements.03/2007to08/2010Senior Electrical Engineer–Baltimore,,Performed the role of Senior Electrical Engineer that was responsible for establishing technical objectives of major complex projects; mentoring and coaching team members; assigning tasks to junior engineers; providing cost benefit analysis of equipment selection and managing projects deliverables.Coordinated and reviewed construction drawings, shop drawings, catalog cut sheets, electrical systems including high and low voltage switchgears, switchboards, electrical panels, transformers, motors, fans, power cables, conduits, electrical fittings and lighting systems submitted by contractors.Reviewed and provided comments and advice with emphasis on constructability, reliability and safety, on final electrical design plans, specifications and concepts.Ensured electrical equipment and installations conformed to relevant industry standards such as ANSI, IEEE, NEMA, OSHA, NEC, NESC, WMATA's design criteria, specifications and standards, and good engineering practices.Major Accomplishments: Analyzed the Jackson Graham Building's electrical power system of WMATA's main office building and provided an in-depth assessment report that recommended a redesign of the facility electrical power distribution system.Analyzed the Carmen Turner Facility's electrical power system and provided an in-depth assessment report that recommended a redesign of its electrical power distribution system.The redesigned system provides redundancy and improves the overall reliability by upgrading the secondary 480V service to a 13.8kV primary service.WMATA is currently acting upon those recommendations.Redesigned WMATA's main facility electrical power distribution system and provided a complete set of AUTOCAD drawings.Led a multi-disciplined team of engineers (Civil, Structural and Mechanical) and an Architect that provided a comprehensive design with specifications of a new electrical substation building, duct banks and transformers.Selected as a voting member to serve on the WMATA Contractor Evaluation Board (CEB).Designed the electrical power supply and distribution system of a new data center.Designed the electrical system to support the neutral host cellular equipment that allows passengers to use cellular phones in underground stations.Analyzed WMATA's office building electrical power system and provided a written power outage assessment report with recommendations.Designed a control system for the Alexandria rail yard vehicle exhaust system.Provided during construction a quick and permanent fix for a car wash hot water heater electrical system.Provided guidance to maintenance department to alleviate power quality issues at several fan shafts.Provided detail calculations and an alternative design to rebut consultant's uneconomical proposal to fix drainage pumping station power quality issues and circuit breaker nuisance tripping.Designed the electrical system of a maintenance building.03/2000to03/2007Senior Electrical EngineerHdr, Inc.–City,,Served as Senior Electrical Engineer independently and effectively performing complex work, such as, designing electrical systems which incorporated engineering theories, standards and concepts.Analyzed co-generation and high voltage electrical designs for commercial customer such as WMATA to ensure connection to the transmission and distribution electric system would not negatively impact the system's integrity and reliability.Provided technical guidance and creative solutions to management to solve complex electrical engineering issues.Ensured electrical equipment and installations conformed to relevant industry standards such as ANSI, IEEE, NEMA, OSHA, NEC, NESC, company's specifications and standards, and good utility practices.Coordinated, reviewed and provided feedback on submitted shop drawings of switchgears, gas-insulated circuit breakers, gas and vacuum circuit breakers, power transformers, current and potential transformers, shunt reactors, disconnect switches, current limiting protectors, and various multifunction and power management relays from various manufacturers.Provided engineering support to contractors, maintenance, and construction crews to ensure installations of electrical equipment were correct, of high quality, and adhered to specifications and standards.Major Accomplishments: Successfully modified a 230kV transmission station to accommodate two new underground 230kV feeders that alleviated the reliability concerns caused by the closure of a nearby generating plant.This project was sanctioned and monitored by the Department of Energy.Provided electrical engineering design and guidance to successfully installed four hybrid-gas-insulated circuit breakers, two gas circuit breakers and two 100MVA shunt reactors.Inspected and witnessed testing of hybrid-gas-insulated circuit breakers in Osaka, Japan.Effectively rebuilt a three-bus-section, 80 MVA distribution substation.Installed several new 15kV, 34kV and 69kV transmission and distribution feeders.Modified several existing 15kV switchgears to accommodate new feeder cubicles.Double legged several existing feeders to feed new customer's substation.Successfully designed and installed ventilation systems in several substations and control houses.Revised company's guide specifications and equipment specifications for transformers, switchgears, circuit breakers and shunt reactors.Led a team that manages the installation efforts of high voltage customer's switchgear to the electric system.Led quarterly high voltage status meetings attended by the strategic accounts manager and supervisors of substation, system planning, system protection and distribution departments.Coordinated efforts between various engineering groups and field personnel that ensured customer's equipment adhered to specifications and in-service deadlines were met.Maintained computer database of files and drawings of all high voltage and co-generation commercial customer installations.Inspected numerous customers' switchgears and provided written reports to the strategic accounts manager detailing equipment and installation deficiencies.Resolved hazardous conditions with existing customers' switchgears and electrical vault room.Revised company's guide specifications for metal-clad and metal-enclosed switchgears.Promoted from Associate Engineer to Engineer and then to Senior Engineer.\nEducationExpected inAugust 2016totoMaster of Science:ManagementUniversity of Maryland University College-Adelphi,MDGPA:ManagementExpected inAugust 2015totoGraduate Certificate (Project Management:-,GPA:Expected inDecember 1999totoBachelor of Science:Electrical Engineering (Power)University of Maryland University College-Adelphi,MDGPA:Electrical Engineering (Power)Expected intotoN. W. Washington, DC Professional Development And Training Financial Accounting (May - June, 2015) NFPA 70 National Electric Code Essentials Seminar (March 17 - 19, 2014) Transmission Security Management I & II (September 27 - October 1, 2010):Howard University-,GPA:Expected intotoPower Systems Analysis I; Power Systems Analysis II; Senior Thesis and Design (The Economical Tradeoff of a Distributed Generation System); Power Electronics; Energy Conversion. Major topics covered in courses are: Anatomy of Power Systems (Problems and Remedies); Nature of Faults (Safety and Economics); Reliability (Quality and Security); Advance Techniques for Fault Studies; Power System Protection; Generator; Transformer; Stability (Stability Limits, Formulation and Energy Function Method); Reliability (SAIFI, SAIDI, CAIDI, ASUI and ASAI). Courses at the advance level in Management: Organization Theory Design and Project Management.:-,GPA:\nSkillsMicrosoft PC-based word processing, spreadsheet, presentation, and email software. Skilled in AutoCAD and MicroStation design software. Experienced in SAP, WMIS and PeopleSoft software. Familiarity with Visio and MAXIMO software. Experienced in GE's XA/21 software. Experienced in Siemens PSSE software. Experienced in PI Historian database software.", "Centurion Consulting Group is looking for a Software Development Manager This is a DIRECT HIRE and requires a local candidate in Mclean, VA. This role is a hybrid role. \nPrimary Responsibilities:Must have Staff management & development, supervising a team of approximately 15-20 people.Staff planning, including adjusting to shifting priorities and solving problems quickly.Mentoring staff to maintain high levels of performance and positive morale.Collaborate with internal functional and project managers, and customers in forming strategies to improve performance.Act as scrum of scrums master to manage work streams of multiple sprint teams.Manage release plan and road map for agile development.Lead scrum team as scrum master for multiple projects.Serve as Subject Matter Expert (SME) on Agile development methods and processes.Manage software development processes using GitHub, Atlassian Jira and Confluence, Sonar Cloud.Basic Qualifications:B.S. in computer science, engineering, or other science disciplines with 8+ years of prior relevant experience, or Master's degree with 6+ years of prior relevant experience.Hands-on experience coding with C++ andor JavaJ2EE software development.Skilled in designing, developing, and managing applications using both relational and non-relational databases.Understand and leverage common software development architectural styles and patterns (SOA, Microservices, etc.).Understand and apply quality techniques and practices (automated unit testing, Test Driven DesignDevelopment, continuous integration).Familiarity with communication protocols, such as TCP, UDP, SNMP.Design and develop fully scalable applications.Professional writing and oral presentation skills.Strong knowledge of software development methodologies and life cycle.Knowledge or experience analyzing or developing ITS andor control systems.Experience developing real-time, embedded software is a plus.Version control architecture and management skills.Experience developing architecture and designing complex systems.Strong knowledge of ITS, V2X.Knowledge of NTCIP, SAE, and IEEE standards as they pertain to ITS and Connected Vehicle domains.Experience in business and proposal development.You Might Also Have:Experience with Software Architecture and Software Release.Experience with message queuesmessage brokersdata streaming such as Apache Kafka, and NATS.Experience developing and consuming SOAP andor REST web services using specifications such as Open API.Experience developing user interfaces and web pages using frontend website development tools such as HTML5, CSS3, JavaScript, React, etc.Experience with automation or robotics principlesBasic familiarity with the physics of a moving vehicle, especially as relates to lateral control and steering.Experience with Robot Operating System (ROS)Experience working with or implementing telematics systems and data visualization technologies.Experience with Git, Docker (including Docker-compose), and continuous integrationcontinuous deployment using Docker and Sonar Cloud.Experience with Spring frameworkExperience working on Agile projects and working with Agile toolsets, such as JIRA and ConfluenceHands-on experience developing code with UnityHTC ViveHighly proactive, self-motivated, and has sharp self-time management.Detail-oriented, highly organized, and strong ability to multi-task.Ability to flourish within a dynamic, fun team environment as well as work independently.Flexible and comfortable with changing direction and competing priorities.Clearance Required:Ability to obtain and maintain a Public Trust security clearance (which includes three years of immediate residency in the US).\nPosition Details: Clearance: Ability to Obtain a Public TrustUS Citizenship or Authorization to work in US required.Travel: < 10% (CONUS)Centurion Consulting Group, LLC is an Equal Opportunity Employer EOE MFDVNo third parties or subcontractors", "Position: Cost Accountant Reports to: President The CompanyWith double-digit annual growth rate since our founding in 1998, we are continuing to expand our dynamic team. As a contract manufacturer for in-vitro diagnostics, we make sure great products get made. The Natech learning organization develops collaborative problem solvers who help our customers launch and scale new medical devices.\nThe OpportunityThis is an opportunity to take our accounting systems to the next level and manage the integration with our publicly listed parent Stratec SE.\nPosition Responsibilities Essential FunctionsRun general ledger accounts bookkeeping including monthly closing according to local GAAP and IFRSUS GAAPMaintenance of cost and profit centers, standard costing, and project-based costing in our ERP system IQMS by Dassault. Overseeing subsystems relevant for Month end closing e.g. semi-annual physical inventory management.Manage staff responsible for accounting data entry and motivate various non-reporting functions to do their part.Monitoring cost variance in concert with Production and Engineering teams.Prepare annual budgets together with Director of Finance and Leadership team members and project budgets with Project Managers.Minimum Qualifications SkillsBachelor's degree in accounting.5 years of corporate accounting experience at a manufacturing firm according to International Financial Reporting Standards (IFRS) or US GAAPFluency with Cost & Profit Center Accounting methods in a manufacturing environment.Deep understanding of manufacturing ERP systems and proficiency with Microsoft office.Highly DesirableMasters degree in business administration (MBA) and or CPA.Ability to write SQL queries and create Crystal Reports.Physical RequirementsProlonged periods of sitting at a desk and working on a computer.Must be able to lift up to 15 pounds at times. We are an Equal Opportunity Employer and do not discriminate on the basis of race, color, religion, age, gender, national origin, genetic information, sexual orientation, gender identity characteristics or expression, familial status, citizenship status, marital status, disability, veteran status, domestic violence victim status, height, weight or any other legally protected status, in any employment decisions, including, but not limited to, recruitment, hiring, compensation, training, apprenticeship, promotion, demotion, transfer, layoff, termination, and any other term and condition of employment. All employment-related decisions are based solely on relevant criteria, including training, experience, education, qualifications, abilities, and suitability.\n", "Skills - Cucumber BDD + Selenium UI Automation Experience\nExcellent knowledge and experience in testing Financial Domain applications. Hands-on experience in Test Plan, Test Case, and Test Scenario development. Experience in creating data requests based on test cases and data mining." ] embeddings = model.encode(sentences) similarities = model.similarity(embeddings, embeddings) print(similarities.shape) # [4, 4] - Notebooks
- Google Colab
- Kaggle
File too large to display, you can check the raw version instead.