Spaces:
Sleeping
Sleeping
File size: 1,963 Bytes
048e38b |
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 |
[
{
"Category": "ACCEPTANCE",
"Field Name": "Acceptance Test Criteria",
"Description": "Specific criteria that the vision system must meet for acceptance.",
"User Answer": ""
},
{
"Category": "ACCEPTANCE",
"Field Name": "Trial Period",
"Description": "The duration of the testing phase before final acceptance.",
"User Answer": ""
},
{
"Category": "ACCEPTANCE",
"Field Name": "Sample Size for Testing",
"Description": "Number of samples to be tested during the acceptance phase.",
"User Answer": ""
},
{
"Category": "ACCEPTANCE",
"Field Name": "Failure Thresholds",
"Description": "Defined limits for what constitutes a failure during testing.",
"User Answer": ""
},
{
"Category": "ACCEPTANCE",
"Field Name": "Reporting Requirements",
"Description": "Details on reporting format and frequency during the trial period.",
"User Answer": ""
},
{
"Category": "ACCEPTANCE",
"Field Name": "On-Site Evaluation",
"Description": "Requirement for on-site testing as part of the acceptance process.",
"User Answer": ""
},
{
"Category": "ACCEPTANCE",
"Field Name": "Post-Implementation Review",
"Description": "Schedule and criteria for reviewing the system's performance post-implementation.",
"User Answer": ""
},
{
"Category": "ACCEPTANCE",
"Field Name": "User Training Completion",
"Description": "Confirmation that user training has been successfully completed.",
"User Answer": ""
},
{
"Category": "ACCEPTANCE",
"Field Name": "System Integration Test",
"Description": "Testing the system's integration with existing processes and equipment.",
"User Answer": ""
},
{
"Category": "ACCEPTANCE",
"Field Name": "Final Acceptance Sign-off",
"Description": "Process for formally accepting the system, including any necessary documentation or approvals.",
"User Answer": ""
}
] |