Mattral commited on
Commit
8672336
1 Parent(s): 1798f81

Update info.md

Browse files
Files changed (1) hide show
  1. info.md +36 -1
info.md CHANGED
@@ -50,6 +50,23 @@ FP= Flare Platform
50
  • Dedicated HS for blowout disabling during rig operation.
51
  • Partial stroking facilities for ESV valves for testing purposes.
52
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
53
 
54
  ________________________________
55
 
@@ -1655,4 +1672,22 @@ FP= Flare Platform
1655
 
1656
  • ESD 0 push buttons hardwired to platform ESD systems.
1657
  • Dedicated HS for blowout disabling during rig operation.
1658
- • Partial stroking facilities for ESV valves for testing purposes.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
50
  • Dedicated HS for blowout disabling during rig operation.
51
  • Partial stroking facilities for ESV valves for testing purposes.
52
 
53
+ Pipeline System:
54
+ • 36" pipeline transports gas (domestic and export) to delivery points at PLC and Thai border.
55
+ • Offshore pipeline length: 346 km to coast. (Yadana offshore to Pipeline Centre)
56
+ • Onshore pipeline length: 63 km. ( Pipeline centre to Metering Station)
57
+
58
+ • Custody transferred to PTT of Thailand at border.
59
+ • Gas further transported by 238 km long 42" pipeline from Metering station to Ratchaburi where main users are EGAT and TECO Power Plants.
60
+
61
+ Pressure Requirements:
62
+ • Required delivery pressure at EGAT power plant: 36.9 bar (550 psia).
63
+ • Contractual delivery pressure at Thai border: Maximum 64.5 bar (950 psia).
64
+
65
+ Gas Delivery:
66
+ MMSCFD = million standard cubic feet per day
67
+ • Normal domestic gas supply to MOGE at PLC: 50 MMSCFD since June 2010.
68
+ • Maximum export gas delivery to PTT: 720 MMSCFD with border back pressure around 53 barg (780 psig) by running PTT BVW7 compressors.
69
+ • Maximum delivery to PTT recorded around 750 MMSCFD in May 2011.
70
 
71
  ________________________________
72
 
 
1672
 
1673
  • ESD 0 push buttons hardwired to platform ESD systems.
1674
  • Dedicated HS for blowout disabling during rig operation.
1675
+ • Partial stroking facilities for ESV valves for testing purposes.
1676
+
1677
+ Pipeline System:
1678
+ • 36" pipeline transports gas (domestic and export) to delivery points at PLC and Thai border.
1679
+ • Offshore pipeline length: 346 km to coast. (Yadana offshore to Pipeline Centre)
1680
+ • Onshore pipeline length: 63 km. ( Pipeline centre to Metering Station)
1681
+
1682
+ • Custody transferred to PTT of Thailand at border.
1683
+ • Gas further transported by 238 km long 42" pipeline from Metering station to Ratchaburi where main users are EGAT and TECO Power Plants.
1684
+
1685
+ Pressure Requirements:
1686
+ • Required delivery pressure at EGAT power plant: 36.9 bar (550 psia).
1687
+ • Contractual delivery pressure at Thai border: Maximum 64.5 bar (950 psia).
1688
+
1689
+ Gas Delivery:
1690
+ MMSCFD = million standard cubic feet per day
1691
+ • Normal domestic gas supply to MOGE at PLC: 50 MMSCFD since June 2010.
1692
+ • Maximum export gas delivery to PTT: 720 MMSCFD with border back pressure around 53 barg (780 psig) by running PTT BVW7 compressors.
1693
+ • Maximum delivery to PTT recorded around 750 MMSCFD in May 2011.