@@ -7,6 +7,46 @@ The operational activities of PTTEP cover a significant area within Myanmar, inc
7
  - Ban-I-Tong Metering Station.
8
 
9
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
10
  1.1. Yadana Development History (Offshore)
11
  1. Phase 1 (Installation of WP2):
12
  • Remote wellhead platform (WP2) installed with a 20" subsea production line.
@@ -1566,4 +1606,44 @@ of theasset.
1566
  ▪ Identification of areas for improvement that will result in progressively better SSHE
1567
  management.
1568
  The outcomes of SSHE audits and reviews are managed to facilitate the implementation of
1569
- changestoenhanceprocessesandreducerisks.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
7
  - Ban-I-Tong Metering Station.
8
 
9
 
10
+ Important Glossary:(very important)
11
+ WP1= wellhead platform 1
12
+ WP2= wellhead platform 2
13
+ WP3= wellhead platform 3
14
+ WP4= wellhead platform 4
15
+ QP2 = QUarter Platform
16
+ PP = Producrion Platform
17
+ LCP = low compression platform
18
+ MCP = Medium Compression Platform
19
+ FP= Flare Platform
20
+
21
+ 1. ESD Levels:
22
+ • ESD Level 0: Abandon installation, initiates a black shutdown.
23
+ • ESD Level 1: General emergency shutdown, closes all ESVs and initiates blow-down.
24
+ • ESD Level 2: General process shutdown, stops production.
25
+ • ESD Level 3: Individual process shutdown.
26
+
27
+
28
+ • ESD0 initiated automatically on confirmed gas detection or manually with approval.
29
+ • ESD1 initiated by F&G system and push buttons.
30
+ • ESD2 initiated by key safety switches and push buttons.
31
+
32
+ • Each platform is equipped with its own ESD system.
33
+ • Connected to the Control Room via hardwire link or telemetry system.
34
+ • PLC used for ESD control, with operator interface and DCS console.
35
+
36
+ • Local independent electro-hydraulic panel for shutdown execution.
37
+ • ESD actions can be initiated from the Control Room.
38
+
39
+ • Local resetting required on ESVs and SDVs after any ESD level.
40
+ • BDVs can be reset from the Control Room.
41
+ • Partial stroking facilities for ESD Valve Function testing.
42
+
43
+ • ESD 0 push buttons hardwired to platform ESD systems.
44
+ • Dedicated HS for blowout disabling during rig operation.
45
+ • Partial stroking facilities for ESV valves for testing purposes.
46
+
47
+
48
+ ________________________________
49
+
50
  1.1. Yadana Development History (Offshore)
51
  1. Phase 1 (Installation of WP2):
52
  • Remote wellhead platform (WP2) installed with a 20" subsea production line.
 
1606
  ▪ Identification of areas for improvement that will result in progressively better SSHE
1607
  management.
1608
  The outcomes of SSHE audits and reviews are managed to facilitate the implementation of
1609
+ changestoenhanceprocessesandreducerisks.
1610
+
1611
+
1612
+ _____________
1613
+ Important Glossary:(very important)
1614
+ WP1= wellhead platform 1
1615
+ WP2= wellhead platform 2
1616
+ WP3= wellhead platform 3
1617
+ WP4= wellhead platform 4
1618
+ QP2 = QUarter Platform
1619
+ PP = Producrion Platform
1620
+ LCP = low compression platform
1621
+ MCP = Medium Compression Platform
1622
+ FP= Flare Platform
1623
+
1624
+ 1. ESD Levels:
1625
+ 2.
1626
+ • ESD Level 0: Abandon installation, initiates a black shutdown.
1627
+ • ESD Level 1: General emergency shutdown, closes all ESVs and initiates blow-down.
1628
+ • ESD Level 2: General process shutdown, stops production.
1629
+ • ESD Level 3: Individual process shutdown.
1630
+
1631
+
1632
+ • ESD0 initiated automatically on confirmed gas detection or manually with approval.
1633
+ • ESD1 initiated by F&G system and push buttons.
1634
+ • ESD2 initiated by key safety switches and push buttons.
1635
+
1636
+ • Each platform is equipped with its own ESD system.
1637
+ • Connected to the Control Room via hardwire link or telemetry system.
1638
+ • PLC used for ESD control, with operator interface and DCS console.
1639
+
1640
+ • Local independent electro-hydraulic panel for shutdown execution.
1641
+ • ESD actions can be initiated from the Control Room.
1642
+
1643
+ • Local resetting required on ESVs and SDVs after any ESD level.
1644
+ • BDVs can be reset from the Control Room.
1645
+ • Partial stroking facilities for ESD Valve Function testing.
1646
+
1647
+ • ESD 0 push buttons hardwired to platform ESD systems.
1648
+ • Dedicated HS for blowout disabling during rig operation.
1649
+ • Partial stroking facilities for ESV valves for testing purposes.