text
stringlengths
9
324
label
int64
0
10
Piston forced down
6
PIA TS-135, Revision 1.4, Issued April 22, 2010, Page 6 of 18
7
the action’s emissions are within the
9
a common-collector amplifier in the active mode when amplifying
0
and liquid nitrogen. A Dewar bottle has an inner and an outer
9
AUTOROTATION IN FORWARD FLIGHT
7
blades, and feather (rotate about the pitch axis to change lift).
9
Chart Symbology - Helicopter Charts
5
entity or a prior concession contract, which led to early termination of that prior contract,
6
runways: visual, nonprecision instrument, and
9
Adequate ventilation shall be ensured and permanent lighting shall be provided through the galleries.
9
一月前までに(法第六条の十五第一項の指定を受けた日の属する事業年度にあつては、
3
Above the tropopause lies the stratosphere. Temperature
9
Self-Launching Glider Electrical System
7
number of onsite and off-site days.
3
by striking the item relating to subchapter III
9
Comply with the VFR visibility and distance-from-
3
Visual Approach Slope Indicator (VASI)
7
withheld.
9
Basting and temporary tacking should be made using thread that is of a contrasting color to the
3
Description
7
MKS-Kabelbahn
8
Bulk materials required to manufacture items are listed in the Bulk Material group of this manual. NSNs
9
II.16 RÉDUCTION DES PRIX
7
において「将来の病床数の必要量」という。)に達していないものに係る医療を提供
9
18" Station
6
Claims and liability
7
zuletzt durch Artikel 412 der Verordnung vom 31. August 2015 (BGBl. I S. 1474) geändert worden ist"
9
radio phone-ins
3
bestanden ist oder
3
is carried on, and all the right, title and interest of such person in the lot or tract of
9
Chart Supplement U.S. (formerly Airport/Facility Directory).
9
and consistency of the snow, evaluating surface condi-
9
Performing Ignition System Checks
7
§ 5 Prüfungsanforderungen im Teil "Berufsausbildung und Mitarbeiterführung"
7
Any person charged by law
9
First-stage centrifugal compressor
6
The franchise
7
and always review the manufacturer’s documentation to
9
Supplement. Service volume restrictions do not
9
The method and outcome of inspection of records on medical care and the
3
CONDITIONS.)
9
of those intentions. It also promotes accountability and transparency.
9
high end glider flight computer.
9
SRM is a formalized approach to integrated system safety. It both informs decision-makers
9
II.21.6. Interim payments and payment of the balance
7
and row 43 to row 45 of Appended Table 2) to North Korea" in Article 2,
3
For the Contracting Authority:
7
Successful tenderer’s Helpdesk shall be available in English via phone and/or email during
3
Anti-Skid System Maintenance
7
Acquisition of land
7
Scientific data management
7
ply full power and check the wing is LOC (lines free,
9
would a pilot turn right or left for the shortest way
3
〔昭和五十五年五月二十六日政令第百三十八号〕〔抄〕
7
"Zweite Verordnung zur Durchführung des Finanzausgleichsgesetzes im Ausgleichsjahr 2015 vom 5. Februar
9
und Wissenschaft:
9
by regulation under the provisions of 14 CFR part 99, and
9
in a crab during takeoff acceleration. On glaze ice an
9
RESOURCE ALLOCATION
7
Tender Evaluation Session
7
NAVWEPS DO-ROT-80
7
Center patch material over prepared hole.
3
Even if the contracting authority authorises subcontracting, the contractor remains
3
Demonstration-Performance Method
7
HUMAN RESOURCE AND ADMINISTRATION
7
Safety Standards for a special purpose lens. This lens can be
9
Preparation
7
any necessary briefings.
3
SRM Document Approval
3
The ability
9
project manager
3
規定の適用については、次に定めるところによる。
3
expected readings.
3
[Figure 16-15]
9
Two or three standard burns in a row from equilibrium
9
failure, the cause must be found, corrected, and all affected tests repeated.
9
Delamination
6
Taxi fares are not reimbursed.
3
Matt Liknaitzky of MGL Avionics
9
the inspection and proper testing of all provincial and municipal standards of
9
removed from the bus. The reverse current sensing function
9
Proper material and size compatible with specifications and dimensions of goods shall be offered by Contractor and approved by Contracting Authority.
3
Shall serve ECHA in the provision of
3
headgear.
0
Environmental Quality.” [42 USC § 4321 -
9
MARKING, STOWAGE CONTAINER - OPERATING LIMITS:
7
zweifelsfrei feststeht. Hat der Sachverständige oder Prüfer den Führerschein ausgehändigt, teilt er dies
9
various push-pull rods and tubes. Secure all locknuts, cotter
9
with automatic altitude reporting capability and
9
205). Published RNAV routes are RNAV
9
FRAMEWORK CONTRACT
7
focal points and partners at national level
7
descend to hold the visual reference line on the pylon. As
9
Assessment by a health care professional
7
The maximum hydraulic load on the wastewater treatment plant will not exceed the pre-
3
The following topics must be addressed in the PSP:
9
Achieve Goals
7
90° the rate of closure with the road increases rapidly.
9
each power of attorney to perform any act whatsoever, except
3