text
stringlengths 9
324
| label
int64 0
10
|
---|---|
специально установленных мест. | 9 |
If necessary for | 6 |
‘‘(d) In this section, the term ‘qualifying position’ means a | 9 |
international ancillary sportspersons involved in that elite sports event; | 3 |
Vortex Behavior | 7 |
5,718 feet. Next, locate the outside air temperature on the | 9 |
Length (threads flush with ends of barrel) | 6 |
number of batches wasted or rejected | 3 |
surface in the transition from hovering to forward | 3 |
entitled to late-payment interest at the rate and for the period mentioned in the | 3 |
integrity of the aircraft if control of the pressurization system | 9 |
病院であるときは、病床数 | 3 |
several other publications are available to the user. Almost | 9 |
The glide slope transmitter is located between | 9 |
Failure to cross-check all available instruments. | 3 |
repair station when work is required. Reports of anti-skid | 9 |
Implementing the Decision and Evaluating the Outcome | 7 |
II.19.2. Fatturazione elettronica | 7 |
“Hydraulic Load” derived commitment for the plant components: | 7 |
Schedule must be referred to and settled by arbitration under article 62 (arbitration). | 9 |
or who knowingly aids or abets in the conduct of such business, shall in addition to | 9 |
Mandatory criteria | 9 |
航空機は、核兵器又は軍用の化学製剤若しくは細菌製剤若しくはこれらの散布のため | 3 |
The width of the crack is less than | 3 |
with weight changes and adhere to the | 9 |
Landescode und Nummer des Stammzertifikates; | 3 |
that law); | 3 |
polarity~ | 9 |
adequate way to manipulate the aircraft’s control surfaces. Later in training, when they need to divert their attention away from the | 9 |
Malfunctions | 7 |
Der Ausbildende hat unter Zugrundelegung des Ausbildungsrahmenplans für den Auszubildenden einen | 9 |
Standards and rules | 7 |
be printed in blue. Magnetic reference courses will be shown originating from a waypoint, fix/reporting point or NAVAID. | 9 |
Die §§ 5 bis 8 des Pflegezeitgesetzes gelten entsprechend. | 9 |
heat-treated condition, welding should not be done unless | 9 |
ELETTRONICA | 7 |
国又は地方公共団体が資本金、基本金その他これらに準ずるものの二分の一以上 | 3 |
TYPE OF IDENTITY DOCUMENT | 6 |
In the table below the minimum service level requirements (SLRs) listed are accompanied by a penalty scheme to be activated in case of | 9 |
Figure 4-6. | 3 |
FAA Guidance | 7 |
Program Safety Requirements for Decommissioning and Disposal | 3 |
ISD Executive Secretariat | 7 |
the many years of gyroplane development, a wide | 9 |
Losflansch mit Bund DN 250 | 7 |
Ring Release Housing Replacement | 7 |
Compliance | 3 |
(reference No. …. of | 9 |
inspection room; | 3 |
the same province. The duties of these officers shall in general be such as are | 9 |
does not pay by the due date and if the amount cannot be offset in accordance | 3 |
velocity shows the variation of induced, para- | 9 |
Implementation of the framework contract | 7 |
Handling of errors: | 7 |
machines capable of shearing, squaring, and trimming | 9 |
Departure Procedures | 7 |
Support for stakeholder relations management | 7 |
For example, if an airplane in steady flight is | 9 |
the wing, interrupting or spoiling the airflow over the wings. | 9 |
§ 5 Ausbildungsplan | 7 |
insbesondere unter Berücksichtigung der Betriebsorganisation, der betrieblichen Aus- und Weiterbildung, | 3 |
An electrohydraulic tire bead breaker (left) used on large tires and a manual tire bead breaker (right) used on small tires. | 0 |
others as follows: | 3 |
Figure 16-89. | 0 |
provides a relative indication of that at the inlet. Although | 9 |
установленным | 9 |
ПРИЛОЖЕНИЕ № 1 | 7 |
Takeoff Charts | 7 |
shows the variation of induced, parasite, and | 9 |
be direct replacements for the Hi-Lok$^{®}$ and lockbolt. Many | 9 |
the United States burial corps when acting under the authority of the laws and | 9 |
Weather Conditions | 7 |
prepared bond surfaces. | 9 |
the enhancement of existing DCns already configured to address collected | 3 |
Secretariat services | 7 |
Verification of non-exclusion of tenderers on the basis of the exclusion criteria | 3 |
Article 3 - | 7 |
during takeoff, flight, and landing, what feelings and | 9 |
施行日前に消費生活用製品安全法第四十条第一項、第四十一条第一項又は第四 | 3 |
Check the stitching and corner reinforcing. | 3 |
Amendment to the Nursing and Midwifery Order 2001 | 7 |
$^{ }$Common Paint Troubles | 7 |
[355-246; Cooley's Blackstone, p. 241.] | 9 |
scaling changes to linear instead of continuing to | 9 |
: May not be used with main parachute breakaway device”. | 9 |
hereinafter: the " | 9 |
the supplies, or shall pay any balance still due to the contractor. | 3 |
. — There | 9 |
sealed can be charged and capacity checked in the same area. | 9 |
Ensure control lines run free through proper slider grommets, and then through proper control line | 3 |
Ram-Air Reserve into a Sport Piggyback System | 7 |
[Figure 6-1] | 9 |
請求をしようとする情報の概要 | 3 |
Northerly Turning Errors | 7 |
Fuel Storage Tanks | 7 |
stitching. Note that there is a second row of stitching | 3 |
extra costs for ECHA. In this regard, basic start-up activities are foreseen to take place for | 9 |
the total. | 9 |
Evaluation of tenders | 7 |
integration activities and a Scientific Data Warehouse (SDWH) to address data needs in | 9 |