text
stringlengths
9
324
label
int64
0
10
Cam engine.
9
le soumissionnaire (y compris tous les membres du groupement
6
This may allow for a more accurate control of the
3
Preparing/Revising the Safety Requirements Verification Table
7
Nonprecision instrument.
3
hourly CO
9
Hardware and software needs regular updates to
3
Schedule No 8: Roads, Landscaping and Fences
7
district, assessmen
9
approach fix or point and extending to the airport or
9
No management response.
7
cases where obstacles intervene to prevent pilots from maintaining obstacle clearance during a normal climb to a
3
Consent to prosecutions
7
taxiway locations, gate assignments, stack height, and airport operational profiles (see
9
the steering bars causes the steering lines to pull
9
Chapter 2$_{ }$
7
for planning operations, review of standard
8
pattern indicators
6
conditional upon provision of the original certificates/documents from the successful Tenderer.
9
services either when the contractor provides it with supporting documents or on the
3
documentary evidence upon request.
9
False glide slope signals may exist in the area of the
9
該構想区域における同号イに規定する将来の病床数の必要量(第三十条の二十八の三
9
Fachrichtung
7
The depth of the crack is less than
3
The contracting authority may suspend the payment periods specified in Article I.6 at any time by
9
The AOA should be increased at a rate that allows the aircraft
9
further WAAS guidance, see paragraph 1
9
Auftragnehmer trägt
3
landing light wiring circuits
3
inscription is the designation of the runway on which
9
– ELEMENTI DI PROVA AI FINI DELLA SELEZIONE
7
plumbing and connect the various components. Most lines
9
Volume and value of the contract
7
value (RVV), or runway visual range (RVR). However, only
9
dures should be discussed. At a minimum, it should
9
Adjust the pitch attitude smoothly to avoid overcontrolling.
9
General electrical requirements
7
if the Vice-President ceases to perform the functions of the office of President.
3
departure control.
9