text
stringlengths 9
324
| label
int64 0
10
|
---|---|
PERSONNEL PARACHUTE SYSTEM | 7 |
Management and placement of advertisement | 7 |
1.b) 2. Zwischenzahlung – Nach endgültiger Montage und Umschluß der | 7 |
government is, at any time, the target of comprehensive country or territory-wide sanction or restrictive measure imposed | 1 |
30° OF FLOW ANGULARITY | 6 |
Coordination Best Practices | 7 |
Requesting a Special Registration Number | 7 |
La suspension prend effet à la date d'envoi de la | 9 |
ければならない事項は、第一項第五号、第八号、第九号及び第十一号から第十四号ま | 3 |
Termination by the contractor | 7 |
dissipating requirements of the brakes. | 9 |
TURNING FLIGHT | 7 |
S’assurer que le matériel est arrimé. | 3 |
Financial Evaluation | 7 |
of higher pressure than on the inside, and ram air increases | 9 |
to be paid for such realty, after making proper allowance for | 3 |
each Class B airspace is individually tailored and consists | 9 |
Nettoerträge aus dem Außenhandelsgeschäft, | 3 |
Abschnitt 5 | 7 |
NAVWEPS DO-ROT-80 | 7 |
departure | 9 |
the person reasonably believes that their assessed degree of permanent disablement (“the | 3 |
overlying the 48 contiguous states, the District of | 9 |
Award and notification of the outcomes of the procurement procedure | 7 |
International Civil Aviation Organization (ICAO). | 7 |
bestanden ist oder | 3 |
monitoring automatic flight control systems. | 9 |
being liable to | 9 |
(See MINIMUM IFR ALTITUDES.) | 9 |
For hybrid, "online +" | 7 |
Please note that a request for supporting documents by the | 7 |
ripcord housings are compressible only, but some military | 9 |
is usually included to draw the air through the compressor | 9 |
Inspect rubber coupling for damage and aging (C type | 3 |
The loft facility houses the sewing machines and other | 9 |
Preliminary Pages | 7 |
The Institute is funded by Government grants, and in the year | 9 |
line to the correct pressure altitude of 4,000 feet. From this | 9 |
responds to glideslope | 9 |
Name der Fachkraft für Arbeitssicherheit ........................................................... | 3 |
the intent to circumvent fiscal, social or any other legal obligations in the | 6 |
Final approach angles/descent gradient for public | 9 |
Existing trees | 7 |
“the North Northamptonshire districts” means the districts of Corby, East Northamptonshire, | 9 |
(ii) keeping an adequate distance between an X-ray appliance, etc. and a | 3 |
In-Service | 9 |
Gandara, Guiuan, Hernani, Laoang, Lavezares, Llorente, Mondragon, Oquendo, | 9 |
The air and gas release valves can be operated | 9 |
病院等の管理者は、法第六条の十二の規定に基づき、次に掲げる安全管 | 3 |
Programme of implementation of the tasks | 7 |
Article 5 – Price | 7 |
Merkmals; das Kinegramm wird durch die Vordrucknummerierung teilweise überdruckt. Die | 3 |
Power cabling | 3 |
when P is travelling to or from, or attending the location of, an elite sports event in | 3 |
Four-blade hingeless (rigid) main rotor. Rotor blades are comprised of glass fiber reinforced material. The hub is a single | 0 |
which a component’s signals are processed. | 9 |
Restricted category civil aircraft must be operated in accordance with an FAA Form 8130-7, | 9 |
Additional administrative documentation | 7 |
VETERAN DESCRIBED.—A veteran described in this para- | 9 |
iii. aucun accès n'est accordé à ces données en dehors de l'Union européenne et de l'Espace | 9 |
if applicable | 3 |
The helicopter performance, | 6 |
Research shows that humans have a limited capacity for | 9 |
Contractor’s national partner to arrange an effective transportation of 15, 30 or 50 pax (e.g. | 3 |
specify what EFSA will buy under the contract resulting from this procurement | 3 |
The operator must give the undertaker reasonable notice of any such claim or demand and no | 9 |
contract manager; | 3 |
remotely controlled ground/ground communications | 9 |
Automatic Decision-Making | 7 |
Contratto quadro di servizi no. .................. | 9 |
stroke, the net work | 9 |
the rest of the wing. | 9 |
II.20.3. Umrechnung | 7 |
must also | 9 |
allows drilling on both flat and curved material; | 3 |
Problem (SWAMP) | 7 |
Unnamed Road (between | 8 |
you will encounter a problem called “fixation.” This | 9 |
when transmitting to, or receiving from, these high-altitude | 9 |
Article 32 Warranty obligations | 7 |
Simplified Directional Facility | 7 |
eral Regulations (or any successor regulations)) that | 9 |
differentiated from civil beacons by dualpeaked (two | 9 |
Lack of compression | 3 |
当該他の病院又は診療所に対し、当該特定臨床研究の実施に関する包括的な支 | 3 |
indicator and the mirror landing system will | 9 |
Contract, signed by the Parties before the End Date. | 3 |
BUY THROUGH THIS PROCUREMENT PROCEDURE? | 7 |
United States or of any state thereof, if the aircraft | 3 |
SNET and organisation of the BRIDGE operational meetings; | 3 |
Granting of facilities for the implementation of programmes and execution of contracts | 7 |
in subsection (1)(b)(i), for “a trading scheme registry” substitute “the Kyoto Protocol | 3 |
and address of the | 3 |
temperature is also an indication of proper operation of the | 9 |
sites in the western sections of the country. Local | 9 |
A line drawn through the last two plots provides a basis | 0 |
Installation of Rivets | 7 |
$_{............ }$HOWIE V1 JFK V229 BDR (Single engine on | 6 |
a radio phone-in | 7 |
forward airspeed and decrease the rate of descent. | 9 |