question
stringlengths 58
131
| QuestionText
stringlengths 7
54
| context
stringlengths 72
1.68k
| Sector
stringclasses 19
values | Country
stringlengths 4
32
| answers
dict | Document
stringclasses 4
values | Alpha3
stringlengths 3
3
| SubSector
stringlengths 3
91
| split
stringclasses 3
values | Question_Definition
stringlengths 10
78
| id
stringlengths 1
5
|
---|---|---|---|---|---|---|---|---|---|---|---|
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | The Australian Government is working to build climate resilience and support adaptation to climate change. Australia will develop a National Climate Resilience and Adaptation Strategy during 2015. The Australian Government is commencing the development of a range of policies that will reduce emissions into the post-2020 period, including a National Energy Productivity Plan with a National Energy Productivity Target of a 40 per cent improvement between 2015 and 2030, the investigation of opportunities to improve the efficiency of light and heavy vehicles, and the enhanced management of synthetic greenhouse gas emissions under ozone protection laws and the Montreal Protocol. | Energy | Australia | {
"answer_start": [
52
],
"text": [
"national energy productivity plan with a national energy productivity target of a 40 per cent improvement between 2015 and 2030"
]
} | INDC | AUS | Energy: General | train | Targets at the sectoral level | 30937 |
What upstream policies and strategies are mentioned in Energy Sector ? | Upstream policies on | The Government is finalising a safeguard mechanism to ensure emissions reductions purchased under the Fund are not offset by significant rises in emissions elsewhere in the economy. Australia has additional policy measures in place to promote the deployment of renewable energy and improve energy efficiency. Under Australia’s Renewable Energy Target scheme, over 23 per cent of Australia’s electricity will come from renewable sources by 2020. | Energy | Australia | {
"answer_start": [
30
],
"text": [
"additional policy measures in place to promote the deployment of renewable energy and improve energy efficiency. under australia’s renewable energy"
]
} | INDC | AUS | Renewable Energy | train | Information on upstream policies for a given sector | 30938 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | Carbon capture and storage – CO2 compression, hub transport and storage under $20/t of CO2. Expected deployment timeframe. 2025–2030. Soil carbon measurement under $3/ha/year. Advancement in proximal sensing, modelling and remote sensing technologies. 2025–2030. | Energy | Australia | {
"answer_start": [
0
],
"text": [
"carbon capture and storage – co2 compression, hub transport and storage under $20/t of co2. expected deployment timeframe. 2025–2030. soil carbon measurement under $"
]
} | Revised First NDC | AUS | CCS | train | Targets at the sectoral level | 30939 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | Under the other deployment pathway, steep reductions in the costs of renewable electricity and electrolysis could make the stretch goal feasible between 2028–2035 (for production of clean hydrogen with electrolysis). Annual low emissions technology statements and State of Hydrogen reports will track progress against this cost goal. | Energy | Australia | {
"answer_start": [
12
],
"text": [
"renewable electricity and electrolysis could make the stretch goal feasible between 2028–2035 (for production of clean hydrogen with electrolysis"
]
} | Revised First NDC | AUS | Renewable Energy | train | Targets at the sectoral level | 30940 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | Priority technology stretch goal. Potential pathway. Expected timeframe for achievement. Clean hydrogen production under $2/kg. Steam methane reforming with CCS. 2025–2030. Renewable electrolysis. 2028–2035. Ultra low-cost solar – solar electricity generation at $15/MWh. Large scale solar. 2030–2035. Energy storage – electricity from storage for firming under $100/MWh. Lithium-ion batteries. 2025–2030. | Energy | Australia | {
"answer_start": [
3,
35
],
"text": [
"goal. potential pathway. expected timeframe",
"ultra low-cost solar – solar electricity generation at $15/mwh. large scale solar. 2030–2035. energy storage – electricity from storage for firming under $100/mwh"
]
} | Revised First NDC | AUS | Renewable Energy: Solar: Utility Scale | val | Targets at the sectoral level | 30941 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | Priority technology stretch goal. Potential pathway. Expected timeframe for achievement. Clean hydrogen production under $2/kg. Steam methane reforming with CCS. 2025–2030. Renewable electrolysis. 2028–2035. Ultra low-cost solar – solar electricity generation at $15/MWh. Large scale solar. 2030–2035. Energy storage – electricity from storage for firming under $100/MWh. Lithium-ion batteries. 2025–2030. | Energy | Australia | {
"answer_start": [
3,
42,
56
],
"text": [
"goal. potential pathway. expected timeframe",
"electricity generation at $15/mwh",
"energy storage – electricity from storage for firming under $100/mwh. lithium-ion batteries"
]
} | Revised First NDC | AUS | Supply-side Efficiency: Grid/energy loss reduction | train | Targets at the sectoral level | 30942 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Industries Sector ? | Sectoral targets on | Low emissions steel production under $700/t (based on the long run marginal cost). New build direct iron reduction plant using hydrogen. 2030–2040. Low emissions aluminium production under $2,200/t (based on the long run marginal cost). Renewable electricity and inert anodes. 2035–2040. | Industries | Australia | {
"answer_start": [
0
],
"text": [
"low emissions steel production under $700/t (based on the long run marginal cost). new build direct iron reduction plant using hydrogen. 2030–2040. low emissions aluminium production under $2,200/t (based on the long run marginal cost"
]
} | Revised First NDC | AUS | Iron and Steel | train | Targets at the sectoral level | 30943 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Industries Sector ? | Sectoral targets on | Low emissions steel production under $700/t (based on the long run marginal cost). New build direct iron reduction plant using hydrogen. 2030–2040. Low emissions aluminium production under $2,200/t (based on the long run marginal cost). Renewable electricity and inert anodes. 2035–2040. | Industries | Australia | {
"answer_start": [
0,
30
],
"text": [
"low emissions steel production under $700/t (based on the long run marginal cost",
"low emissions aluminium production under $2,200/t (based on the long run marginal cost). renewable electricity and inert anodes"
]
} | Revised First NDC | AUS | Industries: General | train | Targets at the sectoral level | 30944 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Agriculture Sector ? | Sectoral targets on | Carbon capture and storage – CO2 compression, hub transport and storage under $20/t of CO2. Expected deployment timeframe. 2025–2030. Soil carbon measurement under $3/ha/year. Advancement in proximal sensing, modelling and remote sensing technologies. 2025–2030. | Agriculture | Australia | {
"answer_start": [
22
],
"text": [
"timeframe. 2025–2030. soil carbon measurement under $3/ha/year. advancement in proximal sensing, modelling and remote sensing technologies"
]
} | Revised First NDC | AUS | Soils | train | Targets at the sectoral level | 30945 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | It names five priority technologies: clean hydrogen, energy storage, low carbon materials (steel and aluminium), carbon capture and storage, and soil carbon. These technologies address emissions in sectors that account for 90 per cent of global emissions, or around 45 billion tonnes CO2-e annually. | Energy | Australia | {
"answer_start": [
6,
21
],
"text": [
"clean hydrogen, energy storage, low carbon",
"carbon capture and storage, and soil carbon"
]
} | Revised First NDC | AUS | CCS | train | Targets at the sectoral level | 30946 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | To date, ARENA has contributed to 566 renewable energy projects with a total value of $6.69 billion, and the CEFC has invested in more than 170 direct clean energy transactions and 13 co- finance arrangements leading to investment in projects worth over $29.7 billion. Australia will continue to support reliable integration of renewable energy into the electricity grid. The CEFC will administer a $1 billion Grid Reliability Fund to ensure sufficient reliable energy capacity is available to meet periods of high demand in the National Electricity Market. | Energy | Australia | {
"answer_start": [
58
],
"text": [
"energy into the electricity"
]
} | Revised First NDC | AUS | Renewable Energy: Solar: Utility Scale | test | Targets at the sectoral level | 30947 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | To date, ARENA has contributed to 566 renewable energy projects with a total value of $6.69 billion, and the CEFC has invested in more than 170 direct clean energy transactions and 13 co- finance arrangements leading to investment in projects worth over $29.7 billion. Australia will continue to support reliable integration of renewable energy into the electricity grid. The CEFC will administer a $1 billion Grid Reliability Fund to ensure sufficient reliable energy capacity is available to meet periods of high demand in the National Electricity Market. | Energy | Australia | {
"answer_start": [
57
],
"text": [
"renewable energy into the electricity"
]
} | Revised First NDC | AUS | Supply-side Efficiency: Grid/energy loss reduction | train | Targets at the sectoral level | 30948 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Industries Sector ? | Sectoral targets on | the $3.5 billion Climate Solutions Package to expand investments in clean energy generation projects, energy efficiency and other economy wide emissions reductions measures. The package also includes an additional $2 billion for a Climate Solutions Fund to continue investment in low-cost abatement through the Emissions Reduction Fund and to support the adoption of new and emerging low emissions technologies in relatively hard-to-reach sectors. | Industries | Australia | {
"answer_start": [
12,
44,
59
],
"text": [
"energy generation projects, energy efficiency and other economy wide emissions reductions",
"low-cost abatement through the emissions reduction",
"new and emerging low emissions"
]
} | Revised First NDC | AUS | Iron and Steel | train | Targets at the sectoral level | 30949 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Industries Sector ? | Sectoral targets on | To date, ARENA has contributed to 566 renewable energy projects with a total value of $6.69 billion, and the CEFC has invested in more than 170 direct clean energy transactions and 13 co- finance arrangements leading to investment in projects worth over $29.7 billion. Australia will continue to support reliable integration of renewable energy into the electricity grid. The CEFC will administer a $1 billion Grid Reliability Fund to ensure sufficient reliable energy capacity is available to meet periods of high demand in the National Electricity Market. | Industries | Australia | {
"answer_start": [
57
],
"text": [
"renewable energy into the electricity"
]
} | Revised First NDC | AUS | Industries: General | train | Targets at the sectoral level | 30950 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Agriculture Sector ? | Sectoral targets on | It names five priority technologies: clean hydrogen, energy storage, low carbon materials (steel and aluminium), carbon capture and storage, and soil carbon. These technologies address emissions in sectors that account for 90 per cent of global emissions, or around 45 billion tonnes CO2-e annually. | Agriculture | Australia | {
"answer_start": [
4,
21
],
"text": [
"technologies: clean hydrogen, energy storage, low carbon",
"carbon capture and storage, and soil carbon. these technologies"
]
} | Revised First NDC | AUS | Soils | val | Targets at the sectoral level | 30951 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | A commitment to reduce the emissions of Commonwealth Government agencies to net zero by 2030 (excluding defence and security agencies). These new measures will build on existing emissions reduction and low emissions technology accelerator policies and programs including the Australian Renewable Energy Agency, the Clean Energy Finance Corporation, crediting under the Carbon Credits (Carbon Farming Initiative) Act 2011, and a range of investments to accelerate and facilitate low emissions and clean energy technologies, such as green hydrogen, energy storage, and low emissions steel and aluminium, to bring their costs down to make them competitive with higher emitting alternatives. | Energy | Australia | {
"answer_start": [
44,
56,
78
],
"text": [
"energy agency, the clean energy",
"carbon credits (carbon",
"clean energy technologies, such as green hydrogen, energy storage"
]
} | Revised First NDC | AUS | CCS | train | Targets at the sectoral level | 30952 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | A commitment to reduce the emissions of Commonwealth Government agencies to net zero by 2030 (excluding defence and security agencies). These new measures will build on existing emissions reduction and low emissions technology accelerator policies and programs including the Australian Renewable Energy Agency, the Clean Energy Finance Corporation, crediting under the Carbon Credits (Carbon Farming Initiative) Act 2011, and a range of investments to accelerate and facilitate low emissions and clean energy technologies, such as green hydrogen, energy storage, and low emissions steel and aluminium, to bring their costs down to make them competitive with higher emitting alternatives. | Energy | Australia | {
"answer_start": [
43,
78
],
"text": [
"renewable energy agency, the clean energy",
"clean energy technologies, such as green hydrogen, energy"
]
} | Revised First NDC | AUS | Renewable Energy | train | Targets at the sectoral level | 30953 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | A commitment to reduce the emissions of Commonwealth Government agencies to net zero by 2030 (excluding defence and security agencies). These new measures will build on existing emissions reduction and low emissions technology accelerator policies and programs including the Australian Renewable Energy Agency, the Clean Energy Finance Corporation, crediting under the Carbon Credits (Carbon Farming Initiative) Act 2011, and a range of investments to accelerate and facilitate low emissions and clean energy technologies, such as green hydrogen, energy storage, and low emissions steel and aluminium, to bring their costs down to make them competitive with higher emitting alternatives. | Energy | Australia | {
"answer_start": [
43,
87
],
"text": [
"renewable energy agency, the clean energy",
"energy storage"
]
} | Revised First NDC | AUS | Supply-side Efficiency: Grid/energy loss reduction | train | Targets at the sectoral level | 30954 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Industries Sector ? | Sectoral targets on | A commitment to reduce the emissions of Commonwealth Government agencies to net zero by 2030 (excluding defence and security agencies). These new measures will build on existing emissions reduction and low emissions technology accelerator policies and programs including the Australian Renewable Energy Agency, the Clean Energy Finance Corporation, crediting under the Carbon Credits (Carbon Farming Initiative) Act 2011, and a range of investments to accelerate and facilitate low emissions and clean energy technologies, such as green hydrogen, energy storage, and low emissions steel and aluminium, to bring their costs down to make them competitive with higher emitting alternatives. | Industries | Australia | {
"answer_start": [
24,
44,
75
],
"text": [
"new measures will build on existing emissions reduction and low emissions",
"energy agency, the clean energy",
"low emissions and clean energy technologies, such as green hydrogen, energy storage, and low emissions steel"
]
} | Revised First NDC | AUS | Iron and Steel | train | Targets at the sectoral level | 30955 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Industries Sector ? | Sectoral targets on | A commitment to reduce the emissions of Commonwealth Government agencies to net zero by 2030 (excluding defence and security agencies). These new measures will build on existing emissions reduction and low emissions technology accelerator policies and programs including the Australian Renewable Energy Agency, the Clean Energy Finance Corporation, crediting under the Carbon Credits (Carbon Farming Initiative) Act 2011, and a range of investments to accelerate and facilitate low emissions and clean energy technologies, such as green hydrogen, energy storage, and low emissions steel and aluminium, to bring their costs down to make them competitive with higher emitting alternatives. | Industries | Australia | {
"answer_start": [
30,
43,
75,
87
],
"text": [
"emissions reduction and low emissions",
"renewable energy agency, the clean energy",
"low emissions and clean energy",
"energy storage, and low emissions steel and aluminium, to bring their costs"
]
} | Revised First NDC | AUS | Industries: General | val | Targets at the sectoral level | 30956 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Agriculture Sector ? | Sectoral targets on | A commitment to reduce the emissions of Commonwealth Government agencies to net zero by 2030 (excluding defence and security agencies). These new measures will build on existing emissions reduction and low emissions technology accelerator policies and programs including the Australian Renewable Energy Agency, the Clean Energy Finance Corporation, crediting under the Carbon Credits (Carbon Farming Initiative) Act 2011, and a range of investments to accelerate and facilitate low emissions and clean energy technologies, such as green hydrogen, energy storage, and low emissions steel and aluminium, to bring their costs down to make them competitive with higher emitting alternatives. | Agriculture | Australia | {
"answer_start": [
44,
56
],
"text": [
"energy agency, the clean energy",
"carbon credits (carbon"
]
} | Revised First NDC | AUS | Soils | train | Targets at the sectoral level | 30957 |
What plans and strategies are mentioned pertaining to Buildings Sector ? | Sectoral plans on | to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). The BAU and considered mitigation scenario are shown in the chart below. | Buildings | Bosnia and Herzegovina | {
"answer_start": [
14
],
"text": [
"systemic energy rehabilitation of existing buildings (focus on public sector"
]
} | First NDC | BIH | Buildings: General | train | Information on sectoral plans | 30958 |
What is the conditional part of mitigation target provided for upstream plans and strategies in the Buildings Sector ? | Conditional part of mitigation target | This would result in a slower growth trend of emissions that would increase by 18% in 2030 compared to 1990. This mitigation scenario implies unconditional implementation of minimal technical requirements and sanitation activities related to increase energy efficiency within the buildings sector, e.g. | Buildings | Bosnia and Herzegovina | {
"answer_start": [
29
],
"text": [
"minimal technical requirements and sanitation activities"
]
} | First NDC | BIH | Buildings: General | test | Conditional part of mitigation target for a given sectoral upstream policy | 30959 |
What upstream policies and strategies are mentioned in Buildings Sector ? | Upstream policies on | This would result in a slower growth trend of emissions that would increase by 18% in 2030 compared to 1990. This mitigation scenario implies unconditional implementation of minimal technical requirements and sanitation activities related to increase energy efficiency within the buildings sector, e.g. | Buildings | Bosnia and Herzegovina | {
"answer_start": [
29
],
"text": [
"minimal technical requirements and sanitation activities"
]
} | First NDC | BIH | Buildings: General | train | Information on upstream policies for a given sector | 30960 |
What plans and strategies are mentioned pertaining to Energy Sector ? | Sectoral plans on | to construct co-generation plants fuelled by wood chips and wood waste from wood processing industry, with the individual power generation capacity of several MW and the total power generation capacity of 70 MW, by 2030. to replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power generation from methane from two underground mines (five coal-pits). | Energy | Bosnia and Herzegovina | {
"answer_start": [
67
],
"text": [
"power generation from methane from two underground mines (five coal-pits"
]
} | First NDC | BIH | Gas | train | Information on sectoral plans | 30961 |
What plans and strategies are mentioned pertaining to Energy Sector ? | Sectoral plans on | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). | Energy | Bosnia and Herzegovina | {
"answer_start": [
61
],
"text": [
"renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy"
]
} | First NDC | BIH | Renewable Energy | train | Information on sectoral plans | 30962 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. | Energy | Bosnia and Herzegovina | {
"answer_start": [
10,
36,
49
],
"text": [
"capacity of up to 10 mw and the total generation capacity of 120 mw, by 2030",
"capacity of 175 mw by 2030",
"total power generation capacity of 4 mw by 2030"
]
} | First NDC | BIH | Renewable Energy: Hydro | train | Targets at the sectoral level | 30963 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. | Energy | Bosnia and Herzegovina | {
"answer_start": [
10,
36,
49
],
"text": [
"capacity of up to 10 mw and the total generation capacity of 120 mw, by 2030",
"capacity of 175 mw by 2030",
"total power generation capacity of 4 mw by 2030"
]
} | First NDC | BIH | Renewable Energy: Hydro | train | Conditional part of the mitigation target for a given sectoral target | 30964 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). | Energy | Bosnia and Herzegovina | {
"answer_start": [
23,
39,
54
],
"text": [
"mw, by 2030",
"mw by 2030",
"4 mw by 2030"
]
} | First NDC | BIH | Renewable Energy: Solar | train | Targets at the sectoral level | 30965 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). | Energy | Bosnia and Herzegovina | {
"answer_start": [
23,
39,
54
],
"text": [
"mw, by 2030",
"mw by 2030",
"4 mw by 2030"
]
} | First NDC | BIH | Renewable Energy: Solar | train | Conditional part of the mitigation target for a given sectoral target | 30966 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). | Energy | Bosnia and Herzegovina | {
"answer_start": [
23,
38,
55
],
"text": [
"mw, by 2030",
"175 mw by 2030",
"mw by 2030"
]
} | First NDC | BIH | Renewable Energy: Wind | val | Targets at the sectoral level | 30967 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). | Energy | Bosnia and Herzegovina | {
"answer_start": [
23,
38,
55
],
"text": [
"mw, by 2030",
"175 mw by 2030",
"mw by 2030"
]
} | First NDC | BIH | Renewable Energy: Wind | val | Conditional part of the mitigation target for a given sectoral target | 30968 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | to construct co-generation plants fuelled by wood chips and wood waste from wood processing industry, with the individual power generation capacity of several MW and the total power generation capacity of 70 MW, by 2030. to replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power generation from methane from two underground mines (five coal-pits). | Energy | Bosnia and Herzegovina | {
"answer_start": [
41
],
"text": [
"replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power"
]
} | First NDC | BIH | Supply-side Efficiency: Power generation efficiency improvement | train | Conditional part of mitigation target for a given sectoral downstream actions | 30969 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | to construct co-generation plants fuelled by wood chips and wood waste from wood processing industry, with the individual power generation capacity of several MW and the total power generation capacity of 70 MW, by 2030. to replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power generation from methane from two underground mines (five coal-pits). | Energy | Bosnia and Herzegovina | {
"answer_start": [
41
],
"text": [
"replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power"
]
} | First NDC | BIH | Supply-side Efficiency: Power generation efficiency improvement | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 30970 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | to construct co-generation plants fuelled by wood chips and wood waste from wood processing industry, with the individual power generation capacity of several MW and the total power generation capacity of 70 MW, by 2030. to replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power generation from methane from two underground mines (five coal-pits). to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. | Energy | Bosnia and Herzegovina | {
"answer_start": [
22,
91,
117,
133
],
"text": [
"generation capacity of several mw and the total power generation capacity of 70 mw, by 2030",
"generation capacity of up to 10 mw and the total generation capacity of 120 mw, by 2030",
"generation capacity of 175 mw by 2030",
"generation capacity of 4 mw by 2030"
]
} | First NDC | BIH | Supply-side Efficiency: Power generation efficiency improvement: Cogeneration plants | train | Targets at the sectoral level | 30971 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | to construct co-generation plants fuelled by wood chips and wood waste from wood processing industry, with the individual power generation capacity of several MW and the total power generation capacity of 70 MW, by 2030. to replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power generation from methane from two underground mines (five coal-pits). to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. | Energy | Bosnia and Herzegovina | {
"answer_start": [
22,
91,
117,
133
],
"text": [
"generation capacity of several mw and the total power generation capacity of 70 mw, by 2030",
"generation capacity of up to 10 mw and the total generation capacity of 120 mw, by 2030",
"generation capacity of 175 mw by 2030",
"generation capacity of 4 mw by 2030"
]
} | First NDC | BIH | Supply-side Efficiency: Power generation efficiency improvement: Cogeneration plants | train | Conditional part of the mitigation target for a given sectoral target | 30972 |
What plans and strategies are mentioned pertaining to Energy Sector ? | Sectoral plans on | The highest emissions after 1990 were recorded in 2011 and they amounted to 28,107GgCO2eq, which is about 83% of 1990 emissions. The rise in emissions in 2011 primarily occurred due to increased power generation from coal-fired power plants. Year 2012 saw a significant drop in emissions as a result of a smaller share of thermal power plants in power generation. | Energy | Bosnia and Herzegovina | {
"answer_start": [
35,
61
],
"text": [
"power generation from coal-fired power",
"power plants in power generation"
]
} | First NDC | BIH | Gas | train | Information on sectoral plans | 30973 |
What plans and strategies are mentioned pertaining to Energy Sector ? | Sectoral plans on | Measures are also being implemented in other sectors, especially in the building sector: reducing the use of coal and heating oil with the implementation of energy efficiency measures to reduce heating and cooling needs, increasing the efficiency of heating and cooling systems, energy efficiency labelling and banning imports of used heating and cooling equipment, etc. Reform of the incentive system for RES will be aimed at encouraging the decentralisation of the energy system and the implementation of community energy projects. | Energy | Bosnia and Herzegovina | {
"answer_start": [
17,
77
],
"text": [
"use of coal and heating oil with the implementation of energy efficiency measures to reduce heating and cooling needs, increasing the efficiency of heating and cooling systems, energy efficiency labelling and banning imports of used heating",
"energy system and the implementation of community energy"
]
} | First NDC | BIH | Renewable Energy | train | Information on sectoral plans | 30974 |
What plans and strategies are mentioned pertaining to Buildings Sector ? | Sectoral plans on | to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). The BAU and considered mitigation scenario are shown in the chart below. | Buildings | Bosnia and Herzegovina | {
"answer_start": [
14
],
"text": [
"systemic energy rehabilitation of existing buildings (focus on public sector"
]
} | INDC | BIH | Buildings: General | train | Information on sectoral plans | 30975 |
What is the conditional part of mitigation target provided for upstream plans and strategies in the Buildings Sector ? | Conditional part of mitigation target | This would result in a slower growth trend of emissions that would increase by 18% in 2030 compared to 1990. This mitigation scenario implies unconditional implementation of minimal technical requirements and sanitation activities related to increase energy efficiency within the buildings sector, e.g. | Buildings | Bosnia and Herzegovina | {
"answer_start": [
29
],
"text": [
"minimal technical requirements and sanitation activities"
]
} | INDC | BIH | Buildings: General | train | Conditional part of mitigation target for a given sectoral upstream policy | 30976 |
What upstream policies and strategies are mentioned in Buildings Sector ? | Upstream policies on | This would result in a slower growth trend of emissions that would increase by 18% in 2030 compared to 1990. This mitigation scenario implies unconditional implementation of minimal technical requirements and sanitation activities related to increase energy efficiency within the buildings sector, e.g. | Buildings | Bosnia and Herzegovina | {
"answer_start": [
29
],
"text": [
"minimal technical requirements and sanitation activities"
]
} | INDC | BIH | Buildings: General | test | Information on upstream policies for a given sector | 30977 |
What plans and strategies are mentioned pertaining to Energy Sector ? | Sectoral plans on | to construct co-generation plants fuelled by wood chips and wood waste from wood processing industry, with the individual power generation capacity of several MW and the total power generation capacity of 70 MW, by 2030. to replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power generation from methane from two underground mines (five coal-pits). | Energy | Bosnia and Herzegovina | {
"answer_start": [
67
],
"text": [
"power generation from methane from two underground mines (five coal-pits"
]
} | INDC | BIH | Gas | test | Information on sectoral plans | 30978 |
What plans and strategies are mentioned pertaining to Energy Sector ? | Sectoral plans on | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). | Energy | Bosnia and Herzegovina | {
"answer_start": [
61
],
"text": [
"renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy"
]
} | INDC | BIH | Renewable Energy | train | Information on sectoral plans | 30979 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. | Energy | Bosnia and Herzegovina | {
"answer_start": [
10,
36,
49
],
"text": [
"capacity of up to 10 mw and the total generation capacity of 120 mw, by 2030",
"capacity of 175 mw by 2030",
"total power generation capacity of 4 mw by 2030"
]
} | INDC | BIH | Renewable Energy: Hydro | val | Targets at the sectoral level | 30980 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. | Energy | Bosnia and Herzegovina | {
"answer_start": [
10,
36,
49
],
"text": [
"capacity of up to 10 mw and the total generation capacity of 120 mw, by 2030",
"capacity of 175 mw by 2030",
"total power generation capacity of 4 mw by 2030"
]
} | INDC | BIH | Renewable Energy: Hydro | train | Conditional part of the mitigation target for a given sectoral target | 30981 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). | Energy | Bosnia and Herzegovina | {
"answer_start": [
23,
39,
54
],
"text": [
"mw, by 2030",
"mw by 2030",
"4 mw by 2030"
]
} | INDC | BIH | Renewable Energy: Solar | train | Targets at the sectoral level | 30982 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). | Energy | Bosnia and Herzegovina | {
"answer_start": [
23,
39,
54
],
"text": [
"mw, by 2030",
"mw by 2030",
"4 mw by 2030"
]
} | INDC | BIH | Renewable Energy: Solar | train | Conditional part of the mitigation target for a given sectoral target | 30983 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). | Energy | Bosnia and Herzegovina | {
"answer_start": [
23,
38,
55
],
"text": [
"mw, by 2030",
"175 mw by 2030",
"mw by 2030"
]
} | INDC | BIH | Renewable Energy: Wind | train | Targets at the sectoral level | 30984 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. to reconstruct and modernize district heating grids, boilers and district heating substations. systemic energy rehabilitation of existing buildings (focus on public sector). | Energy | Bosnia and Herzegovina | {
"answer_start": [
23,
38,
55
],
"text": [
"mw, by 2030",
"175 mw by 2030",
"mw by 2030"
]
} | INDC | BIH | Renewable Energy: Wind | test | Conditional part of the mitigation target for a given sectoral target | 30985 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | to construct co-generation plants fuelled by wood chips and wood waste from wood processing industry, with the individual power generation capacity of several MW and the total power generation capacity of 70 MW, by 2030. to replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power generation from methane from two underground mines (five coal-pits). | Energy | Bosnia and Herzegovina | {
"answer_start": [
41
],
"text": [
"replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power"
]
} | INDC | BIH | Supply-side Efficiency: Power generation efficiency improvement | train | Conditional part of mitigation target for a given sectoral downstream actions | 30986 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | to construct co-generation plants fuelled by wood chips and wood waste from wood processing industry, with the individual power generation capacity of several MW and the total power generation capacity of 70 MW, by 2030. to replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power generation from methane from two underground mines (five coal-pits). | Energy | Bosnia and Herzegovina | {
"answer_start": [
41
],
"text": [
"replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power"
]
} | INDC | BIH | Supply-side Efficiency: Power generation efficiency improvement | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 30987 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | to construct co-generation plants fuelled by wood chips and wood waste from wood processing industry, with the individual power generation capacity of several MW and the total power generation capacity of 70 MW, by 2030. to replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power generation from methane from two underground mines (five coal-pits). to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. | Energy | Bosnia and Herzegovina | {
"answer_start": [
22,
91,
117,
133
],
"text": [
"generation capacity of several mw and the total power generation capacity of 70 mw, by 2030",
"generation capacity of up to 10 mw and the total generation capacity of 120 mw, by 2030",
"generation capacity of 175 mw by 2030",
"generation capacity of 4 mw by 2030"
]
} | INDC | BIH | Supply-side Efficiency: Power generation efficiency improvement: Cogeneration plants | train | Targets at the sectoral level | 30988 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | to construct co-generation plants fuelled by wood chips and wood waste from wood processing industry, with the individual power generation capacity of several MW and the total power generation capacity of 70 MW, by 2030. to replace the existing thermal power plants with 30% average efficiency with new plants with approximately 40% average efficiency . to install the equipment for power generation from methane from two underground mines (five coal-pits). to install mini hydro power plants with the power generation capacity of up to 10 MW and the total generation capacity of 120 MW, by 2030. to install wind farms of the power generation capacity of 175 MW by 2030. to install photovoltaic modules of the total power generation capacity of 4 MW by 2030. to introduce renewable energy sources in the existing district heating systems and to construct new district heating systems fuelled by renewable energy sources. | Energy | Bosnia and Herzegovina | {
"answer_start": [
22,
91,
117,
133
],
"text": [
"generation capacity of several mw and the total power generation capacity of 70 mw, by 2030",
"generation capacity of up to 10 mw and the total generation capacity of 120 mw, by 2030",
"generation capacity of 175 mw by 2030",
"generation capacity of 4 mw by 2030"
]
} | INDC | BIH | Supply-side Efficiency: Power generation efficiency improvement: Cogeneration plants | val | Conditional part of the mitigation target for a given sectoral target | 30989 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | The option with 750 MW of substitute and new coal-fired power plants was also analysed, which implies more intensive international assistance on decarbonisation with an additional focus on assistance in fair transition of mining areas. This option implies the construction of another thermal power plant next to block 7 in the Tuzla thermal power plant. | Energy | Bosnia and Herzegovina | {
"answer_start": [
1
],
"text": [
"option with 750 mw of substitute and new coal-fired power plants was also analysed, which implies more intensive international assistance on decarbonisation with an additional focus on assistance in fair transition of mining areas. this option implies the construction of another thermal power plant next to block 7 in the tuzla thermal power plant"
]
} | Revised First NDC | BIH | Supply-side Efficiency: Power generation efficiency improvement | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 30990 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | The option with 750 MW of substitute and new coal-fired power plants was also analysed, which implies more intensive international assistance on decarbonisation with an additional focus on assistance in fair transition of mining areas. This option implies the construction of another thermal power plant next to block 7 in the Tuzla thermal power plant. | Energy | Bosnia and Herzegovina | {
"answer_start": [
1
],
"text": [
"option with 750 mw of substitute and new coal-fired power plants was also analysed, which implies more intensive international assistance on decarbonisation with an additional focus on assistance in fair transition of mining areas. this option implies the construction of another thermal power plant next to block 7 in the tuzla thermal power plant"
]
} | Revised First NDC | BIH | Supply-side Efficiency: Power generation efficiency improvement | train | Conditional part of mitigation target for a given sectoral downstream actions | 30991 |
What plans and strategies are mentioned pertaining to Energy Sector ? | Sectoral plans on | Reform of the incentive system for RES will be aimed at encouraging the decentralisation of the energy system and the implementation of community energy projects. Under the unconditional target option, the emission reduction after 2025 is milder than in the conditional target option because more power is generated in the new coal-fired power plants (1,050 MW vs. 750 MW). | Energy | Bosnia and Herzegovina | {
"answer_start": [
0,
56
],
"text": [
"reform of the incentive system for res will be aimed at encouraging the decentralisation of the energy system and the implementation of community energy projects",
"power plants"
]
} | Revised First NDC | BIH | Renewable Energy | train | Information on sectoral plans | 30992 |
What is the conditional part of mitigation target provided for the Energy Sector ? | Conditional part of mitigation target | Reform of the incentive system for RES will be aimed at encouraging the decentralisation of the energy system and the implementation of community energy projects. Under the unconditional target option, the emission reduction after 2025 is milder than in the conditional target option because more power is generated in the new coal-fired power plants (1,050 MW vs. 750 MW). | Energy | Bosnia and Herzegovina | {
"answer_start": [
0,
56
],
"text": [
"reform of the incentive system for res will be aimed at encouraging the decentralisation of the energy system and the implementation of community energy projects",
"power plants"
]
} | Revised First NDC | BIH | Renewable Energy | train | Conditional part of mitigation target for a given sectoral plan | 30993 |
What are the downstream actions that are incorporated in the Buildings Sector as part of Nationally Determined Contributions? | Downstream actions | Measures are also being implemented in other sectors, especially in the building sector: reducing the use of coal and heating oil with the implementation of energy efficiency measures to reduce heating and cooling needs, increasing the efficiency of heating and cooling systems, energy efficiency labelling and banning imports of used heating and cooling equipment, etc. Reform of the incentive system for RES will be aimed at encouraging the decentralisation of the energy system and the implementation of community energy projects. | Buildings | Bosnia and Herzegovina | {
"answer_start": [
0,
77
],
"text": [
"measures are also being implemented in other sectors, especially in the building sector: reducing the use of coal and heating oil with the implementation of energy efficiency measures to reduce heating and cooling needs, increasing the efficiency of heating and cooling systems, energy efficiency labelling and banning imports of used heating and cooling equipment, etc. reform of the incentive system",
"energy system and the implementation of community energy"
]
} | Revised First NDC | BIH | Buildings: General | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 30994 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | Measures are also being implemented in other sectors, especially in the building sector: reducing the use of coal and heating oil with the implementation of energy efficiency measures to reduce heating and cooling needs, increasing the efficiency of heating and cooling systems, energy efficiency labelling and banning imports of used heating and cooling equipment, etc. Reform of the incentive system for RES will be aimed at encouraging the decentralisation of the energy system and the implementation of community energy projects. | Energy | Bosnia and Herzegovina | {
"answer_start": [
0,
77
],
"text": [
"measures are also being implemented in other sectors, especially in the building sector: reducing the use of coal and heating oil with the implementation of energy efficiency measures to reduce heating and cooling needs, increasing the efficiency of heating and cooling systems, energy efficiency labelling and banning imports of used heating and cooling equipment, etc. reform of the incentive system",
"energy system and the implementation of community energy"
]
} | Revised First NDC | BIH | Demand-side Efficiency: Buildings | test | Sectoral downstream actions to be undertaken as part of the NDC contribution | 30995 |
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions? | Downstream actions | Measures are also being implemented in other sectors, especially in the building sector: reducing the use of coal and heating oil with the implementation of energy efficiency measures to reduce heating and cooling needs, increasing the efficiency of heating and cooling systems, energy efficiency labelling and banning imports of used heating and cooling equipment, etc. Reform of the incentive system for RES will be aimed at encouraging the decentralisation of the energy system and the implementation of community energy projects. | Energy | Bosnia and Herzegovina | {
"answer_start": [
15,
77
],
"text": [
"reducing the use of coal and heating oil with the implementation of energy efficiency measures to reduce heating and cooling needs, increasing the efficiency of heating and cooling systems, energy efficiency labelling and banning imports of used heating and cooling equipment, etc. reform of the incentive system",
"energy system and the implementation of community energy"
]
} | Revised First NDC | BIH | Clean Cooking and Heating | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 30996 |
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ? | Conditional part of mitigation target | In parallel, the resources of the mines will be gradually used for the production of RES (biomass cultivation, space for solar power plants, etc.). Measures are also being implemented in other sectors, especially in the building sector: reducing the use of coal and heating oil with the implementation of energy efficiency measures to reduce heating and cooling needs, increasing the efficiency of heating and cooling systems, energy efficiency labelling and banning imports of used heating and cooling equipment, etc. | Energy | Bosnia and Herzegovina | {
"answer_start": [
27,
46
],
"text": [
"etc.). measures",
"reducing the use of coal and heating oil with the implementation of energy efficiency measures to reduce heating and cooling needs, increasing the efficiency of heating and cooling systems, energy efficiency labelling and banning imports of used heating and cooling equipment, etc"
]
} | Revised First NDC | BIH | Clean Cooking and Heating | train | Conditional part of mitigation target for a given sectoral downstream actions | 30997 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | The INDC. Unconditional: The FSM commits to unconditionally reduce by 2025 a 28% its GHGs emissions below emissions in year 2000. Conditional: Similarly, subject to the availability of additional financial, technical and capacity building support from the international community, the FSM could do by 2025 an additional reduction up to 35% below emissions in the 2000 base year. | Energy | Federated States of Micronesia | {
"answer_start": [
12,
61
],
"text": [
"2025 a 28% its ghgs emissions below emissions in year 2000",
"emissions in the 2000"
]
} | First NDC | FSM | Energy: General | train | Targets at the sectoral level | 30998 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | Conditional: Similarly, subject to the availability of additional financial, technical and capacity building support from the international community, the FSM could do by 2025 an additional reduction up to 35% below emissions in the 2000 base year. Information to facilitate clarity, transparency and understanding. Type: Sectoral Targets. | Energy | Federated States of Micronesia | {
"answer_start": [
9
],
"text": [
"additional financial, technical and capacity building support from the international"
]
} | First NDC | FSM | Energy: General | test | Conditional part of the mitigation target for a given sectoral target | 30999 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | The INDC. Unconditional: The FSM commits to unconditionally reduce by 2025 a 28% its GHGs emissions below emissions in year 2000. Conditional: Similarly, subject to the availability of additional financial, technical and capacity building support from the international community, the FSM could do by 2025 an additional reduction up to 35% below emissions in the 2000 base year. | Energy | Federated States of Micronesia | {
"answer_start": [
12,
61
],
"text": [
"2025 a 28% its ghgs emissions below emissions in year 2000",
"emissions in the 2000"
]
} | INDC | FSM | Energy: General | test | Targets at the sectoral level | 31000 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | Conditional: Similarly, subject to the availability of additional financial, technical and capacity building support from the international community, the FSM could do by 2025 an additional reduction up to 35% below emissions in the 2000 base year. Information to facilitate clarity, transparency and understanding. Type: Sectoral Targets. | Energy | Federated States of Micronesia | {
"answer_start": [
9
],
"text": [
"additional financial, technical and capacity building support from the international"
]
} | INDC | FSM | Energy: General | train | Conditional part of the mitigation target for a given sectoral target | 31001 |
What upstream policies and strategies are mentioned in Energy Sector ? | Upstream policies on | The current methodologies under approval within the MRV system framework are:. Monitoring fuel consumption and emission reductions in power generation. Monitoring energy efficiency and electricity consumption. Monitoring energy efficiency in buildings. Monitoring grant programs and support for energy efficiency and reduction of greenhouse gas emissions projects. | Energy | Israel | {
"answer_start": [
24,
42
],
"text": [
"energy efficiency and electricity consumption. monitoring energy efficiency",
"energy efficiency and reduction of greenhouse gas emissions projects"
]
} | First NDC | ISR | Energy Efficiency | train | Information on upstream policies for a given sector | 31002 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | The current methodologies under approval within the MRV system framework are:. Monitoring fuel consumption and emission reductions in power generation. Monitoring energy efficiency and electricity consumption. Monitoring energy efficiency in buildings. Monitoring grant programs and support for energy efficiency and reduction of greenhouse gas emissions projects. | Energy | Israel | {
"answer_start": [
27
],
"text": [
"electricity consumption"
]
} | First NDC | ISR | Energy Efficiency | train | Targets at the sectoral level | 31003 |
What plans and strategies are mentioned pertaining to Energy Sector ? | Sectoral plans on | Module 1-Energy: In principle, Tier 1 was applied, with notable exceptions being the application of Tier 2 using information that is unique to Israel such as calorific values of primary energy sources (coal, natural gas, shale oil). Tier 3 was applied for emissions of SOx, NOx, and CO from vehicles, as well as emissions of SOx and NOx from electricity generation. | Energy | Israel | {
"answer_start": [
38
],
"text": [
"coal, natural gas"
]
} | First NDC | ISR | Gas | train | Information on sectoral plans | 31004 |
What upstream policies and strategies are mentioned in Energy Sector ? | Upstream policies on | Reduction of greenhouse gas emissions from electricity generation by 2050 by at least 85% compared to emissions measured in 2015. Energy Intensity. To set a new energy intensity target so that by 2030 the energy intensity of GDP will be 122 MWh per NIS 1 million. Industry. | Energy | Israel | {
"answer_start": [
22
],
"text": [
"energy intensity. to set a new energy"
]
} | First NDC | ISR | Renewable Energy | test | Information on upstream policies for a given sector | 31005 |
What upstream policies and strategies are mentioned in Energy Sector ? | Upstream policies on | It is anticipated that the implementation plan will consist of, inter alia, the following:. The establishment of mechanisms leveraging large scale private funding together with public funding of energy efficiency projects;. A program of tenders for renewable energy. | Energy | Israel | {
"answer_start": [
21
],
"text": [
"mechanisms leveraging large scale private funding together with public funding of energy efficiency projects"
]
} | First NDC | ISR | Energy Efficiency | train | Information on upstream policies for a given sector | 31006 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | Energy efficiency - 17% reduction in electricity consumption relative to BAU scenario in 2030. Renewable energy - 17% of the electricity generated in 2030 will be from renewable sources. Public transport - 20% shift from private to public transportation. Future development. | Energy | Israel | {
"answer_start": [
7,
23
],
"text": [
"electricity consumption relative to bau scenario in 2030",
"electricity generated in 2030"
]
} | First NDC | ISR | Energy Efficiency | test | Targets at the sectoral level | 31007 |
What plans and strategies are mentioned pertaining to Energy Sector ? | Sectoral plans on | The 17% renewable energy target is substantially more ambitious than Israel’s current 10% target for 2020;. Removal of barriers for the uptake of renewable energy;. Measures to increase the use of natural gas. The recent discovery of additional natural gas reserves off the coast of Israel has and will continue to contribute to a partial switch from coal to natural gas in Israel’s fuel mix and which contributed to GHG emissions reduction between 2012 and 2015. | Energy | Israel | {
"answer_start": [
34,
65
],
"text": [
"increase the use of natural gas. the recent discovery of additional natural gas",
"coal to natural gas"
]
} | First NDC | ISR | Gas | train | Information on sectoral plans | 31008 |
What upstream policies and strategies are mentioned in Energy Sector ? | Upstream policies on | The 17% renewable energy target is substantially more ambitious than Israel’s current 10% target for 2020;. Removal of barriers for the uptake of renewable energy;. Measures to increase the use of natural gas. | Energy | Israel | {
"answer_start": [
21
],
"text": [
"removal of barriers for the uptake of renewable energy"
]
} | First NDC | ISR | Renewable Energy | train | Information on upstream policies for a given sector | 31009 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | Energy efficiency - 17% reduction in electricity consumption relative to BAU scenario in 2030. Renewable energy - 17% of the electricity generated in 2030 will be from renewable sources. Public transport - 20% shift from private to public transportation. Future development. | Energy | Israel | {
"answer_start": [
3
],
"text": [
"17% reduction in electricity consumption relative to bau scenario in 2030. renewable energy - 17% of the electricity generated in 2030 will be from renewable"
]
} | First NDC | ISR | Renewable Energy | train | Targets at the sectoral level | 31010 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | Submitted jointly to the government by the Ministers of Environmental Protection, Finance and National Infrastructures, Energy and Water Resources the target was approved and includes sector specific targets:. Energy efficiency - 17% reduction in electricity consumption relative to BAU scenario in 2030. Renewable energy - 17% of the electricity generated in 2030 will be from renewable sources. | Energy | Israel | {
"answer_start": [
35
],
"text": [
"17% reduction in electricity consumption relative to bau scenario in 2030. renewable energy - 17% of the electricity generated in 2030"
]
} | First NDC | ISR | Renewable Energy | train | Conditional part of the mitigation target for a given sectoral target | 31011 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Transport Sector ? | Sectoral targets on | Energy efficiency - 17% reduction in electricity consumption relative to BAU scenario in 2030. Renewable energy - 17% of the electricity generated in 2030 will be from renewable sources. Public transport - 20% shift from private to public transportation. Future development. | Transport | Israel | {
"answer_start": [
33
],
"text": [
"public transport - 20% shift from private to public"
]
} | First NDC | ISR | Public Transport | train | Targets at the sectoral level | 31012 |
What is the conditional part of mitigation target provided for targets/objectives in the Transport Sector ? | Conditional part of mitigation target | Energy efficiency - 17% reduction in electricity consumption relative to BAU scenario in 2030. Renewable energy - 17% of the electricity generated in 2030 will be from renewable sources. Public transport - 20% shift from private to public transportation. Future development. | Transport | Israel | {
"answer_start": [
33
],
"text": [
"public transport - 20% shift from private to public"
]
} | First NDC | ISR | Public Transport | train | Conditional part of the mitigation target for a given sectoral target | 31013 |
What are the downstream actions that are incorporated in the Transport Sector as part of Nationally Determined Contributions? | Downstream actions | Further development of public transport systems in major metropolitan areas such as the construction of the Tel Aviv metropolitan light rail; the extension of the intercity rail system and of the Jerusalem light rail. Initial steps have begun for the establishment of a national system for managing and monitoring greenhouse gas emissions. | Transport | Israel | {
"answer_start": [
5
],
"text": [
"systems in major metropolitan areas such as the construction of the tel aviv metropolitan light rail; the extension of the intercity rail system and of the jerusalem light rail"
]
} | First NDC | ISR | Rail | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 31014 |
What upstream policies and strategies are mentioned in Energy Sector ? | Upstream policies on | It is anticipated that the implementation plan will consist of, inter alia, the following:. The establishment of mechanisms leveraging large scale private funding together with public funding of energy efficiency projects;. A program of tenders for renewable energy. | Energy | Israel | {
"answer_start": [
21
],
"text": [
"mechanisms leveraging large scale private funding together with public funding of energy efficiency projects"
]
} | INDC | ISR | Energy Efficiency | train | Information on upstream policies for a given sector | 31015 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | Energy efficiency - 17% reduction in electricity consumption relative to BAU scenario in 2030. Renewable energy - 17% of the electricity generated in 2030 will be from renewable sources. Public transport - 20% shift from private to public transportation. Future development. | Energy | Israel | {
"answer_start": [
7,
23
],
"text": [
"electricity consumption relative to bau scenario in 2030",
"electricity generated in 2030"
]
} | INDC | ISR | Energy Efficiency | train | Targets at the sectoral level | 31016 |
What plans and strategies are mentioned pertaining to Energy Sector ? | Sectoral plans on | The 17% renewable energy target is substantially more ambitious than Israel’s current 10% target for 2020;. Removal of barriers for the uptake of renewable energy;. Measures to increase the use of natural gas. The recent discovery of additional natural gas reserves off the coast of Israel has and will continue to contribute to a partial switch from coal to natural gas in Israel’s fuel mix and which contributed to GHG emissions reduction between 2012 and 2015. | Energy | Israel | {
"answer_start": [
34,
65
],
"text": [
"increase the use of natural gas. the recent discovery of additional natural gas",
"coal to natural gas"
]
} | INDC | ISR | Gas | val | Information on sectoral plans | 31017 |
What upstream policies and strategies are mentioned in Energy Sector ? | Upstream policies on | The 17% renewable energy target is substantially more ambitious than Israel’s current 10% target for 2020;. Removal of barriers for the uptake of renewable energy;. Measures to increase the use of natural gas. | Energy | Israel | {
"answer_start": [
21
],
"text": [
"removal of barriers for the uptake of renewable energy"
]
} | INDC | ISR | Renewable Energy | train | Information on upstream policies for a given sector | 31018 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | Energy efficiency - 17% reduction in electricity consumption relative to BAU scenario in 2030. Renewable energy - 17% of the electricity generated in 2030 will be from renewable sources. Public transport - 20% shift from private to public transportation. Future development. | Energy | Israel | {
"answer_start": [
3
],
"text": [
"17% reduction in electricity consumption relative to bau scenario in 2030. renewable energy - 17% of the electricity generated in 2030 will be from renewable"
]
} | INDC | ISR | Renewable Energy | train | Targets at the sectoral level | 31019 |
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ? | Conditional part of mitigation target | Submitted jointly to the government by the Ministers of Environmental Protection, Finance and National Infrastructures, Energy and Water Resources the target was approved and includes sector specific targets:. Energy efficiency - 17% reduction in electricity consumption relative to BAU scenario in 2030. Renewable energy - 17% of the electricity generated in 2030 will be from renewable sources. | Energy | Israel | {
"answer_start": [
35
],
"text": [
"17% reduction in electricity consumption relative to bau scenario in 2030. renewable energy - 17% of the electricity generated in 2030"
]
} | INDC | ISR | Renewable Energy | val | Conditional part of the mitigation target for a given sectoral target | 31020 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Transport Sector ? | Sectoral targets on | Energy efficiency - 17% reduction in electricity consumption relative to BAU scenario in 2030. Renewable energy - 17% of the electricity generated in 2030 will be from renewable sources. Public transport - 20% shift from private to public transportation. Future development. | Transport | Israel | {
"answer_start": [
33
],
"text": [
"public transport - 20% shift from private to public"
]
} | INDC | ISR | Public Transport | train | Targets at the sectoral level | 31021 |
What is the conditional part of mitigation target provided for targets/objectives in the Transport Sector ? | Conditional part of mitigation target | Energy efficiency - 17% reduction in electricity consumption relative to BAU scenario in 2030. Renewable energy - 17% of the electricity generated in 2030 will be from renewable sources. Public transport - 20% shift from private to public transportation. Future development. | Transport | Israel | {
"answer_start": [
33
],
"text": [
"public transport - 20% shift from private to public"
]
} | INDC | ISR | Public Transport | train | Conditional part of the mitigation target for a given sectoral target | 31022 |
What are the downstream actions that are incorporated in the Transport Sector as part of Nationally Determined Contributions? | Downstream actions | Further development of public transport systems in major metropolitan areas such as the construction of the Tel Aviv metropolitan light rail; the extension of the intercity rail system and of the Jerusalem light rail. Initial steps have begun for the establishment of a national system for managing and monitoring greenhouse gas emissions. | Transport | Israel | {
"answer_start": [
5
],
"text": [
"systems in major metropolitan areas such as the construction of the tel aviv metropolitan light rail; the extension of the intercity rail system and of the jerusalem light rail"
]
} | INDC | ISR | Rail | train | Sectoral downstream actions to be undertaken as part of the NDC contribution | 31023 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Transport Sector ? | Sectoral targets on | Therefore the 2050 target of 85% GHG emissions reduction will be periodically revisited. The following sectoral targets were set:. Transport. As of 2026, all new municipal buses purchased will be clean vehicles as defined in section 77A of the Transport Ordinance [New Version]. | Transport | Israel | {
"answer_start": [
23
],
"text": [
"transport. as of 2026, all new municipal buses purchased will be clean vehicles as defined in section 77a of the transport ordinance [new version"
]
} | Revised First NDC | ISR | Vehicle Fleet | val | Targets at the sectoral level | 31024 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Transport Sector ? | Sectoral targets on | Limit the amount of greenhouse gas emissions from new vehicles, weighing up to 3.5 tonnes, registered from 2030, to an amount equal to 5% of the average greenhouse gas emissions for a new vehicle, weighing up to 3.5 tonnes, registered in 2020. This target will be reexamined in 2025, and will be updated as necessary, having regard to technological developments, the extent of the penetration of electric vehicles in Israel and globally, electricity infrastructure and the deployment of charging stations in Israel. | Transport | Israel | {
"answer_start": [
4
],
"text": [
"greenhouse gas emissions from new vehicles, weighing up to 3.5 tonnes, registered from 2030, to an amount equal to 5% of the average greenhouse gas emissions for a new vehicle, weighing up to 3.5 tonnes, registered in 2020. this target will be reexamined in 2025, and will be updated as necessary, having regard to technological developments, the extent of the penetration of electric vehicles in israel and globally, electricity infrastructure and the deployment of charging stations in israel"
]
} | Revised First NDC | ISR | Transport: General | train | Targets at the sectoral level | 31025 |
What plans and strategies are mentioned pertaining to Waste Sector ? | Sectoral plans on | National Waste Strategy: In February 2021, the Ministry of Environmental Protection published a new National Strategy for a Circular Economy in 2050 and a Sustainable Waste Sector in 2030. The strategy addresses treatment of Municipal Solid Waste (MSW) in a comprehensive manner and includes the following key abatement measures in relation to sources of GHG emissions. | Waste | Israel | {
"answer_start": [
0
],
"text": [
"national waste strategy: in february 2021, the ministry of environmental protection published a new national strategy for a circular economy in 2050 and a sustainable waste sector in 2030. the strategy addresses treatment of municipal solid waste (msw) in a comprehensive manner and includes the following key abatement measures in relation to sources of ghg emissions"
]
} | Revised First NDC | ISR | Waste: General | train | Information on sectoral plans | 31026 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Waste Sector ? | Sectoral targets on | Reduction of greenhouse gas emissions from solid waste by 2030 by at least 47% compared to emissions measured in 2015, which were 5.5MtCO2e. A 71% reduction in the amount of municipal waste landfilled by 2030 compared to the amount of municipal waste landfilled in 2018, which was about 4.5 million tonnes. | Waste | Israel | {
"answer_start": [
0
],
"text": [
"reduction of greenhouse gas emissions from solid waste by 2030 by at least 47% compared to emissions measured in 2015, which were 5.5mtco2e. a 71% reduction in the amount of municipal waste landfilled by 2030 compared to the amount of municipal waste landfilled in 2018, which was about 4.5 million tonnes"
]
} | Revised First NDC | ISR | Waste: General | test | Targets at the sectoral level | 31027 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Waste Sector ? | Sectoral targets on | Transition from 80% of waste landfilling in 2020, to only 20% by 2030;. Zero landfilling of untreated organic waste and paper and cardboard by 2030;. All active landfills will be sealed, and methane collection and destruction/utilization systems will be installed, so that methane collection will amount to no less than 50% of total methane production in the landfill. | Waste | Israel | {
"answer_start": [
0
],
"text": [
"transition from 80% of waste landfilling in 2020, to only 20% by 2030;. zero landfilling of untreated organic waste and paper and cardboard by 2030;. all active landfills will be sealed, and methane collection and destruction/utilization systems will be installed, so that methane collection will amount to no less than 50% of total methane production in the landfill"
]
} | Revised First NDC | ISR | Solid Waste | train | Targets at the sectoral level | 31028 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | Reduction of greenhouse gas emissions from electricity generation by 2030 by 30% compared to emissions measured in 2015, which were 37.6 MtCO2e, taking into account the renewable energy targets set in Government Decision No. 465 (see below). | Energy | Israel | {
"answer_start": [
2
],
"text": [
"greenhouse gas emissions from electricity generation by 2030 by 30% compared to emissions measured in 2015, which were 37.6 mtco2e, taking into account the renewable energy targets set in government decision no. 465"
]
} | Revised First NDC | ISR | Energy: General | train | Targets at the sectoral level | 31029 |
What plans and strategies are mentioned pertaining to Industries Sector ? | Sectoral plans on | To establish a voluntary mechanism for reporting and publicizing information on the GHG emissions associated with products and services manufactured in and imported to Israel. Mid-century, long-term low greenhouse gas emission development strategies. | Industries | Israel | {
"answer_start": [
1
],
"text": [
"establish a voluntary mechanism for reporting and publicizing information on the ghg emissions associated with products and services manufactured in and imported to israel"
]
} | Revised First NDC | ISR | Industries: General | train | Information on sectoral plans | 31030 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Industries Sector ? | Sectoral targets on | Reduction of greenhouse gas emissions from industry by 2030 by at least 30% relative to emissions in 2015, which were 12 MtCO2e. Reduction of industrial greenhouse gas emissions by 2050 by at least 56% relative to emissions in 2015. Climate Impacts of Goods and Services. | Industries | Israel | {
"answer_start": [
0
],
"text": [
"reduction of greenhouse gas emissions from industry by 2030 by at least 30% relative to emissions in 2015, which were 12 mtco2e. reduction of industrial greenhouse gas emissions by 2050 by at least 56% relative to emissions in 2015"
]
} | Revised First NDC | ISR | Industries: General | test | Targets at the sectoral level | 31031 |
What plans and strategies are mentioned pertaining to Industries Sector ? | Sectoral plans on | In November 2020, the Internal Affairs and Environment Committee of the Knesset amended the Hazardous Materials Regulations to set quotas on the import of HFC refrigerant gases, in line with Israel’s targets under the Kigali Amendment, to take effect in July 2022. National Waste Strategy: In February 2021, the Ministry of Environmental Protection published a new National Strategy for a Circular Economy in 2050 and a Sustainable Waste Sector in 2030. | Industries | Israel | {
"answer_start": [
1
],
"text": [
"november 2020, the internal affairs and environment committee of the knesset amended the hazardous materials regulations to set quotas on the import of hfc refrigerant gases, in line with israel’s targets under the kigali amendment, to take effect in july 2022"
]
} | Revised First NDC | ISR | HFCs | train | Information on sectoral plans | 31032 |
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ? | Sectoral targets on | Israel has further committed to a complete phase out of coal-fired power generation by 2026, and to increase the share of renewable power generation to 20% in 2025 and 30% in 2030. (e). Information on sources of data used in quantifying the reference point(s);. | Energy | Israel | {
"answer_start": [
0
],
"text": [
"israel has further committed to a complete phase out of coal-fired power generation by 2026, and to increase the share of renewable power generation to 20% in 2025 and 30% in 2030"
]
} | Revised First NDC | ISR | Supply-side Efficiency | train | Targets at the sectoral level | 31033 |
What plans and strategies are mentioned pertaining to Buildings Sector ? | Sectoral plans on | Furthermore, Japan will continue strenuous efforts in its challenge to meet the lofty goal of cutting its emissions by 50 percent. In order to create a virtuous cycle of the economy and the environment and to realize robust growth toward its ambitious goal for fiscal year 2030, Japan will put forward all possible efforts in all areas including by thorough energy efficiency measures, maximum introduction of renewable energy, as well as decarbonization of public sectors and local communities. | Buildings | Japan | {
"answer_start": [
63
],
"text": [
"energy efficiency measures, maximum introduction of renewable energy"
]
} | First NDC | JPN | Buildings: General | train | Information on sectoral plans | 31034 |
What plans and strategies are mentioned pertaining to Economy-wide Sector ? | Sectoral plans on | At the joint meetings of the Mid- and Long-Term Climate Change Countermeasures Subcommittee of the Global Environment Committee under the Central Environment Council and the Working Group for Consideration of Global Warming Countermeasures of the Global. Environment Subcommittee of the Committee on industrial Science and Technology Policy and Environment under the Industrial Structural Council, the examination was conducted on the Plan for Global Warming Countermeasures, a comprehensive plan for the implementation of Japan’s emissions reduction goal for the year 2030, in a transparent manner to the public, while holding hearing from future generations and relevant ministries and agencies. | Economy-wide | Japan | {
"answer_start": [
13,
32,
64
],
"text": [
"countermeasures subcommittee of the global",
"global warming countermeasures of the global",
"plan for global warming countermeasures, a comprehensive plan"
]
} | First NDC | JPN | Economy-wide: General | train | Information on sectoral plans | 31035 |
What plans and strategies are mentioned pertaining to Energy Sector ? | Sectoral plans on | Furthermore, Japan will continue strenuous efforts in its challenge to meet the lofty goal of cutting its emissions by 50 percent. In order to create a virtuous cycle of the economy and the environment and to realize robust growth toward its ambitious goal for fiscal year 2030, Japan will put forward all possible efforts in all areas including by thorough energy efficiency measures, maximum introduction of renewable energy, as well as decarbonization of public sectors and local communities. | Energy | Japan | {
"answer_start": [
55
],
"text": [
"possible efforts in all areas including by thorough energy efficiency measures, maximum introduction of renewable energy"
]
} | First NDC | JPN | Renewable Energy | train | Information on sectoral plans | 31036 |