example_id
stringlengths
36
204
content
stringlengths
32
568
metadata
stringlengths
29
67
tagged_sentence
stringlengths
50
586
relation_type
stringclasses
10 values
525aa713-65e1-4368-a6f4-38f628be7fed
in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.
{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'}
in clothes shops, the dimensions and <e1>fittings</e1> recommended for an individual changing cubicle in a sports <e2>building</e2> should be provided.
necessity
d3fc8c9b-c23a-4188-8723-369caa90453c
The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.
{'ID': '124_Finnish_EnergyEfficiency'}
The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most <e1>50</e1> of the building's <e2>facade area</e2>.
part-of
fb1da22f-8ddb-4399-b441-64dca68da9af
If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.
{'ID': '218_Finnish_FireSafety'}
If a <e1>lift</e1> or other device for moving between levels is installed in the <e2>exit</e2> of an existing building, the dwellings exit may be no less than 850 millimetres wide.
part-of
37239af2-8f49-499f-ab25-73f92d7c9369
Each letter should be 25mm high.
{'ID': '117_UK_DocS_InfrastructureForChargingOfElectricalVehicles'}
<e1>Each</e1> <e2>letter</e2> should be 25mm high.
selection
09b2a395-5293-4b7d-82d4-5312482d59e9
Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.
{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'}
Door entry controls, where provided, are mounted <e1>900-1000mm</e1> above finished ground level, and at least 300mm <e2>away</e2> from any projecting corner.
none
48133b44-eac2-44e2-b2df-c52243e9f7ea
NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.
{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'}
NOTE: For example, if the total <e1>system output</e1> is made up of three equally sized boilers, at 15% of <e2>system output</e2> the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.
none
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f
Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.
{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'}
Where the work concerns a <e1>building</e1> containing more than one <e2>dwelling</e2>, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.
part-of
d48274a1-bd70-4db9-8490-14075029cbb7
All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.
{'ID': '109_UK_DocM_V2_AccessAndUseOfBuildings'}
<e1>All</e1> <e2>users</e2> including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.
selection
656aa2fa-18cb-41ee-ae28-28deb3dffcc3
The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.
{'ID': '61_Finnish_Health-WaterAndSewerage'}
The <e1>water temperature</e1> of the water in the hot water system shall be at least <e2>55 degrees Celsius</e2> and available from the hot water plumbing fixture within 20 seconds.
greater-equal
f27c9fb4-dc28-494c-a277-a51360cdfdb8
A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.
{'ID': '57_Finnish_SafetyOfUse'}
A <e1>handrail</e1> and its ending must be shaped safely and must <e2>continue past the start and end points of the structure</e2>.
necessity
01008f69-874b-443e-bcb2-2f5630280049
If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.
{'ID': '24_Finnish_SafetyOfUse'}
If <e1>stairs</e1> are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the <e2>tread</e2> must be no less than 220 millimetres.
part-of
a2f3a871-91d5-4777-95c9-4744792b3a69
in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.
{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'}
in an existing building, for the principal or main staff <e1>entrance</e1> or entrances to be <e2>accessible</e2>, an alternative accessible entrance should be provided.
selection
3d0bbf85-327f-4f92-a468-201f81080779
The roof insulation should be installed when the eaves are still accessible.
{'ID': '169_UK_DocL_V1_ConsrvationOfFuelAndPower'}
The <e1>roof</e1> <e2>insulation</e2> should be installed when the eaves are still accessible.
part-of
1913381b-a2cc-496e-9168-82ccf2a01d50
In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.
{'ID': '67_Finnish_Health-WaterAndSewerage'}
In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the <e1>heat emission capacity</e1> of the <e2>heat emitters</e2> to be installed does not exceed 200 Watts per room.
part-of
a538fc03-db66-4b31-b40f-e41754522010
The three-part form should be completed for each installation address.
{'ID': '264_UK_DocF_V1_Ventilation'}
The <e1>three-part</e1> <e2>form</e2> should be completed for each installation address.
selection
b63dcef6-1840-4e9e-ad51-f8fc481fe856
The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.
{'ID': '36_UK_DocA_Structure'}
The <e1>wall ties</e1> should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the <e2>number of wall ties per square metre</e2> is not less than 2.5 ties/m2.
none
8e9ef8dc-18bd-4877-98cd-556aa4adee8f
Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.
{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'}
Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) <e1>limiting heat gains and losses</e1> (i) through thermal elements and other parts of the building fabric; and (ii) <e2>from pipes, ducts and vessels used for space heating, space cooling and hot water services</e2>; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.
selection
41d06a37-5039-4dc0-aae1-0fe3abbd84fc
The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.
{'ID': '132_UK_DocL_V1_ConsrvationOfFuelAndPower'}
The <e1>building fabric</e1> should be <e2>constructed</e2> so that the insulation is reasonably continuous across newly built elements.
necessity
9f5fe460-cae1-4653-a951-38e31f3ed15d
Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.
{'ID': '81_Finnish_SafetyOfUse'}
Any <e1>restrictors</e1> placed on <e2>windows</e2> used as emergency exits must, however, be easily releasable by an adult.
part-of
fab95d95-4789-4384-8d57-a575190f9e73
The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.
{'ID': '297_UK_DocL_V1_ConsrvationOfFuelAndPower'}
The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a <e1>regular</e1> <e2>boiler</e2> using the same fuel as the microCHP.
selection
7323113d-fcd0-4e19-a24a-c6171ec8c2b7
District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling.
{'ID': '295_UK_DocL_V1_ConsrvationOfFuelAndPower'}
<e1>District heat networks</e1> and <e2>community heating systems</e2> should be designed to accommodate heat meter(s) for each dwelling.
none
85745724-aa09-4cdd-ad17-3c50ea2b99a1
Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.
{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'}
Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the <e1>clear zone</e1> beneath basins, services and pedestals is <e2>maximised to enable wheelchair users to approach</e2>.
necessity
8364a5f1-f80e-484c-9f38-bffc6f4c1876
Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).
{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'}
Where communal <e1>parking</e1> is provided to <e2>blocks of flats</e2>, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).
part-of
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab
If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.
{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'}
If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major <e1>renovation</e1> (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds <e2>7%</e2> of the total cost of the major renovation.
none
a477ee34-044e-443b-a95f-fbb1da913c38
Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.
{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'}
Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible <e1>accommodation</e1> in separate-sex toilet <e2>washrooms</e2>, wheelchair-accessible unisex toileting facilities and baby changing facilities.
part-of
32f91d86-2cbf-4d57-ab93-5a28fd804df8
Signs indicating the location of a lifting device accessible by mobility-impaired people should be clearly visible from the building entrance.
{'ID': '104_UK_DocM_V2_AccessAndUseOfBuildings'}
<e1>Signs</e1> indicating the location of a lifting device accessible by mobility-impaired people should be <e2>clearly visible from the building entrance</e2>.
necessity
2b60007d-59a3-4a18-a184-89e76ee17454
Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.
{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'}
Masonry construction: external or cavity wall <e1>insulation</e1> should <e2>extend below the damp-proof course</e2> (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.
necessity
984c252b-74f4-4d85-9080-1c8ae1851eca
If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.
{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'}
If performance requires thicker glass to be used, an equivalent window unit with <e1>standard thickness</e1> (6mm) <e2>glazing</e2> should be shown to meet the required standard.
part-of
419892bb-5044-4c63-a8ba-7747ad52c23d
When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.
{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'}
When installing <e1>windows</e1>, <e2>roof windows</e2>, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.
none
31d635b2-1d32-49dd-a848-5b5acaf50128
For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.
{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'}
For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the <e1>energy performance</e1> of the whole <e2>system</e2> should be assessed.
part-of
ad30824c-74be-4f4f-916a-dfe1e0a89205
It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.
{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'}
It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an <e1>appropriate</e1> effective <e2>clear width</e2> for an entrance door.
selection
ded852b5-c826-4649-8ce5-dece0eba6061
During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.
{'ID': '32_Finnish_Health-IndoorClimateAndVentilation'}
<e1>During the design period of occupancy</e1>, a building's room temperature shall be <e2>comfortable</e2> and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.
none
fa90c179-d32c-412b-a7d6-a515cc91dbdb
The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.
{'ID': '86_Finnish_Health-Humidity'}
The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed <e1>water removal system</e1> <e2>allowing the cellar wall to dry in an outward direction</e2> must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.
selection
86350df0-a40e-412b-a301-004524d56736
For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.
{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'}
For wet <e1>heating systems</e1> in new <e2>dwellings</e2> with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.
part-of
bd670961-83e8-410a-85a4-578f2d00c626
In all cases, roof insulation should be continuous with wall insulation.
{'ID': '168_UK_DocL_V1_ConsrvationOfFuelAndPower'}
In all cases, <e1>roof</e1> <e2>insulation</e2> should be continuous with wall insulation.
part-of
783c19fa-0ef2-466f-b3e9-d4690e34ac5f
Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.
{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'}
Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the <e1>system</e1> and its <e2>electrical output</e2> are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.
part-of
23db27ac-b594-4b26-883d-922d713d382a
When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.
{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'}
When installing or renovating thermal elements, the element being installed should be <e1>draught-proofed</e1> and <e2>airleakage gaps</e2> should be filled.
none
e1f1aeb9-7453-4b6b-b3f1-6049d711868a
The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.
{'ID': '156_Finnish_FireSafety'}
The fire performance of the external <e1>wall structure</e1> of a building no more than 56 metres in height may also be <e2>demonstrated by a fullscale test</e2>.
none
bf798097-bb99-42d0-a73f-8cebab8fbeb8
In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.
{'ID': '21_Finnish_SafetyOfUse'}
In the <e1>entrance halls</e1> and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the <e2>steps</e2> must be no more than 160 millimetres and the tread must be no less than 300 millimetres.
part-of
db734798-9e42-4fe1-900c-77d4e6131809
The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.
{'ID': '11_UK_DocQ_Security_Dwellings'}
The main doors for entering a dwelling (usually the front door) should have a door viewer unless other <e1>means</e1> <e2>exist to see callers</e2>, such as clear glass within the door or a window next to the doorset.
selection
4a82f789-a98a-4379-9b81-2a20cfba6c87
If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.
{'ID': '179_Finnish_StabilityOfStructures'}
If the internal <e1>ties</e1> must be <e2>centred on the supporting line</e2>, the minimum value of the tie force, 70 kN, will also be applied to internal ties.
necessity
eefe1191-2903-4fb8-9138-6471e09fb67d
The internal temperature exceeds 23C at 11pm.
{'ID': '53_UK_DocO_Overheating'}
The <e1>internal temperature</e1> exceeds 23C at <e2>11pm</e2>.
selection
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610
The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.
{'ID': '33_UK_DocQ_Security_Dwellings'}
The smaller dimension of each panel which can be either the <e1>width</e1> or height of the <e2>panel</e2> should be 230mm or less.
part-of
56166e36-b14b-4632-9767-70b71d335d9c
When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.
{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'}
When a dwelling undergoes a major renovation, the <e1>technical</e1>, environmental and economic <e2>feasibility of installing high-efficiency alternative systems</e2> should be considered.
selection
164122ed-c7ac-4cf8-8a54-3d56c144f78d
In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.
{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'}
In general, the findings indicate that there should be at least the <e1>same</e1> <e2>number</e2> of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.
selection
043258d7-d35e-42d9-87c5-b83565c39ad6
Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.
{'ID': '133_UK_DocL_V1_ConsrvationOfFuelAndPower'}
Before elements are concealed by subsequent work, an onsite <e1>audit</e1> should be <e2>undertaken to confirm that the designed details have been constructed</e2>.
necessity
f9de28ac-45bb-4400-9d9f-8afee73bd2e3
The number of appliances should not exceed one per 100m2 of dwelling floor area.
{'ID': '273_UK_DocL_V1_ConsrvationOfFuelAndPower'}
The <e1>number of appliances</e1> should not exceed <e2>one per 100m2</e2> of dwelling floor area.
less-equal
a9c88566-e4e5-4cba-8165-9916820d9cc5
Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.
{'ID': '75_Finnish_SafetyOfUse'}
Doors, <e1>gates</e1> and boom barriers must operate safely and in such a way that they do <e2>not cause a danger of an accident</e2>.
none
23db27ac-b594-4b26-883d-922d713d382a
When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.
{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'}
When installing or renovating thermal elements, the <e1>element</e1> <e2>being installed</e2> should be draught-proofed and airleakage gaps should be filled.
selection
8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2
When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.
{'ID': '111_Finnish_EnergyEfficiency'}
When calculating the energy consumption of a buildings cooling system, the <e1>energy consumption</e1> of cooling energy production and the electrical energy consumption of auxiliary units shall be <e2>taken into account where the use of the systems is required for indoor temperature control</e2>.
necessity
17fba530-c42b-4eeb-85dd-16da0bacc49c
Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.
{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'}
<e1>Areas</e1> that are not enclosed, such as open floors, <e2>covered ways</e2> and balconies, should be excluded.
selection
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb
There should be a supply rate, in the absence of tobacco smoke or other excessive pollutants, of 10 litres per second per person.
{'ID': '114_UK_DocF_V2_Ventilation'}
There should be a <e1>supply rate</e1>, <e2>in the absence of tobacco smoke or other excessive pollutants</e2>, of 10 litres per second per person.
necessity
bfe386ee-8c0b-41d4-9967-6e873edf7229
Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.
{'ID': '148_UK_DocL_V1_ConsrvationOfFuelAndPower'}
<e1>Floors</e1> and foundations: insulation should be installed tight to the structure, <e2>without air gaps between insulation panels and at edges</e2>.
none
1ebce0c9-705c-47ee-8429-e83cfbed72db
All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.
{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'}
All walls, ducts and <e1>boxings</e1> to every WC/cloakroom, bath and <e2>shower room</e2> are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.
part-of
2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93
Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.
{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'}
Any walls, doors and <e1>windows</e1> should be insulated and <e2>draught-proofed</e2> to at least the same extent as in the existing building.
necessity
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a
The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.
{'ID': '99_Finnish_SafetyOfUse'}
The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the <e1>area</e1> is <e2>protected so as to prevent the danger of collision</e2>.
selection
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0
The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.
{'ID': '40_Finnish_Health-Humidity'}
The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the <e1>ventilation space or gap</e1> is <e2>fully usable as a ventilation air flow path</e2> and that the ventilation space or gap is free of enclosed, non-ventilated areas.
selection
f36650d9-cd31-4795-9728-7a4dcf3cadde
Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.
{'ID': '229_Finnish_FireSafety'}
Dwellings, accommodation premises, <e1>institutions</e1>, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate <e2>system that gives a warning at an early stage of a beginning fire</e2>.
necessity
103f99ad-884b-4bae-9f22-ccb1c5bc3d26
In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.
{'ID': '110_Finnish_FireSafety'}
In an open garage of no more than five storeys, the maximum <e1>area</e1> may be used as the surface area of the storeys, even though the driveways between the various storeys are <e2>combined</e2>.
none
31d635b2-1d32-49dd-a848-5b5acaf50128
For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.
{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'}
For <e1>existing</e1> dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the <e2>energy performance</e2> of the whole system should be assessed.
none
64695439-3458-4d43-8e7b-a2ba75075cea
There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.
{'ID': '124_Finnish_SafetyOfUse'}
There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and <e1>structural elements</e1> that are <e2>located on the roof of the building</e2> and that must be accessed regularly.
selection
45338082-ca66-418b-8fe1-8f2be926f330
A cube of no more than 100 millimetres may pass between the stair steps.
{'ID': '52_Finnish_SafetyOfUse'}
A <e1>cube</e1> of no more than <e2>100 millimetres</e2> may pass between the stair steps.
less-equal
cc72106e-9e7f-47cf-8a95-0173a8305dad
In a new building, the crawl space height must be 0.8 metres on average at the minimum.
{'ID': '83_Finnish_Health-Humidity'}
In a new <e1>building</e1>, the crawl space <e2>height</e2> must be 0.8 metres on average at the minimum.
none