text
stringlengths 9
324
| label
int64 0
10
|
---|---|
architectural, functional, design, or performance requirements in the fPRD or as Statement of | 9 |
. — The Director of | 9 |
COUNTRY, ORDAIN1NG FOR THIS | 7 |
and participating VFR aircraft. | 3 |
Serve as a means of relating the lesson to the objectives | 3 |
Bundesministerium der Finanzen: | 9 |
prescribed in Article 30-13, paragraph (1) of the Act to provide information | 3 |
meet the minimum | 6 |
, That notwithstanding section | 9 |
Variation of the Dorset and Wiltshire Fire and Rescue Authority Combination Scheme | 7 |
which is shown in | 9 |
Anlage 4 (zu § 1 Abs. 4 des Gesetzes) | 7 |
Levy on Alcoholic Beverages Fund | 7 |
price of the contract [excluding travel expenses]]. | 9 |
any conflict with or breach the terms of any easement and/or other legal or land interest of Cadent | 9 |
supplement AC 91 | 9 |
RITERES DE SELECTION | 7 |
ENROLLED IN PATIENT ENROLLMENT SYSTEM OF DEPART- | 7 |
COMPLIANCE WITH TENDER SPECIFICATION AND MINIMUM REQUIREMENTS | 7 |
II.23.3 Interest on late payment | 7 |
関し相当の経験を有する医師、歯科医師、薬剤師、看護師、歯科衛生士、臨床検査 | 3 |
not more than four persons may be appointed as Minister or Assistant Minister from | 3 |
Windshield Surface Seal Coating | 7 |
a bad bounce since airspeed diminishes very rapidly in the | 9 |
If the generator cannot maintain the required voltage level, | 9 |
paper versions | 7 |
Article 2 With regard to export of goods conducted, as permitted, by a person | 3 |
The NOT Gate | 7 |
Article 7 - | 7 |
Accomplishing a constant radius ground track requires | 9 |
are listed in the EU | 9 |
⦁ $_{Time after completion of group tasks for learners to systematically reflect upon how they worked together as }$ | 3 |
Check the reservoir level of two-stroke engines with oil | 9 |
approach clearance. | 9 |
Personen) | 9 |
Fully Articulated Rotor System | 7 |
Collaborating with ANG on all aspects of NextGen Integrated Safety Management to | 3 |
direction of the initial loss of lift and con- | 9 |
Kostenermittlung und Umlagepflicht im Aufgabenbereich Banken und sonstige | 3 |
instrument approach procedure (IAP) chart provides | 9 |
hold more than one office unless expressly so provided by law. But this section | 9 |
REARWARD FLIGHT | 7 |
Constitution of offices | 7 |
Allowances payable to members of a combined fire and rescue authority | 7 |
certificate of English proving at least a B2 level. | 9 |
OFF SCHED | 6 |
Rolling friction is created | 9 |
with the autopilot. Pilots must be aware of the mode | 3 |
Notice that a further increase | 9 |
Pre-cast units for kerbs and surface drainage | 7 |
this engagement in accordance with the IFAC standards and ethics set out in these ToR. | 3 |
Reference is to be made to service conditions above for the rating of components and equipment to be installed | 9 |
Annex 6. Financial offer form | 7 |
Rigger check number 1. | 3 |
around? Subtracting 200 from 305 and adding 20, | 3 |
of the Vice President and the Office of the Chaplain | 9 |
die Auszubildenden zur Ausübung einer qualifizierten beruflichen Tätigkeit im Sinne des § 1 Abs. 2 des | 9 |
designed with straight threads to receive flared tube | 9 |
office of a person who engages in foreign exchange business or other person | 3 |
(highlighted in green in the example above) begins at the MAP and continues until the desig- | 3 |
incl. identification & briefing | 7 |
II.4.1.10 Certificate of conformity | 7 |
sod or runway texture. Focus direct central vision at a | 9 |
Motor routine 1 | 7 |
Materials: Nylon supertack, 3-ring housings of the | 3 |
that allows a metered amount of oxygen to continuously | 9 |
during touchdown and maintain directional control | 9 |
Improper mixing of materials. | 3 |
Type-7 Webbing. | 0 |
在地及び代表者の氏名) | 9 |
transformer establishes a magnetic field. When the breaker | 9 |
a collective control to change the pitch of the rotor | 9 |
organisations participating in EU calls for tenders | 9 |
range of | 9 |
Air conditioning inlet | 6 |
Monitor (PRM) Approaches | 7 |
ARRANGEMENT/COORDINATION OF INTERVIEWS | 7 |
Many aircraft are affected to some degree by this characteristic, | 9 |
Manual Opening: | 8 |
contractors. | 9 |
Appropriate for 47 mm membrane filter | 3 |
payments or payment of the balance. Where the payment of the balance takes the form of a | 9 |
Igor Sikorsky designed the VS-300 helicopter | 0 |
configuration, there are two options how to do this: | 3 |
signed by both parties. | 9 |
by the lifting. Conversely, it is possible for dry heated air | 9 |
由空気中の空気カーマ率(以下「空気カーマ率」という。)になるようにしやへい | 3 |
ratios are a carbon fiber material or | 9 |
safeguard night vision. | 9 |
Minimum Factors | 7 |
るおそれのある部分がロの(1)及び(2)に掲げる要件を満たしているこ | 3 |
control of FMD in Botswana between financial years 2010 and 2014. | 9 |
Shipment Type 1 | 7 |
the ‘European | 9 |
Additional | 6 |
Shear strength—10 kilopounds | 6 |
Within protected distance and altitude range, but | 6 |
Cultivation of Ground | 7 |
II.25 SÉCURITÉ | 7 |
Figure 4-15. RNAV RNP approach procedure with curved flight tracks. | 0 |