source
stringlengths
11
22
reqs
stringlengths
7
10.8k
spacebert_ecss
The VCD shall collect in the form of a matrix, for each requirement, the following verification information: 1. Requirement identifier, 2. Requirement text 3. traceability between requirement, 4. Levels and stages of verification, 5. methods, 6. link to the relevant section of the verification plan and any planning document, 7. References to any documentation that demonstrates compliance to the requirements, 8. Status of Compliance (yes, no, partial), 9. Close-out status (open / closed), 10. Reasons of the close-out status,
spacebert_ecss
The applicable quality levels defined in Table 7-3 shall apply.
2008_earthcare_web
In all modes, the AOCS shall provide to the ground sufficient housekeeping data to perform shutdown and isolation of malfunctioning parts.
spacebert_ecss
Upon request of the NRB, the supplier shall submit a “request for waiver” for major nonconformances with the “use as-is” or “repair” disposition for customer approval.
spacebert_ecss
The TAC shall summarize the test results used for the TAC.
2021_tmt_ord_WEB
The TMT Observatory shall support the following general communication services within the Observatory as well as between the Observatory and the general Internet using voice over IP (VoIP).
2004_hp_srs_web
All Herschel / Planck on-board software shall be delivered to ESA in source form, including all building scripts necessary to regenerate the on-board image. All supporting documentation shall also be delivered to ESA
2019_jpss_l2_WEB
The NESDIS ESPC shall support software updates while satisfying all functional and performance requirements.
spacebert_ecss
The request sequencing subservice shall provide at least one of the following capabilities: 1. the capability to directly load a request sequence specified in clause 6.21.5.2; 2. the capability to load a request sequence by reference specified in clause 6.21.5.3; 3. the capability to load by reference and activate a request sequence specified in clause 6.21.5.6.
spacebert_ecss
The test procedures shall be validated in accordance to customer requirements or specifications. NOTE This validation can include the determination of relative or absolute efficiencies of the sampling and analysis method to establish a correction factor for the absolute bioburden numbers.
spacebert_ecss
The supplier shall nominate a project manager with a project team under his authority and reporting directly to him.
spacebert_ecss
The technology matrix shall contain a description of the purpose, objective, content and the reason prompting its preparation.
spacebert_ecss
The statistical interpretation of the scale factor error shall be defined by the customer.
spacebert_ecss
For qualification, each device shall meet the requirements specified in the appropriate table of clauses 4.11 and 4.12 after exposure to the complete sequence of conditions specified in Table 4-25.
spacebert_ecss
In the computation of safety margins the following minimum factors of safety shall be used for standard metallic materials: 1. buckling factor of safety: 2
spacebert_ecss
As a minimum, the following tasks shall be performed and documented in a validation report: 1. carry out the validation according the established validation plan; 2. design and build the test set-up or system breadboard in order to represent a realistic system application; 3. use the breadboard to perform validation tests that cover full functionality and all operating modes and conditions of the device; 4. specify, design and execute specific burn-in or other screening tests for the later test of the FM parts; if agreed by the business agreement; 5. document scope, sequences, set-up and results of the validation tests in the validation report; NOTE The validation report becomes part of the design validation documentation. 6. Compare specified parameters with measured parameters.
2017_s45_mrtd_web
For any spatial sample, the Instrument Integrated Energy (IIE) over an area of dimension 1.0 SSD along track by 1.0 SSD across track shall vary by less than 10 percent points over the spectral range containing the UV, Vis, NIR-1, and the NIR-2.
spacebert_ecss
Qualification tests shall be performed to verify that the structure design and manufacturing technique fulfil specification requirements. NOTE Qualification tests can include static tests, dynamic and acoustic tests, and other tests (e.g. thermal stress test).
2008_earthcare_web
At EOP, the satellite shall dispose of all remaining fuel, if it can be demonstrated that it will burn up during re-entry in the atmosphere and does not pose any hazard, or the satellite de-orbiting shall commence and a controlled re-entry in the atmosphere shall be allowed.
spacebert_ecss
If the mathematical model predictions are outside the applicable correlation criteria, the mathematical model shall be modified and the analysis rerun until it meets the criteria.
spacebert_ecss
It shall be possible for the QoS of a virtual channel, used by a virtual network on one link, to be different to that of other virtual channels on other links used by that same virtual network.
spacebert_ecss
If the specified output port does not have a virtual channel with the same virtual network number as that on which the packet arrived in the input port, the packet shall be discarded and an invalid output port error recorded by the routing switch.
2012_d51_web
The SIT sub-system shall automatically request a Central Operations service to generate a unique configuration file associated with each unique version comprising of the following information -
2005_skal1_WEB
For each search sub-array within SKA1_Mid Pulsar search, the processing shall be capable of searching for single dispersed pulses over dispersion measure range up to 3000 pc cm-3 commensally with searches for periodic pulses with a S/N performance better than 7
spacebert_ecss
The PCB manufacturer shall complete the MRR checklist.
2007_trs_mrd_web
The onboard data storage system shall have sufficient reliability to allow compliance with R-2.7.2-1
spacebert_ecss
Non-interruptible sequence shall be identified in the procedure.
spacebert_ecss
The PCB manufacturer shall have a work instruction for in-process IST control.
spacebert_ecss
For each telecommand packet transporting a request to detail-report all position-based scheduled activities, the application data field shall be omitted.
spacebert_ecss
Static analysis shall be performed to verify that the structural responses (e.g. displacements, forces, stresses and internal loads) to (quasi) static loads conform to the structural requirements.
spacebert_ecss
Test jigs shall ensure a tensile loading parallel to the fastener main axis.
spacebert_ecss
The SCD-CVG shall include the same provisions as for the mechanical properties for the qualification tests (in conformance with D.2.1<8.5> a1, 2 and 3).
spacebert_ecss
The Pre-storage review shall: 1. confirm the configuration of the item to be stored as agreed in the Storage Plan in conformance with DRD from Annex A including status of all RFD or RFWs, NCRs and open work; 2. ensure that storage documentation, specified in the requirements from the clause 5.2, is available and covers all storage activities and duration; 3. ensure that storage resources are available in terms of tools, storage support equipment’s, facilities and personnel and fulfil the conditions documented in the storage plan; 4. conclude on the acceptability to start the storage; 5. identify periodic inspection and testing.
2008_keepass_PURE
Data Flow
2021_tmt_ord_WEB
Visitor instrument data shall be stored in the TMT DMS.
spacebert_ecss
The design report, PSA, WCA, FMECA, thermal Analysis, Radiation Analysis, EMC analysis for electrical design, supported by the detailed circuit diagrams, shall be included in the DJF NOTE The DJF contain all descriptions and analyses meant to verify that the design meets the requirements. For the DJF, see ECSS-E-ST-10.
2013_echo_mrd_WEB
The MOC shall be responsible for the spacecraft operations after launch, including mission planning, spacecraft monitoring and control, and orbit and attitude determination and control.
spacebert_ecss
In a virtual network, N-Chars from one packet shall not be interleaved with N-Chars from another packet.
2021_gmt_oad_web
The AGWS subsystem shall be maintainable within 706 hours per year.
spacebert_ecss
The Data Link layer shall be responsible for establishing communications across the SpaceWire link, for controlling the flow of information over the link, for sending and receiving N-Chars, for sending and receiving broadcast codes and for re-establishing communications across the link after errors that occur over the link.
spacebert_ecss
The requirements included in the document shall be applied independently from the selected procedure delivery media.
spacebert_ecss
The forward voltage of the string blocking diode (if present) shall be computed: 1. using the worst-case voltage drop specified by the diode manufacturer, 2. at the diode operating temperature corresponding to the operational string current for each mission phase in worst case conditions.
2011_dot_WEB
The Data Distribution Subsystem shall provide information to a catalog describing the quality characteristics of the type of data the data provider is sending.
2008_earthcare_web
The spacecraft shall have the knowledge of the actual health status of all the hardware units required for any mode start that is potentially hazardous (e.g. attitude control modes). It shall be possible to override this information by telecommand, and it shall be available in telemetry.
2021_gmt_oad_web
The ASMS and FSMS shall have a range of motion in the M2 segment RY rotation degree of freedom of ± 3000 ?rad.
spacebert_ecss
The line receiver shall be operational when the line receiver enable signal is asserted.
spacebert_ecss
The IST cycling may be performed to a temperature of 210 °C.
2021_tmt_oad_WEB
An overhead monorail crane shall be available in the Utility Room with a 2 ton (1,814 kg) capacity.
2005_skal1_WEB
SKA1 shall be able to produce VLBI beam output data with either dual or single polarization
spacebert_ecss
Each position-based schedule summary report shall contain, for each scheduled activity to summary report, a notification consisting of: 1. if sub-schedules are supported, the identifier of the sub-schedule; 2. if groups are supported, the identifier of the group; 3. the scheduled release position; 4. if persistent scheduling is supported: (a) the activity persistency status; (b) if the activity persistency status is "persistent", the persistent activity periodicity; 5. the identifier of the related request consisting of: (a) its source identifier; (b) its application process identifier; (c) its sequence count.
spacebert_ecss
When the user has a packet to send over the SpaceWire network, it shall generate a SEND_PACKET.request primitive to request to send the SpaceWire packet over the network.
2005_skal1_WEB
A hazard analysis shall be performed at the system and element level in accordance with BS IEC 61882 and, where applicable, shall include a FMEA in accordance with EN 60812.
spacebert_ecss
Working surfaces shall be covered with an easily-cleaned hard top or have a replaceable surface of clean, non-corrosive, silicone-free paper.
2021_gmt_ord_web
The GMT Observatory shall be able to start a science exposure on a new target with any deployed instrument in less than 600 seconds from the initiation of slew.
spacebert_ecss
If containment cannot be verified, the hazardous substances (and any part of the space system that has potentially been exposed) shall not be returned to Earth (unless sterilized in space).
spacebert_ecss
The minimum stripping force, see Table 5-3, shall be measured and recorded after the force has been applied and before the wrapped conductor has been moved one wire diameter from its original position.
spacebert_ecss
The provider of the bioburden reduction service shall demonstrate that the installation and operational qualifications are valid for the activities duration.
spacebert_ecss
A node supporting distributed interrupts in the interrupt with acknowledgement mode shall conform to clause 5.6.5.4.
2012_d51_web
The SIT sub-system ECV product processing chain shall contain a Leads Filtering module performing functionality as described in [R-9] §6.1
spacebert_ecss
Requirements for contamination control during the product life cycle as specified in ECSS-Q-ST-70-01 clause 5.2 shall apply. NOTE Requirements for TCS cleanliness and contamination control can be part of the system cleanliness and contamination control plan.
2006_eirenesys15_PURE
The network services necessary to meet the range of UIC requirements are detailed below. These services are to be considered as a minimum set for implementation within each GSM-R standard network. Railways may implement additional network services as desired. (I)
spacebert_ecss
The limit loads are derived as follows: 1. For cases where a representative statistical distribution of the loads is known, the limit load shall be defined as the load level not being exceeded with a probability of 99 % and a confidence level of 90 % during the service-life. 2. For cases where a statistical distribution of the loads is not known the limit loads shall be agreed with the costumer. NOTE It is good practice to determine the loads using conservative assumptions. 3. For pressurised systems, the maximum expected operating pressure (MEOP) shall be part of the limit loads.
2019_jpss_l1rds_web
Sensor trending data shall be analyzed and the trending analysis results archived and made accessible to the JPSS stakeholders.
spacebert_ecss
The real time acquisition shall be specified by the customer.
2005_skal1_WEB
The SKA1_Mid, for each sub-array, shall have a maximum noise leakage power from non adjacent frequency channels better than -60 dB.
2005_skal1_WEB
External sources of information used by the Elements shall be cached by Telescope Manager. No sources other than those cached by TM shall be used.
2019_gateway_WEB
The Gateway shall allocate a minimum of 5.15 Tbits/day (644 GB/day) for utilization use.
spacebert_ecss
Any PFCI containing detected defects shall not be used without approval of the customer. NOTE 1 The first option to be considered when a defect is detected in flight hardware is to remove or repair the defect. NOTE 2 For highly critical hardware (especially when used for manned spaceflight), more conservative verification methodology can be requested by the customer (see e.g. NASA-HDBK-5010).
spacebert_ecss
Definition of containers shall be in conformance with the latest version of UNECE regulations ST/SG/AC.10/1 .
2021_gmt_oad_web
Observatory IT will provide communication between the facilities on the summit, the support sites, the base facility, and the outside world through the Observatory IT Network. Observatory IT is separate from the Observatory Computing Network (OCN) and the ISS network. In general, hardware will be located within rooms in specific buildings, hence contained within the PBS of those buildings, while the connecting fibers will be part of Site Infrastructure. Internet service to the GMT site during the construction phase is provided by a connection to the existing LCO network. The construction internet system has a bandwidth of approximately 100 Mbps.
2012_stequest_mrd_web
DC non-gravitational accelerations on the spacecraft shall be less than 1E-6 m/s2 , within the instrument volume, when measuring.
spacebert_ecss
Testing of circuits shall be performed at equipment level by the application of voltage spikes on input, output and power lines.
spacebert_ecss
Dross and burned, residual flux shall be removed from the surface of the molten solder immediately prior to solderability test.
2021_tmt_oad_WEB
Components of the observatory wide fire system shall be mounted on the telescope structure to detect smoke and heat caused by a fire on the telescope or telescope.
spacebert_ecss
Cryostats shall be NDI inspected prior to the proof pressure test.
2019_gateway_WEB
The Gateway shall enable two-way private audio and motion imagery communication between the ground and crew.
spacebert_ecss
The thruster shall provide the required performance over the full thrust range.
spacebert_ecss
The SRelD shall list all the unsolved SPR and approved SW&D related to the version of the software configuration item.
spacebert_ecss
When in the Connecting state, the Link state machine shall initiate the following actions: 1. Start a 12,8 µs timer on entering the Connecting state. 2. Assert the Transmit Enable control flag, but only pass FCTs and Nulls to the Encoding Layer, following the rules described in clause 5.5.6. 3. Assert the Receive Enable control flag without storing any N-Chars received from the Encoding Layer in the RX FIFO and without registering any broadcast codes received from the Encoding Layer.
2007_trs_mrd_web
Lower level science requirements shall be fulfilled (TBC)
spacebert_ecss
For the assessment of commercial components, the supplier shall collect the available data on the manufacturer and the component in the JD. Specified in the requirement 5.2.4.d.
spacebert_ecss
Data segments, FCTs and broadcast messages shall be temporarily placed in an error recovery buffer prior to passing them to the Multi-Lane or Lane layer for sending over the SpaceFibre link, so that they can be resent if an error occurs.
spacebert_ecss
In case the test fails because the set voltage is not achieved due to high capacitance caused by presence of plane layers, one further re-test may be performed with adjusted parameters.
2008_peering_PURE
Mediator-SR, mediator-PR, mediator-PA interaction protocols are defined.
spacebert_ecss
No physical contact with the hardware shall take place during an inspection.
2006_eirenesys15_PURE
The following supplementary services, identified in section 2, are to be supported for each type of mobile radio:
spacebert_ecss
If a filter unit is required, its design and location shall be defined.
2005_microcare_PURE
The above mentioned payment terms will help the MSIU to make the payment detail easy and also help the VSP to get their payment in timeThe system will control the payment process and terms. The allowed users only can able to Add, Modify or delete the VSP master information including payment terms. The VSP screen will have the provision to view the Claim Status of selected VSP. The system will facilitate to show the user following details if necessary. VSP Name (as the report header and below as the details part of report) Claim No Date Date of System Entry Amount Status Remarks
2011_dot_WEB
The Core System shall receive misbehavior reports from System Users.
2021_tmt_oad_WEB
ESW shall provide visualization UIs or tools that support environmental conditions presentation.
2007_jwst_mrd_web
The Ground Segment shall generate wavefront error correction commands for uplink to the Observatory from the downlinked wavefront sensing data.
spacebert_ecss
In conformance with clause 6.4.3.16, the SCD-SCA shall include the test temperature, in °C and the capacitance test method as specified either in clause 11.1 or 11.2 of this Standard.
spacebert_ecss
The Type-B fibre optic cable shall contain two or more multi-mode, graded index, 50/125 µm fibres as specified in MIL-PRF-49291/1-01:2014.
spacebert_ecss
The event-action subservice capability to delete event-action definitions shall be declared when specifying that subservice.
spacebert_ecss
Wires terminating at terminals that do not have a mechanical shoulder or turret shall not be attached closer than one conductor diameter to the top of the terminal.
spacebert_ecss
Hardware shall not be exposed to environments causing chemical contamination.
spacebert_ecss
The supplier shall select, and propose to the safety approval authority, the safety verification methods to be used in conformance to the applicable safety requirements.
spacebert_ecss
The NRB shall decide on the necessity and extent of any retest activity in order to demonstrate the correctness of the disposition made.
spacebert_ecss
The connector contacts for Type-C EGSE to flight adaptor cable assemblies shall be terminated as shown in Table 5-24 and illustrated in Figure 5-17.
spacebert_ecss
An actionee and a due date shall be entered for the implementation.