text
stringlengths
374
447
For Project 3529 in Fiscal Year 2018 Period 4 Period To Date Revenue is 126667.23 Period to Date Cost is 126667.23 Period to Date Profit is 0.00 Year to Date Revenue is 534907.00 Year to Date Cost is 534907.00 Year to Date Profit is 0.00Inception to Date Revenue is 2997582.25 Inception to Date Cost is 2997582.25 Inception to Date Profit is 0.00 Inception to Date Funding is 3063965.66 Backlog is 66383.41.
For Project 3272 in Fiscal Year 2021 Period 4 Period To Date Revenue is 23996.96 Period to Date Cost is 10163.65 Period to Date Profit is 13833.31 Year to Date Revenue is 95987.84 Year to Date Cost is 51888.26 Year to Date Profit is 44099.58Inception to Date Revenue is 503492.32 Inception to Date Cost is 299252.19 Inception to Date Profit is 204240.13 Inception to Date Funding is 695468.00 Backlog is 191975.68.
For Project 3310 in Fiscal Year 2014 Period 5 Period To Date Revenue is 176454.66 Period to Date Cost is 130766.46 Period to Date Profit is 45688.20 Year to Date Revenue is 887662.76 Year to Date Cost is 674567.37 Year to Date Profit is 213095.39Inception to Date Revenue is 30391807.66 Inception to Date Cost is 26890371.25 Inception to Date Profit is 3501436.41 Inception to Date Funding is 32370021.31 Backlog is 1978213.65.
For Project 3548 in Fiscal Year 2016 Period 11 Period To Date Revenue is 10.85 Period to Date Cost is 10.85 Period to Date Profit is 0.00 Year to Date Revenue is 3401.60 Year to Date Cost is 3401.60 Year to Date Profit is 0.00Inception to Date Revenue is 3401.60 Inception to Date Cost is 3401.60 Inception to Date Profit is 0.00 Inception to Date Funding is 7653.25 Backlog is 4251.65.
For Project 3511 in Fiscal Year 2014 Period 8 Period To Date Revenue is 0.00 Period to Date Cost is -10.94 Period to Date Profit is 10.94 Year to Date Revenue is 44205.27 Year to Date Cost is 1826.16 Year to Date Profit is 42379.11Inception to Date Revenue is 86136.92 Inception to Date Cost is 43757.81 Inception to Date Profit is 42379.11 Inception to Date Funding is 86136.92 Backlog is 0.00.
For Project 3508 in Fiscal Year 2014 Period 4 Period To Date Revenue is 0.00 Period to Date Cost is 80.82 Period to Date Profit is -80.82 Year to Date Revenue is 0.00 Year to Date Cost is 82.79 Year to Date Profit is -82.79Inception to Date Revenue is 37347.90 Inception to Date Cost is 23781.15 Inception to Date Profit is 13566.75 Inception to Date Funding is 37347.90 Backlog is 0.00.
For Project 3458 in Fiscal Year 2011 Period 12 Period To Date Revenue is 0.00 Period to Date Cost is 170.06 Period to Date Profit is -170.06 Year to Date Revenue is 20946.19 Year to Date Cost is 22344.91 Year to Date Profit is -1398.72Inception to Date Revenue is 83784.76 Inception to Date Cost is 53230.43 Inception to Date Profit is 30554.33 Inception to Date Funding is 83784.36 Backlog is -0.40.
For Project 3546 in Fiscal Year 2023 Period 8 Period To Date Revenue is 111768.54 Period to Date Cost is 42526.00 Period to Date Profit is 69242.54 Year to Date Revenue is 494118.90 Year to Date Cost is 732920.30 Year to Date Profit is -238801.40Inception to Date Revenue is 9287164.35 Inception to Date Cost is 8935201.06 Inception to Date Profit is 351963.29 Inception to Date Funding is 14783124.51 Backlog is 5495960.16.
For Project 3541 in Fiscal Year 2016 Period 9 Period To Date Revenue is 70510.44 Period to Date Cost is 57832.83 Period to Date Profit is 12677.61 Year to Date Revenue is 650989.36 Year to Date Cost is 398643.35 Year to Date Profit is 252346.01Inception to Date Revenue is 792010.24 Inception to Date Cost is 484941.76 Inception to Date Profit is 307068.48 Inception to Date Funding is 846125.29 Backlog is 54115.05.
For Project 3467 in Fiscal Year 2011 Period 3 Period To Date Revenue is 372.20 Period to Date Cost is 206.02 Period to Date Profit is 166.18 Year to Date Revenue is 372.20 Year to Date Cost is 372.20 Year to Date Profit is 0.00Inception to Date Revenue is 372.20 Inception to Date Cost is 372.20 Inception to Date Profit is 0.00 Inception to Date Funding is 37189.03 Backlog is 36816.83.
For Project 3223 in Fiscal Year 2022 Period 8 Period To Date Revenue is 0.00 Period to Date Cost is 0.00 Period to Date Profit is 0.00 Year to Date Revenue is -84307.73 Year to Date Cost is 0.00 Year to Date Profit is -84307.73Inception to Date Revenue is 8540348.89 Inception to Date Cost is 8523686.56 Inception to Date Profit is 16662.33 Inception to Date Funding is 8972481.66 Backlog is 432132.77.
For Project 3401 in Fiscal Year 2008 Period 5 Period To Date Revenue is 76706.72 Period to Date Cost is 29053.74 Period to Date Profit is 47652.98 Year to Date Revenue is 253748.23 Year to Date Cost is 162771.71 Year to Date Profit is 90976.52Inception to Date Revenue is 1003383.93 Inception to Date Cost is 371029.64 Inception to Date Profit is 632354.29 Inception to Date Funding is 1196148.00 Backlog is 192764.07.
For Project 3507 in Fiscal Year 2016 Period 10 Period To Date Revenue is 51133.51 Period to Date Cost is 51133.51 Period to Date Profit is 0.00 Year to Date Revenue is 953478.44 Year to Date Cost is 851361.71 Year to Date Profit is 102116.73Inception to Date Revenue is 2371813.43 Inception to Date Cost is 2166587.27 Inception to Date Profit is 205226.16 Inception to Date Funding is 2976067.01 Backlog is 604253.58.
For Project 4045 in Fiscal Year 2022 Period 6 Period To Date Revenue is 0.00 Period to Date Cost is 65.76 Period to Date Profit is -65.76 Year to Date Revenue is 0.00 Year to Date Cost is 24652.70 Year to Date Profit is -24652.70Inception to Date Revenue is 952302.00 Inception to Date Cost is 933972.39 Inception to Date Profit is 18329.61 Inception to Date Funding is 1086696.00 Backlog is 134394.00.
For Project 3475 in Fiscal Year 2013 Period 9 Period To Date Revenue is 0.00 Period to Date Cost is 0.00 Period to Date Profit is 0.00 Year to Date Revenue is -8082.50 Year to Date Cost is 0.00 Year to Date Profit is -8082.50Inception to Date Revenue is 436125.50 Inception to Date Cost is 184574.42 Inception to Date Profit is 251551.08 Inception to Date Funding is 444208.00 Backlog is 8082.50.
For Project 4030 in Fiscal Year 2015 Period 9 Period To Date Revenue is 0.00 Period to Date Cost is 697.25 Period to Date Profit is -697.25 Year to Date Revenue is 4589.46 Year to Date Cost is 4014.95 Year to Date Profit is 574.51Inception to Date Revenue is 4589.46 Inception to Date Cost is 4014.95 Inception to Date Profit is 574.51 Inception to Date Funding is 23797.20 Backlog is 19207.74.
For Project 3509 in Fiscal Year 2014 Period 12 Period To Date Revenue is 0.00 Period to Date Cost is 83.47 Period to Date Profit is -83.47 Year to Date Revenue is 14312.21 Year to Date Cost is 10759.09 Year to Date Profit is 3553.12Inception to Date Revenue is 50022.64 Inception to Date Cost is 46469.52 Inception to Date Profit is 3553.12 Inception to Date Funding is 50022.64 Backlog is 0.00.
For Project 3217 in Fiscal Year 2019 Period 5 Period To Date Revenue is 23269.38 Period to Date Cost is 20967.09 Period to Date Profit is 2302.29 Year to Date Revenue is 117789.99 Year to Date Cost is 68513.47 Year to Date Profit is 49276.52Inception to Date Revenue is 1816874.00 Inception to Date Cost is 1423661.89 Inception to Date Profit is 393212.11 Inception to Date Funding is 2049781.15 Backlog is 232907.15.
For Project 3201 in Fiscal Year 2010 Period 2 Period To Date Revenue is 5186634.29 Period to Date Cost is 4930698.46 Period to Date Profit is 255935.83 Year to Date Revenue is 11170159.94 Year to Date Cost is 10647661.58 Year to Date Profit is 522498.36Inception to Date Revenue is 398467209.34 Inception to Date Cost is 382115878.04 Inception to Date Profit is 16351331.30 Inception to Date Funding is 422635458.68 Backlog is 24168249.34.
For Project 3557 in Fiscal Year 2017 Period 2 Period To Date Revenue is 4836.86 Period to Date Cost is 4836.86 Period to Date Profit is 0.00 Year to Date Revenue is 4836.86 Year to Date Cost is 4836.86 Year to Date Profit is 0.00Inception to Date Revenue is 4836.86 Inception to Date Cost is 4836.86 Inception to Date Profit is 0.00 Inception to Date Funding is 526029.76 Backlog is 521192.90.
For Project 2511 in Fiscal Year 2000 Period 10 Period To Date Revenue is 0.00 Period to Date Cost is -199.39 Period to Date Profit is 199.39 Year to Date Revenue is 24939.56 Year to Date Cost is 28574.09 Year to Date Profit is -3634.53Inception to Date Revenue is 891315.66 Inception to Date Cost is 951376.20 Inception to Date Profit is -60060.54 Inception to Date Funding is 1176543.95 Backlog is 285228.29.
For Project 3567 in Fiscal Year 2022 Period 12 Period To Date Revenue is 36793.48 Period to Date Cost is 54767.08 Period to Date Profit is -17973.60 Year to Date Revenue is 823511.43 Year to Date Cost is 709981.30 Year to Date Profit is 113530.13Inception to Date Revenue is 9542771.19 Inception to Date Cost is 8627372.73 Inception to Date Profit is 915398.46 Inception to Date Funding is 12165066.76 Backlog is 2622295.57.
For Project 4013 in Fiscal Year 2014 Period 11 Period To Date Revenue is 0.00 Period to Date Cost is 9096.10 Period to Date Profit is -9096.10 Year to Date Revenue is 235006.50 Year to Date Cost is 170025.24 Year to Date Profit is 64981.26Inception to Date Revenue is 1298206.22 Inception to Date Cost is 999187.58 Inception to Date Profit is 299018.64 Inception to Date Funding is 1391918.73 Backlog is 93712.51.
For Project 4015 in Fiscal Year 2014 Period 1 Period To Date Revenue is 7815.68 Period to Date Cost is 6577.30 Period to Date Profit is 1238.38 Year to Date Revenue is 7815.68 Year to Date Cost is 6577.30 Year to Date Profit is 1238.38Inception to Date Revenue is 319659.64 Inception to Date Cost is 324044.27 Inception to Date Profit is -4384.63 Inception to Date Funding is 319663.76 Backlog is 4.12.
For Project 3406 in Fiscal Year 2007 Period 10 Period To Date Revenue is 0.00 Period to Date Cost is -13.16 Period to Date Profit is 13.16 Year to Date Revenue is 203349.00 Year to Date Cost is 84742.56 Year to Date Profit is 118606.44Inception to Date Revenue is 203349.00 Inception to Date Cost is 84742.56 Inception to Date Profit is 118606.44 Inception to Date Funding is 203349.00 Backlog is 0.00.
For Project 3564 in Fiscal Year 2022 Period 5 Period To Date Revenue is 0.00 Period to Date Cost is -4.26 Period to Date Profit is 4.26 Year to Date Revenue is 0.00 Year to Date Cost is 554.93 Year to Date Profit is -554.93Inception to Date Revenue is 52690.18 Inception to Date Cost is 32214.90 Inception to Date Profit is 20475.28 Inception to Date Funding is 32153.07 Backlog is -20537.11.
For Project 3560 in Fiscal Year 2022 Period 5 Period To Date Revenue is 470820.33 Period to Date Cost is 495913.63 Period to Date Profit is -25093.30 Year to Date Revenue is 1366858.40 Year to Date Cost is 2265703.15 Year to Date Profit is -898844.75Inception to Date Revenue is 13177156.50 Inception to Date Cost is 20624964.68 Inception to Date Profit is -7447808.18 Inception to Date Funding is 13206180.95 Backlog is 29024.45.
For Project 3546 in Fiscal Year 2020 Period 10 Period To Date Revenue is 0.00 Period to Date Cost is 10827.38 Period to Date Profit is -10827.38 Year to Date Revenue is 1889728.14 Year to Date Cost is 2033724.34 Year to Date Profit is -143996.20Inception to Date Revenue is 5453360.15 Inception to Date Cost is 5455727.61 Inception to Date Profit is -2367.46 Inception to Date Funding is 15215636.27 Backlog is 9762276.12.
For Project 4042 in Fiscal Year 2018 Period 12 Period To Date Revenue is 0.00 Period to Date Cost is -374.06 Period to Date Profit is 374.06 Year to Date Revenue is 36920.57 Year to Date Cost is 34784.34 Year to Date Profit is 2136.23Inception to Date Revenue is 725232.52 Inception to Date Cost is 646924.93 Inception to Date Profit is 78307.59 Inception to Date Funding is 730029.43 Backlog is 4796.91.
For Project 3546 in Fiscal Year 2022 Period 2 Period To Date Revenue is 0.00 Period to Date Cost is 150458.78 Period to Date Profit is -150458.78 Year to Date Revenue is 0.00 Year to Date Cost is 236687.43 Year to Date Profit is -236687.43Inception to Date Revenue is 7403254.58 Inception to Date Cost is 7201007.17 Inception to Date Profit is 202247.41 Inception to Date Funding is 15717609.27 Backlog is 8314354.69.
For Project 3513 in Fiscal Year 2016 Period 11 Period To Date Revenue is 0.00 Period to Date Cost is 10194.62 Period to Date Profit is -10194.62 Year to Date Revenue is 264612.50 Year to Date Cost is 410777.11 Year to Date Profit is -146164.61Inception to Date Revenue is 3869027.14 Inception to Date Cost is 4015191.75 Inception to Date Profit is -146164.61 Inception to Date Funding is 3869027.14 Backlog is 0.00.
For Project 3522 in Fiscal Year 2017 Period 6 Period To Date Revenue is 0.00 Period to Date Cost is 82.55 Period to Date Profit is -82.55 Year to Date Revenue is 371433.56 Year to Date Cost is 323352.49 Year to Date Profit is 48081.07Inception to Date Revenue is 2237109.62 Inception to Date Cost is 2189028.55 Inception to Date Profit is 48081.07 Inception to Date Funding is 2237109.62 Backlog is 0.00.
For Project 4042 in Fiscal Year 2018 Period 1 Period To Date Revenue is 36920.57 Period to Date Cost is 35530.99 Period to Date Profit is 1389.58 Year to Date Revenue is 36920.57 Year to Date Cost is 35530.99 Year to Date Profit is 1389.58Inception to Date Revenue is 725232.52 Inception to Date Cost is 647671.58 Inception to Date Profit is 77560.94 Inception to Date Funding is 776653.46 Backlog is 51420.94.
For Project 3566 in Fiscal Year 2018 Period 3 Period To Date Revenue is 32006.73 Period to Date Cost is 32006.73 Period to Date Profit is 0.00 Year to Date Revenue is 40804.09 Year to Date Cost is 40804.09 Year to Date Profit is 0.00Inception to Date Revenue is 40804.09 Inception to Date Cost is 40804.09 Inception to Date Profit is 0.00 Inception to Date Funding is 53213.46 Backlog is 12409.37.
For Project 2608 in Fiscal Year 2006 Period 7 Period To Date Revenue is 829.28 Period to Date Cost is 937.91 Period to Date Profit is -108.63 Year to Date Revenue is 65979.59 Year to Date Cost is 50841.99 Year to Date Profit is 15137.60Inception to Date Revenue is 674409.50 Inception to Date Cost is 497012.75 Inception to Date Profit is 177396.75 Inception to Date Funding is 249183.40 Backlog is -425226.10.
For Project 3525 in Fiscal Year 2015 Period 10 Period To Date Revenue is 5507.64 Period to Date Cost is 5507.64 Period to Date Profit is 0.00 Year to Date Revenue is 20714.23 Year to Date Cost is 20714.23 Year to Date Profit is 0.00Inception to Date Revenue is 32304.23 Inception to Date Cost is 32304.23 Inception to Date Profit is 0.00 Inception to Date Funding is 2144187.41 Backlog is 2111883.18.
For Project 2818 in Fiscal Year 2007 Period 1 Period To Date Revenue is 0.00 Period to Date Cost is 22177.35 Period to Date Profit is -22177.35 Year to Date Revenue is 0.00 Year to Date Cost is 22177.35 Year to Date Profit is -22177.35Inception to Date Revenue is 101277.73 Inception to Date Cost is 109272.10 Inception to Date Profit is -7994.37 Inception to Date Funding is 150000.00 Backlog is 48722.27.
For Project 4031 in Fiscal Year 2015 Period 9 Period To Date Revenue is 4323.71 Period to Date Cost is 5055.04 Period to Date Profit is -731.33 Year to Date Revenue is 25223.20 Year to Date Cost is 18739.50 Year to Date Profit is 6483.70Inception to Date Revenue is 25223.20 Inception to Date Cost is 18739.50 Inception to Date Profit is 6483.70 Inception to Date Funding is 25755.20 Backlog is 532.00.
For Project 2822 in Fiscal Year 2008 Period 1 Period To Date Revenue is 8325.78 Period to Date Cost is 5846.68 Period to Date Profit is 2479.10 Year to Date Revenue is 8325.78 Year to Date Cost is 5846.68 Year to Date Profit is 2479.10Inception to Date Revenue is 24203.60 Inception to Date Cost is 16029.06 Inception to Date Profit is 8174.54 Inception to Date Funding is 68372.00 Backlog is 44168.40.
For Project 4038 in Fiscal Year 2017 Period 12 Period To Date Revenue is -2590.16 Period to Date Cost is -2434.37 Period to Date Profit is -155.79 Year to Date Revenue is 222366.67 Year to Date Cost is 208991.22 Year to Date Profit is 13375.45Inception to Date Revenue is 1182626.42 Inception to Date Cost is 1111490.99 Inception to Date Profit is 71135.43 Inception to Date Funding is 1755000.00 Backlog is 572373.58.
For Project 3478 in Fiscal Year 2011 Period 10 Period To Date Revenue is 0.00 Period to Date Cost is 1329.20 Period to Date Profit is -1329.20 Year to Date Revenue is 0.00 Year to Date Cost is 1329.20 Year to Date Profit is -1329.20Inception to Date Revenue is 0.00 Inception to Date Cost is 1329.20 Inception to Date Profit is -1329.20 Inception to Date Funding is 46443.58 Backlog is 46443.58.
For Project 3554 in Fiscal Year 2020 Period 9 Period To Date Revenue is 0.00 Period to Date Cost is 14701.96 Period to Date Profit is -14701.96 Year to Date Revenue is 42941.05 Year to Date Cost is 71351.39 Year to Date Profit is -28410.34Inception to Date Revenue is 1001226.32 Inception to Date Cost is 983553.37 Inception to Date Profit is 17672.95 Inception to Date Funding is 7179494.97 Backlog is 6178268.65.
For Project 3564 in Fiscal Year 2019 Period 5 Period To Date Revenue is 0.00 Period to Date Cost is 0.94 Period to Date Profit is -0.94 Year to Date Revenue is 0.00 Year to Date Cost is 258.63 Year to Date Profit is -258.63Inception to Date Revenue is 32574.27 Inception to Date Cost is 31630.85 Inception to Date Profit is 943.42 Inception to Date Funding is 32153.07 Backlog is -421.20.
For Project 3591 in Fiscal Year 2023 Period 12 Period To Date Revenue is 516064.41 Period to Date Cost is 135506.64 Period to Date Profit is 380557.77 Year to Date Revenue is 1620760.11 Year to Date Cost is 1583618.95 Year to Date Profit is 37141.16Inception to Date Revenue is 1682403.74 Inception to Date Cost is 1653099.89 Inception to Date Profit is 29303.85 Inception to Date Funding is 3024050.00 Backlog is 1341646.26.
For Project 4024 in Fiscal Year 2014 Period 4 Period To Date Revenue is 38003.97 Period to Date Cost is 33871.13 Period to Date Profit is 4132.84 Year to Date Revenue is 109127.38 Year to Date Cost is 96505.51 Year to Date Profit is 12621.87Inception to Date Revenue is 109127.38 Inception to Date Cost is 96505.51 Inception to Date Profit is 12621.87 Inception to Date Funding is 186816.80 Backlog is 77689.42.
For Project 3518 in Fiscal Year 2016 Period 3 Period To Date Revenue is 218.88 Period to Date Cost is 218.88 Period to Date Profit is 0.00 Year to Date Revenue is 99496.05 Year to Date Cost is 99496.05 Year to Date Profit is 0.00Inception to Date Revenue is 938328.94 Inception to Date Cost is 938328.94 Inception to Date Profit is 0.00 Inception to Date Funding is 1454930.38 Backlog is 516601.44.
For Project 3457 in Fiscal Year 2011 Period 11 Period To Date Revenue is 0.00 Period to Date Cost is 35625.15 Period to Date Profit is -35625.15 Year to Date Revenue is 1077235.07 Year to Date Cost is 1390088.36 Year to Date Profit is -312853.29Inception to Date Revenue is 1275960.91 Inception to Date Cost is 1588814.20 Inception to Date Profit is -312853.29 Inception to Date Funding is 1275960.91 Backlog is 0.00.
For Project 3429 in Fiscal Year 2010 Period 11 Period To Date Revenue is 0.00 Period to Date Cost is 0.00 Period to Date Profit is 0.00 Year to Date Revenue is 14557.26 Year to Date Cost is 0.00 Year to Date Profit is 14557.26Inception to Date Revenue is 33661.26 Inception to Date Cost is 24059.93 Inception to Date Profit is 9601.33 Inception to Date Funding is 33661.26 Backlog is 0.00.
For Project 4016 in Fiscal Year 2017 Period 6 Period To Date Revenue is 19281.46 Period to Date Cost is 12138.88 Period to Date Profit is 7142.58 Year to Date Revenue is 90691.84 Year to Date Cost is 71705.98 Year to Date Profit is 18985.86Inception to Date Revenue is 697348.00 Inception to Date Cost is 597110.83 Inception to Date Profit is 100237.17 Inception to Date Funding is 803736.27 Backlog is 106388.27.
For Project 3578 in Fiscal Year 2020 Period 10 Period To Date Revenue is 15121.00 Period to Date Cost is 11636.49 Period to Date Profit is 3484.51 Year to Date Revenue is 223689.83 Year to Date Cost is 215385.91 Year to Date Profit is 8303.92Inception to Date Revenue is 223689.83 Inception to Date Cost is 215385.91 Inception to Date Profit is 8303.92 Inception to Date Funding is 181452.00 Backlog is -42237.83.
For Project 3551 in Fiscal Year 2022 Period 8 Period To Date Revenue is -169.17 Period to Date Cost is 0.00 Period to Date Profit is -169.17 Year to Date Revenue is -247146.81 Year to Date Cost is 0.00 Year to Date Profit is -247146.81Inception to Date Revenue is 4995789.66 Inception to Date Cost is 4712505.11 Inception to Date Profit is 283284.55 Inception to Date Funding is 4738544.07 Backlog is -257245.59.
For Project 2819 in Fiscal Year 2008 Period 5 Period To Date Revenue is 937.93 Period to Date Cost is 4.80 Period to Date Profit is 933.13 Year to Date Revenue is 937.93 Year to Date Cost is 645.91 Year to Date Profit is 292.02Inception to Date Revenue is 30781.59 Inception to Date Cost is 28665.06 Inception to Date Profit is 2116.53 Inception to Date Funding is 35709.24 Backlog is 4927.65.
For Project 2938 in Fiscal Year 2008 Period 6 Period To Date Revenue is 0.00 Period to Date Cost is 38.89 Period to Date Profit is -38.89 Year to Date Revenue is 4023.00 Year to Date Cost is 2660.81 Year to Date Profit is 1362.19Inception to Date Revenue is 4023.00 Inception to Date Cost is 2660.81 Inception to Date Profit is 1362.19 Inception to Date Funding is 4023.00 Backlog is 0.00.
For Project 3576 in Fiscal Year 2020 Period 5 Period To Date Revenue is -5558.04 Period to Date Cost is 6263.93 Period to Date Profit is -11821.97 Year to Date Revenue is -5558.04 Year to Date Cost is 6263.93 Year to Date Profit is -11821.97Inception to Date Revenue is -5558.04 Inception to Date Cost is 39617.89 Inception to Date Profit is -45175.93 Inception to Date Funding is 33060.50 Backlog is 38618.54.
For Project 2520 in Fiscal Year 2001 Period 1 Period To Date Revenue is 0.00 Period to Date Cost is 1513.47 Period to Date Profit is -1513.47 Year to Date Revenue is 0.00 Year to Date Cost is 1513.47 Year to Date Profit is -1513.47Inception to Date Revenue is 15075094.69 Inception to Date Cost is 13541559.39 Inception to Date Profit is 1533535.30 Inception to Date Funding is 325672.11 Backlog is -14749422.58.
For Project 3201 in Fiscal Year 2008 Period 10 Period To Date Revenue is 5474794.71 Period to Date Cost is 5233165.06 Period to Date Profit is 241629.65 Year to Date Revenue is 49147548.52 Year to Date Cost is 46852809.68 Year to Date Profit is 2294738.84Inception to Date Revenue is 310080513.05 Inception to Date Cost is 297831838.85 Inception to Date Profit is 12248674.20 Inception to Date Funding is 333619879.59 Backlog is 23539366.54.
For Project 3454 in Fiscal Year 2011 Period 10 Period To Date Revenue is 0.00 Period to Date Cost is -11.52 Period to Date Profit is 11.52 Year to Date Revenue is 0.00 Year to Date Cost is 15498.88 Year to Date Profit is -15498.88Inception to Date Revenue is 379548.36 Inception to Date Cost is 615836.36 Inception to Date Profit is -236288.00 Inception to Date Funding is 379548.36 Backlog is 0.00.
For Project 4020 in Fiscal Year 2019 Period 8 Period To Date Revenue is 0.00 Period to Date Cost is 0.00 Period to Date Profit is 0.00 Year to Date Revenue is -2040.80 Year to Date Cost is 0.00 Year to Date Profit is -2040.80Inception to Date Revenue is 7764453.29 Inception to Date Cost is 7409186.99 Inception to Date Profit is 355266.30 Inception to Date Funding is 7776751.68 Backlog is 12298.39.
For Project 3412 in Fiscal Year 2007 Period 11 Period To Date Revenue is 35000.00 Period to Date Cost is 11418.43 Period to Date Profit is 23581.57 Year to Date Revenue is 35000.00 Year to Date Cost is 24935.75 Year to Date Profit is 10064.25Inception to Date Revenue is 35000.00 Inception to Date Cost is 24935.75 Inception to Date Profit is 10064.25 Inception to Date Funding is 111984.19 Backlog is 76984.19.
For Project 2613 in Fiscal Year 2017 Period 1 Period To Date Revenue is 7919.00 Period to Date Cost is 6243.22 Period to Date Profit is 1675.78 Year to Date Revenue is 7919.00 Year to Date Cost is 6243.22 Year to Date Profit is 1675.78Inception to Date Revenue is 6550982.77 Inception to Date Cost is 5539497.61 Inception to Date Profit is 1011485.16 Inception to Date Funding is 6619494.20 Backlog is 68511.43.
For Project 3482 in Fiscal Year 2012 Period 10 Period To Date Revenue is 12824.96 Period to Date Cost is 18521.17 Period to Date Profit is -5696.21 Year to Date Revenue is 128249.60 Year to Date Cost is 126068.31 Year to Date Profit is 2181.29Inception to Date Revenue is 141074.56 Inception to Date Cost is 133855.49 Inception to Date Profit is 7219.07 Inception to Date Funding is 212815.71 Backlog is 71741.15.
For Project 3532 in Fiscal Year 2019 Period 7 Period To Date Revenue is 0.00 Period to Date Cost is 13262.30 Period to Date Profit is -13262.30 Year to Date Revenue is 0.00 Year to Date Cost is 130911.94 Year to Date Profit is -130911.94Inception to Date Revenue is 5000.00 Inception to Date Cost is 1540508.88 Inception to Date Profit is -1535508.88 Inception to Date Funding is 5000.00 Backlog is 0.00.
For Project 3591 in Fiscal Year 2023 Period 6 Period To Date Revenue is 25392.23 Period to Date Cost is 226391.25 Period to Date Profit is -200999.02 Year to Date Revenue is 337883.96 Year to Date Cost is 509866.81 Year to Date Profit is -171982.85Inception to Date Revenue is 399527.59 Inception to Date Cost is 577793.45 Inception to Date Profit is -178265.86 Inception to Date Funding is 2979614.00 Backlog is 2580086.41.
For Project 4016 in Fiscal Year 2014 Period 11 Period To Date Revenue is 10878.75 Period to Date Cost is 16198.22 Period to Date Profit is -5319.47 Year to Date Revenue is 147472.36 Year to Date Cost is 125427.67 Year to Date Profit is 22044.69Inception to Date Revenue is 266268.31 Inception to Date Cost is 232912.99 Inception to Date Profit is 33355.32 Inception to Date Funding is 303125.49 Backlog is 36857.18.
For Project 3201 in Fiscal Year 2004 Period 1 Period To Date Revenue is 5359590.40 Period to Date Cost is 4214014.65 Period to Date Profit is 1145575.75 Year to Date Revenue is 5359590.40 Year to Date Cost is 4214014.65 Year to Date Profit is 1145575.75Inception to Date Revenue is 16814919.31 Inception to Date Cost is 15220686.29 Inception to Date Profit is 1594233.02 Inception to Date Funding is 83747204.85 Backlog is 66932285.54.
For Project 4029 in Fiscal Year 2015 Period 3 Period To Date Revenue is 22504.64 Period to Date Cost is 21131.12 Period to Date Profit is 1373.52 Year to Date Revenue is 22504.64 Year to Date Cost is 21131.12 Year to Date Profit is 1373.52Inception to Date Revenue is 22504.64 Inception to Date Cost is 21131.12 Inception to Date Profit is 1373.52 Inception to Date Funding is 582668.00 Backlog is 560163.36.
For Project 3577 in Fiscal Year 2022 Period 12 Period To Date Revenue is 53288.57 Period to Date Cost is 68806.95 Period to Date Profit is -15518.38 Year to Date Revenue is 14349.67 Year to Date Cost is 129904.86 Year to Date Profit is -115555.19Inception to Date Revenue is 1253512.20 Inception to Date Cost is 1028199.98 Inception to Date Profit is 225312.22 Inception to Date Funding is 2319529.66 Backlog is 1066017.46.
For Project 3301 in Fiscal Year 2009 Period 11 Period To Date Revenue is 6611728.50 Period to Date Cost is 6253733.65 Period to Date Profit is 357994.85 Year to Date Revenue is 82855139.88 Year to Date Cost is 79263573.15 Year to Date Profit is 3591566.73Inception to Date Revenue is 313599317.98 Inception to Date Cost is 300294466.88 Inception to Date Profit is 13304851.10 Inception to Date Funding is 395159616.30 Backlog is 81560298.32.
For Project 3530 in Fiscal Year 2015 Period 6 Period To Date Revenue is 98687.35 Period to Date Cost is 98687.35 Period to Date Profit is 0.00 Year to Date Revenue is 363681.29 Year to Date Cost is 363681.29 Year to Date Profit is 0.00Inception to Date Revenue is 395354.62 Inception to Date Cost is 395354.62 Inception to Date Profit is 0.00 Inception to Date Funding is 579728.00 Backlog is 184373.38.
For Project 2610 in Fiscal Year 2007 Period 5 Period To Date Revenue is 10744.80 Period to Date Cost is 8339.06 Period to Date Profit is 2405.74 Year to Date Revenue is 50427.30 Year to Date Cost is 41928.37 Year to Date Profit is 8498.93Inception to Date Revenue is 266089.44 Inception to Date Cost is 216078.27 Inception to Date Profit is 50011.17 Inception to Date Funding is 307115.04 Backlog is 41025.60.
For Project 2810 in Fiscal Year 2002 Period 10 Period To Date Revenue is 0.00 Period to Date Cost is 23.51 Period to Date Profit is -23.51 Year to Date Revenue is 2000.00 Year to Date Cost is 4120.72 Year to Date Profit is -2120.72Inception to Date Revenue is 6034.47 Inception to Date Cost is 8485.94 Inception to Date Profit is -2451.47 Inception to Date Funding is 4034.47 Backlog is -2000.00.
For Project 3310 in Fiscal Year 2008 Period 10 Period To Date Revenue is 415057.89 Period to Date Cost is 388295.83 Period to Date Profit is 26762.06 Year to Date Revenue is 4617898.22 Year to Date Cost is 4293970.75 Year to Date Profit is 323927.47Inception to Date Revenue is 9960415.70 Inception to Date Cost is 9135676.39 Inception to Date Profit is 824739.31 Inception to Date Funding is 14962214.00 Backlog is 5001798.30.
For Project 3563 in Fiscal Year 2019 Period 9 Period To Date Revenue is 185411.38 Period to Date Cost is 56103.68 Period to Date Profit is 129307.70 Year to Date Revenue is 372688.98 Year to Date Cost is 201750.86 Year to Date Profit is 170938.12Inception to Date Revenue is 607631.66 Inception to Date Cost is 313611.19 Inception to Date Profit is 294020.47 Inception to Date Funding is 706937.13 Backlog is 99305.47.
For Project 3545 in Fiscal Year 2016 Period 5 Period To Date Revenue is 51305.12 Period to Date Cost is 51305.12 Period to Date Profit is 0.00 Year to Date Revenue is 55100.71 Year to Date Cost is 55100.71 Year to Date Profit is 0.00Inception to Date Revenue is 55100.71 Inception to Date Cost is 55100.71 Inception to Date Profit is 0.00 Inception to Date Funding is 3614390.00 Backlog is 3559289.29.
For Project 3507 in Fiscal Year 2019 Period 5 Period To Date Revenue is 0.00 Period to Date Cost is 0.60 Period to Date Profit is -0.60 Year to Date Revenue is 0.00 Year to Date Cost is 262.45 Year to Date Profit is -262.45Inception to Date Revenue is 4473885.87 Inception to Date Cost is 4275731.51 Inception to Date Profit is 198154.36 Inception to Date Funding is 4473885.87 Backlog is 0.00.
For Project 3562 in Fiscal Year 2020 Period 6 Period To Date Revenue is 640.18 Period to Date Cost is 247262.55 Period to Date Profit is -246622.37 Year to Date Revenue is 2450761.21 Year to Date Cost is 2563162.73 Year to Date Profit is -112401.52Inception to Date Revenue is 13006092.88 Inception to Date Cost is 12642037.67 Inception to Date Profit is 364055.21 Inception to Date Funding is 22999578.80 Backlog is 9993485.92.
For Project 2711 in Fiscal Year 2008 Period 6 Period To Date Revenue is 57363.00 Period to Date Cost is 0.00 Period to Date Profit is 57363.00 Year to Date Revenue is 357667.00 Year to Date Cost is 0.00 Year to Date Profit is 357667.00Inception to Date Revenue is 2436979.00 Inception to Date Cost is 0.00 Inception to Date Profit is 2436979.00 Inception to Date Funding is 2214234.00 Backlog is -222745.00.
For Project 3217 in Fiscal Year 2016 Period 2 Period To Date Revenue is 72167.68 Period to Date Cost is 69594.61 Period to Date Profit is 2573.07 Year to Date Revenue is 72167.68 Year to Date Cost is 72167.68 Year to Date Profit is 0.00Inception to Date Revenue is 72167.68 Inception to Date Cost is 72167.68 Inception to Date Profit is 0.00 Inception to Date Funding is 1262412.00 Backlog is 1190244.32.
For Project 3551 in Fiscal Year 2023 Period 12 Period To Date Revenue is 0.00 Period to Date Cost is 0.00 Period to Date Profit is 0.00 Year to Date Revenue is -11810.77 Year to Date Cost is 0.00 Year to Date Profit is -11810.77Inception to Date Revenue is 4898229.96 Inception to Date Cost is 4712643.24 Inception to Date Profit is 185586.72 Inception to Date Funding is 4630696.16 Backlog is -267533.80.
For Project 4024 in Fiscal Year 2017 Period 12 Period To Date Revenue is 0.00 Period to Date Cost is -408.41 Period to Date Profit is 408.41 Year to Date Revenue is 33810.82 Year to Date Cost is 35305.16 Year to Date Profit is -1494.34Inception to Date Revenue is 1152716.42 Inception to Date Cost is 1165737.30 Inception to Date Profit is -13020.88 Inception to Date Funding is 1177107.16 Backlog is 24390.74.
For Project 4012 in Fiscal Year 2013 Period 5 Period To Date Revenue is 0.00 Period to Date Cost is -348.35 Period to Date Profit is 348.35 Year to Date Revenue is 65283.37 Year to Date Cost is 54132.49 Year to Date Profit is 11150.88Inception to Date Revenue is 216011.01 Inception to Date Cost is 162223.06 Inception to Date Profit is 53787.95 Inception to Date Funding is 216011.01 Backlog is 0.00.
For Project 3220 in Fiscal Year 2017 Period 7 Period To Date Revenue is 332569.98 Period to Date Cost is 313194.27 Period to Date Profit is 19375.71 Year to Date Revenue is 2301890.22 Year to Date Cost is 2173636.37 Year to Date Profit is 128253.85Inception to Date Revenue is 6812858.55 Inception to Date Cost is 6436086.33 Inception to Date Profit is 376772.22 Inception to Date Funding is 8167497.21 Backlog is 1354638.66.
For Project 3429 in Fiscal Year 2009 Period 4 Period To Date Revenue is 0.00 Period to Date Cost is 1599.22 Period to Date Profit is -1599.22 Year to Date Revenue is 2053.68 Year to Date Cost is 4152.35 Year to Date Profit is -2098.67Inception to Date Revenue is 2053.68 Inception to Date Cost is 4152.35 Inception to Date Profit is -2098.67 Inception to Date Funding is 19104.00 Backlog is 17050.32.
For Project 3472 in Fiscal Year 2012 Period 12 Period To Date Revenue is 0.00 Period to Date Cost is 7386.42 Period to Date Profit is -7386.42 Year to Date Revenue is 2876862.60 Year to Date Cost is 1586453.87 Year to Date Profit is 1290408.73Inception to Date Revenue is 5325463.09 Inception to Date Cost is 4035054.36 Inception to Date Profit is 1290408.73 Inception to Date Funding is 5325463.09 Backlog is 0.00.
For Project 3423 in Fiscal Year 2008 Period 10 Period To Date Revenue is 0.00 Period to Date Cost is -458.49 Period to Date Profit is 458.49 Year to Date Revenue is 360483.20 Year to Date Cost is 174443.93 Year to Date Profit is 186039.27Inception to Date Revenue is 360483.20 Inception to Date Cost is 174443.93 Inception to Date Profit is 186039.27 Inception to Date Funding is 360483.20 Backlog is 0.00.
For Project 3579 in Fiscal Year 2020 Period 5 Period To Date Revenue is 236212.63 Period to Date Cost is 220759.46 Period to Date Profit is 15453.17 Year to Date Revenue is 1807411.33 Year to Date Cost is 1689169.46 Year to Date Profit is 118241.87Inception to Date Revenue is 2465768.47 Inception to Date Cost is 2304456.51 Inception to Date Profit is 161311.96 Inception to Date Funding is 13217564.93 Backlog is 10751796.46.
For Project 2921 in Fiscal Year 2001 Period 7 Period To Date Revenue is 19076.86 Period to Date Cost is 18168.43 Period to Date Profit is 908.43 Year to Date Revenue is 126422.80 Year to Date Cost is 120402.67 Year to Date Profit is 6020.13Inception to Date Revenue is 448067.09 Inception to Date Cost is 426730.56 Inception to Date Profit is 21336.53 Inception to Date Funding is 600000.00 Backlog is 151932.91.
For Project 3310 in Fiscal Year 2007 Period 11 Period To Date Revenue is 617112.98 Period to Date Cost is 556102.29 Period to Date Profit is 61010.69 Year to Date Revenue is 4465520.45 Year to Date Cost is 4068328.01 Year to Date Profit is 397192.44Inception to Date Revenue is 4761930.71 Inception to Date Cost is 4290248.07 Inception to Date Profit is 471682.64 Inception to Date Funding is 9381860.00 Backlog is 4619929.29.
For Project 3216 in Fiscal Year 2016 Period 4 Period To Date Revenue is 366014.66 Period to Date Cost is 207508.53 Period to Date Profit is 158506.13 Year to Date Revenue is 1130542.01 Year to Date Cost is 1248372.45 Year to Date Profit is -117830.44Inception to Date Revenue is 2229953.79 Inception to Date Cost is 2361832.07 Inception to Date Profit is -131878.28 Inception to Date Funding is 2597019.48 Backlog is 367065.69.
For Project 3457 in Fiscal Year 2012 Period 11 Period To Date Revenue is 0.00 Period to Date Cost is 2116.43 Period to Date Profit is -2116.43 Year to Date Revenue is 37033.14 Year to Date Cost is 56846.11 Year to Date Profit is -19812.97Inception to Date Revenue is 1312994.05 Inception to Date Cost is 1678523.94 Inception to Date Profit is -365529.89 Inception to Date Funding is 1312994.05 Backlog is 0.00.
For Project 3310 in Fiscal Year 2013 Period 3 Period To Date Revenue is 176010.99 Period to Date Cost is 128432.63 Period to Date Profit is 47578.36 Year to Date Revenue is 533764.33 Year to Date Cost is 408634.22 Year to Date Profit is 125130.11Inception to Date Revenue is 27735335.26 Inception to Date Cost is 24875508.77 Inception to Date Profit is 2859826.49 Inception to Date Funding is 31142374.31 Backlog is 3407039.05.
For Project 4036 in Fiscal Year 2022 Period 10 Period To Date Revenue is 0.00 Period to Date Cost is 0.00 Period to Date Profit is 0.00 Year to Date Revenue is -7810.14 Year to Date Cost is 0.00 Year to Date Profit is -7810.14Inception to Date Revenue is 6918057.43 Inception to Date Cost is 6609295.53 Inception to Date Profit is 308761.90 Inception to Date Funding is 6925869.70 Backlog is 7812.27.
For Project 3217 in Fiscal Year 2016 Period 9 Period To Date Revenue is 0.00 Period to Date Cost is 93517.26 Period to Date Profit is -93517.26 Year to Date Revenue is 1238968.43 Year to Date Cost is 1112194.16 Year to Date Profit is 126774.27Inception to Date Revenue is 1238968.43 Inception to Date Cost is 1112194.16 Inception to Date Profit is 126774.27 Inception to Date Funding is 1475665.57 Backlog is 236697.14.
For Project 4044 in Fiscal Year 2020 Period 12 Period To Date Revenue is 7200.00 Period to Date Cost is 7536.15 Period to Date Profit is -336.15 Year to Date Revenue is 37448.25 Year to Date Cost is 134512.48 Year to Date Profit is -97064.23Inception to Date Revenue is 313291.23 Inception to Date Cost is 348457.02 Inception to Date Profit is -35165.79 Inception to Date Funding is 455006.23 Backlog is 141715.00.
For Project 3589 in Fiscal Year 2023 Period 10 Period To Date Revenue is 452482.33 Period to Date Cost is 26269.40 Period to Date Profit is 426212.93 Year to Date Revenue is 3926039.22 Year to Date Cost is 3041870.72 Year to Date Profit is 884168.50Inception to Date Revenue is 7527797.21 Inception to Date Cost is 6108948.31 Inception to Date Profit is 1418848.90 Inception to Date Funding is 9889860.33 Backlog is 2362063.12.
For Project 3277 in Fiscal Year 2024 Period 1 Period To Date Revenue is 36103.74 Period to Date Cost is 13165.49 Period to Date Profit is 22938.25 Year to Date Revenue is 36103.74 Year to Date Cost is 13165.49 Year to Date Profit is 22938.25Inception to Date Revenue is 57327.25 Inception to Date Cost is 27484.51 Inception to Date Profit is 29842.74 Inception to Date Funding is 120671.25 Backlog is 63344.00.
For Project 3578 in Fiscal Year 2022 Period 5 Period To Date Revenue is 11965.53 Period to Date Cost is 8099.84 Period to Date Profit is 3865.69 Year to Date Revenue is 73791.22 Year to Date Cost is 41879.70 Year to Date Profit is 31911.52Inception to Date Revenue is 510066.05 Inception to Date Cost is 393821.30 Inception to Date Profit is 116244.75 Inception to Date Funding is 575190.52 Backlog is 65124.47.
For Project 3212 in Fiscal Year 2010 Period 6 Period To Date Revenue is 0.00 Period to Date Cost is -4.82 Period to Date Profit is 4.82 Year to Date Revenue is 0.00 Year to Date Cost is 138.29 Year to Date Profit is -138.29Inception to Date Revenue is 73327.99 Inception to Date Cost is 61669.49 Inception to Date Profit is 11658.50 Inception to Date Funding is 300000.00 Backlog is 226672.01.
For Project 3408 in Fiscal Year 2009 Period 6 Period To Date Revenue is 0.00 Period to Date Cost is -0.21 Period to Date Profit is 0.21 Year to Date Revenue is 0.00 Year to Date Cost is 401.16 Year to Date Profit is -401.16Inception to Date Revenue is 164223.16 Inception to Date Cost is 130835.15 Inception to Date Profit is 33388.01 Inception to Date Funding is 164223.16 Backlog is 0.00.
For Project 4029 in Fiscal Year 2016 Period 1 Period To Date Revenue is 75758.56 Period to Date Cost is 71134.80 Period to Date Profit is 4623.76 Year to Date Revenue is 75758.56 Year to Date Cost is 71134.80 Year to Date Profit is 4623.76Inception to Date Revenue is 775607.13 Inception to Date Cost is 728269.60 Inception to Date Profit is 47337.53 Inception to Date Funding is 907668.00 Backlog is 132060.87.