question
stringlengths
58
131
QuestionText
stringlengths
7
54
context
stringlengths
72
1.68k
Sector
stringclasses
19 values
Country
stringlengths
4
32
answers
dict
Document
stringclasses
4 values
Alpha3
stringlengths
3
3
SubSector
stringlengths
3
91
split
stringclasses
3 values
Question_Definition
stringlengths
10
78
id
stringlengths
1
5
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 19, 27 ], "text": [ "management and management", "disaster risk management" ] }
First NDC
AGO
Early warning system
train
GCA_Sector
600
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ?
Adapt Now subsector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 19, 27 ], "text": [ "management and management", "disaster risk management" ] }
First NDC
AGO
Early warning system
train
GCA_subsector
601
What are the Adaptation action/priority for the Cross-Cutting Area Sector?
Action and priority
Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000. 9. Soil erosion control through organic methods. Terrestrial ecosystems. 4,000,000. 10. Diversify crops to less climate sensitive cultures. Agriculture and food security. 3,000,000. 11. Technology needs assessment. 500.000. 12.
Cross-Cutting Area
Angola
{ "answer_start": [ 29 ], "text": [ "soil erosion control through organic methods. terrestrial ecosystems" ] }
First NDC
AGO
Landscape management
train
Adaptation action/priority
602
What are the Adaptation action/priority for the Cross-Cutting Area Sector?
Action and priority
Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19.
Cross-Cutting Area
Angola
{ "answer_start": [ 33 ], "text": [ "management. 3,000,000. 17. map areas of erosion risk. terrestrial ecosystems" ] }
First NDC
AGO
Landscape management
train
Adaptation action/priority
603
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Cross-Cutting Area
Angola
{ "answer_start": [ 16, 27 ], "text": [ "soil and water management and management", "disaster risk management" ] }
First NDC
AGO
Landscape management
train
GCA_Sector
604
Which subsector forms part of global climate change adaptation subsector in Cross-Cutting Area Sector ?
Adapt Now subsector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Cross-Cutting Area
Angola
{ "answer_start": [ 16 ], "text": [ "soil and water management and management" ] }
First NDC
AGO
Landscape management
train
GCA_subsector
605
What are the Adaptation action/priority for the Disaster Risk Management (DRM) Sector?
Action and priority
The project aims to build resilience and reduce vulnerability of the Benguela Current marine fisheries systems to climate change through strengthened adaptive capacity and implementation of participatory and integrated adaptive strategies in order to ensure food and livelihood security. Fisheries. Agriculture and food security. Total project cost (US $ million): 16.520. Implementing GEF agency: FAO. Promoting climate- resilient development and enhanced adaptive capacity to withstand disaster risks in Angola’s Cuvelai River Basin.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 15, 63 ], "text": [ "systems to climate change through strengthened adaptive capacity", "promoting climate- resilient development and enhanced adaptive capacity to withstand disaster risks in angola’s cuvelai river basin" ] }
First NDC
AGO
Disaster Risk Management (DRM): General
train
Adaptation action/priority
606
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 16, 27 ], "text": [ "soil and water management and management", "disaster risk management" ] }
First NDC
AGO
Disaster Risk Management (DRM): General
test
GCA_Sector
607
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ?
Adapt Now subsector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 16, 27 ], "text": [ "soil and water management and management", "disaster risk management" ] }
First NDC
AGO
Disaster Risk Management (DRM): General
train
GCA_subsector
608
What are the Adaptation action/priority for the Disaster Risk Management (DRM) Sector?
Action and priority
Disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern Angola and northern Namibia (Project PIRAN). The objective is to strengthen food security and DRR/M, and increase the resilience of agro-pastoral livelihoods by increasing capacity to manage risks related to natural disasters at the level of communities and local institutions.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 0, 53 ], "text": [ "disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern angola and northern namibia (project piran", "risks related to natural disasters" ] }
First NDC
AGO
Disaster Risk Management (DRM): General
train
Adaptation action/priority
609
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 16, 27 ], "text": [ "soil and water management and management", "disaster risk management" ] }
First NDC
AGO
Disaster Risk Management (DRM): General
train
GCA_Sector
610
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ?
Adapt Now subsector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 16, 27 ], "text": [ "soil and water management and management", "disaster risk management" ] }
First NDC
AGO
Disaster Risk Management (DRM): General
train
GCA_subsector
611
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector (2)
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 14, 27 ], "text": [ "nutrition, soil and water management and management", "disaster risk management. agriculture and food security" ] }
First NDC
AGO
Disaster Risk Management (DRM): General
train
GCA_Sector_2
612
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ?
Adapt Now subsector (2)
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 16, 27 ], "text": [ "soil and water management and management", "disaster risk management" ] }
First NDC
AGO
Disaster Risk Management (DRM): General
train
GCA_Subsector_2
613
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ?
Adapt Now subsector (3)
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 16, 27 ], "text": [ "soil and water management and management", "disaster risk management" ] }
First NDC
AGO
Disaster Risk Management (DRM): General
train
GCA_Subsector_3
614
What are the Adaptation action/priority for the Agriculture Sector?
Action and priority
Disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern Angola and northern Namibia (Project PIRAN). The objective is to strengthen food security and DRR/M, and increase the resilience of agro-pastoral livelihoods by increasing capacity to manage risks related to natural disasters at the level of communities and local institutions.
Agriculture
Angola
{ "answer_start": [ 0, 53 ], "text": [ "disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern angola and northern namibia (project piran", "risks related to natural disasters" ] }
First NDC
AGO
Agriculture: General
train
Adaptation action/priority
615
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Agriculture
Angola
{ "answer_start": [ 19, 27 ], "text": [ "management and management", "disaster risk management. agriculture" ] }
First NDC
AGO
Agriculture: General
train
GCA_Sector
616
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ?
Adapt Now subsector
Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5.
Agriculture
Angola
{ "answer_start": [ 35, 54 ], "text": [ "vulnerability of the fisheries", "fisheries, agriculture" ] }
First NDC
AGO
Agriculture: General
train
GCA_subsector
617
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector (2)
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Agriculture
Angola
{ "answer_start": [ 31 ], "text": [ "agriculture and food security" ] }
First NDC
AGO
Agriculture: General
val
GCA_Sector_2
618
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ?
Adapt Now subsector (2)
Many of the economy sectors of Angola have been impacted by climate variability in the last thirty years, namely the Agriculture, Coastal Zone, Land-Use, Forests, Ecosystems andBiodiversity, Water resources, Health. However, there are economy sectors which are extremely vulnerable to impacts resulting from the extreme events and which will pose not only serious livelihood and direct health risks but can also affect the economic potential and national food security.
Agriculture
Angola
{ "answer_start": [ 21 ], "text": [ "agriculture, coastal zone" ] }
First NDC
AGO
Agriculture: General
train
GCA_Subsector_2
619
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ?
Adapt Now subsector (3)
Therefore within the context of this INDC, Angola prioritises the implementation of Adaptation measures in the following main sectors:. Agriculture. Coastal Zone. Land-Use, Forests, Ecosystems and Biodiversity. Water resources. Health.
Agriculture
Angola
{ "answer_start": [ 22 ], "text": [ "agriculture. coastal zone" ] }
First NDC
AGO
Agriculture: General
train
GCA_Subsector_3
620
What are the Adaptation action/priority for the Disaster Risk Management (DRM) Sector?
Action and priority
5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. Create an early warning system for flooding and storms. Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 30 ], "text": [ "create an early warning system for flooding and storms. early warning system and disaster risk management. early warning system" ] }
First NDC
AGO
Early warning system
train
Adaptation action/priority
621
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 19, 27 ], "text": [ "management and management", "disaster risk management" ] }
First NDC
AGO
Early warning system
train
GCA_Sector
622
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ?
Adapt Now subsector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 19, 27 ], "text": [ "management and management", "disaster risk management" ] }
First NDC
AGO
Early warning system
train
GCA_subsector
623
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ?
Adapt Now subsector (2)
Enhancement of coastal adaptive capacities at the institutional, systemic and community levels; response to urgent needs posed by climate change. Coastal zones/Marine ecosystems. Total project cost (US $ million): 17.850. Implementing GEF agency: UNEP. Disaster risk reduction/ management to support agropastoral communities affected by recurrent droughts and other natural disasters in southern Angola and northern Namibia (Project PIRAN).
Disaster Risk Management (DRM)
Angola
{ "answer_start": [ 20, 45, 56 ], "text": [ "climate change. coastal zones", "disaster risk reduction/ management", "droughts and other natural disasters" ] }
First NDC
AGO
Early warning system
train
GCA_Subsector_2
624
What are the Adaptation action/priority for the Economy-wide Sector?
Action and priority
Among the priorities identified in the NAPA, two policy measures are noteworthy: revise sectoral laws for proactive adaptation; national institutional mechanism for adaptation planning and mainstreaming. Accordingly, Angola has developed in recent years various national plans and strategies which include activities relevant to climate change, including the:.
Economy-wide
Angola
{ "answer_start": [ 15 ], "text": [ "sectoral laws for proactive adaptation" ] }
First NDC
AGO
Economy-wide: General
train
Adaptation action/priority
625
What are the Adaptation action/priority for the Economy-wide Sector?
Action and priority
Among the priorities identified in the NAPA, two policy measures are noteworthy: revise sectoral laws for proactive adaptation; national institutional mechanism for adaptation planning and mainstreaming. Accordingly, Angola has developed in recent years various national plans and strategies which include activities relevant to climate change, including the:.
Economy-wide
Angola
{ "answer_start": [ 19 ], "text": [ "adaptation; national institutional mechanism for adaptation" ] }
First NDC
AGO
Economy-wide: General
train
Adaptation action/priority
626
What are the Adaptation action/priority for the Economy-wide Sector?
Action and priority
20. Extend water and sanitation network to rural areas. Water resources. Infrastructure. 10,000,000. 21. Explore industrial opportunities from climate change. 1,000,000. 22. Monitor groundwater. Water resources. 3,000,000. 23. Construct flood protection barriers along major rivers. Water resources. Disaster risk management. 5,000,000. 24.
Economy-wide
Angola
{ "answer_start": [ 21 ], "text": [ "industrial opportunities from climate change" ] }
First NDC
AGO
Economy-wide: General
train
Adaptation action/priority
627
What are the Adaptation action/priority for the Economy-wide Sector?
Action and priority
Study impacts of sedimentation and siltation rates on coastal processes. Coastal zones/marine ecosystems. 3,500,000. 25. Improve design and construction of buildings. Infrastructure. 1,000,000. 26. Study impact of climate change on hydroelectricity. Water resources. Energy. 1,000,000. 27. Revise building codes to promote retreat from flood plains and coastal zones. 1,000,000. 28.
Economy-wide
Angola
{ "answer_start": [ 21 ], "text": [ "improve design and construction of buildings. infrastructure" ] }
First NDC
AGO
Economy-wide: General
train
Adaptation action/priority
628
Which subsector forms part of global climate change adaptation subsector in Economy-wide Sector ?
Adapt Now subsector
5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. Create an early warning system for flooding and storms. Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000.
Economy-wide
Angola
{ "answer_start": [ 32, 40, 48 ], "text": [ "early warning system", "early warning system", "early warning system" ] }
First NDC
AGO
Economy-wide: General
train
GCA_subsector
629
What are the Adaptation action/priority for the Economy-wide Sector?
Action and priority
5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. Create an early warning system for flooding and storms. Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000.
Economy-wide
Angola
{ "answer_start": [ 32, 40, 48 ], "text": [ "early warning system", "early warning system", "early warning system" ] }
First NDC
AGO
Economy-wide: General
val
Adaptation action/priority
630
What are the Adaptation action/priority for the Energy Sector?
Action and priority
5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. Create an early warning system for flooding and storms. Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000.
Energy
Angola
{ "answer_start": [ 2, 32, 40, 48 ], "text": [ "extend electricity grid to rural areas*. energy. electricity", "early warning system", "early warning system", "early warning system" ] }
First NDC
AGO
Energy access
val
Adaptation action/priority
631
What are the Adaptation action/priority for the Energy Sector?
Action and priority
Construction of hydroelectric and thermal power plants (CaculoCabaça, Soyo …) that will generate about five thousand megawatts, during the period 2013/2017. Energy. Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Energy and Water Sector Action Plan 2013-2017.
Energy
Angola
{ "answer_start": [ 34, 42 ], "text": [ "energy and water", "energy. energy and water sector action plan 2013" ] }
First NDC
AGO
Energy: General
train
Adaptation action/priority
632
Which subsector forms part of global climate change adaptation subsector in Energy Sector ?
Adapt Now subsector
Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17.
Energy
Angola
{ "answer_start": [ 36, 49 ], "text": [ "water resources. water", "water resources integrated management. water resources. water management" ] }
First NDC
AGO
Energy: General
train
GCA_subsector
633
What are the Adaptation action/priority for the Water Sector?
Action and priority
Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17.
Water
Angola
{ "answer_start": [ 36, 46 ], "text": [ "water resources. water", "16. implement water resources integrated management. water resources. water management" ] }
First NDC
AGO
Water: General
train
Adaptation action/priority
634
Which subsector forms part of global climate change adaptation subsector in Water Sector ?
Adapt Now subsector
Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17.
Water
Angola
{ "answer_start": [ 36, 49 ], "text": [ "water resources. water", "water resources integrated management. water resources. water management" ] }
First NDC
AGO
Water: General
train
GCA_subsector
635
What are the Adaptation action/priority for the Energy Sector?
Action and priority
Total project cost (US $ million): 150 (to 2025). Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Construction of hydroelectric and thermal power plants. Construction of hydroelectric and thermal power plants (CaculoCabaça, Soyo …) that will generate about five thousand megawatts, during the period 2013/2017.
Energy
Angola
{ "answer_start": [ 28 ], "text": [ "energy. construction of hydroelectric and thermal power plants. construction of hydroelectric and thermal power plants" ] }
First NDC
AGO
Power system planning
train
Adaptation action/priority
636
What are the Adaptation action/priority for the Energy Sector?
Action and priority
To reduce the current unsustainable and GHG-intensive biomass production and utilization from Angola's Miombo woodlands via an integrated suite of interventions in the country's charcoal value chain. Renewable energy. Forestry. Total project cost (US $ million): 17.884. Implementing GEF agency: UNDP. The “Solar Village” Programme. The “Solar Village” Programme, launched by the Executive under the National Development Plan (PND) 2013-2017, allowed to date the electrification of 48 villages in different regions of the country, benefiting 100,000 families.
Energy
Angola
{ "answer_start": [ 55 ], "text": [ "solar village” programme. the “solar village” programme" ] }
First NDC
AGO
Renewable energy
train
Adaptation action/priority
637
What are the Adaptation action/priority for the Energy Sector?
Action and priority
The estimated cost of implementing the NAPA priority projects amounts to over 500 million USD if current inflation rates are applied to 2011 costing. PROJECT TITLE. PROJECT SECTOR. SECTOR COMPONENT(S). PROJECT COST (USD). 1. Promote alternative renewable energies to avoid deforestation*. Energy. Renewable energy, Forestry. 3,500,000*. 2.
Energy
Angola
{ "answer_start": [ 43 ], "text": [ "promote alternative renewable energies to avoid deforestation*. energy. renewable energy" ] }
First NDC
AGO
Renewable energy
train
Adaptation action/priority
638
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Energy
Angola
{ "answer_start": [ 19, 27 ], "text": [ "management and management", "disaster risk management" ] }
First NDC
AGO
Renewable energy
train
GCA_Sector
639
Which subsector forms part of global climate change adaptation subsector in Energy Sector ?
Adapt Now subsector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Energy
Angola
{ "answer_start": [ 19, 27 ], "text": [ "management and management", "disaster risk management" ] }
First NDC
AGO
Renewable energy
train
GCA_subsector
640
What are the Adaptation action/priority for the LULUCF/Forestry Sector?
Action and priority
The estimated cost of implementing the NAPA priority projects amounts to over 500 million USD if current inflation rates are applied to 2011 costing. PROJECT TITLE. PROJECT SECTOR. SECTOR COMPONENT(S). PROJECT COST (USD). 1. Promote alternative renewable energies to avoid deforestation*. Energy. Renewable energy, Forestry. 3,500,000*. 2.
LULUCF/Forestry
Angola
{ "answer_start": [ 43 ], "text": [ "promote alternative renewable energies to avoid deforestation*. energy. renewable energy, forestry" ] }
First NDC
AGO
LULUCF/Forestry: General
train
Adaptation action/priority
641
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
LULUCF/Forestry
Angola
{ "answer_start": [ 19, 27 ], "text": [ "management and management", "disaster risk management" ] }
First NDC
AGO
LULUCF/Forestry: General
train
GCA_Sector
642
Which subsector forms part of global climate change adaptation subsector in LULUCF/Forestry Sector ?
Adapt Now subsector
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
LULUCF/Forestry
Angola
{ "answer_start": [ 19, 27 ], "text": [ "management and management", "disaster risk management" ] }
First NDC
AGO
LULUCF/Forestry: General
train
GCA_subsector
643
What are the Adaptation action/priority for the Energy Sector?
Action and priority
Study impact of climate change on hydroelectricity. Water resources. Energy. 1,000,000. 27. Revise building codes to promote retreat from flood plains and coastal zones. 1,000,000. 28. Construct sea level protection structure. Infrastructure. Coastal zones and marine ecosystems. 10,000,000. 29. Study impact of climate change on mining. Energy. 500.000. **Total. 107,500,000.
Energy
Angola
{ "answer_start": [ 0, 52 ], "text": [ "study impact of climate change on hydroelectricity", "study impact of climate change on mining. energy" ] }
First NDC
AGO
Renewable Energy: Hydro
train
Adaptation action/priority
644
Which subsector forms part of global climate change adaptation subsector in Energy Sector ?
Adapt Now subsector
Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Energy and Water Sector Action Plan 2013-2017. A characterisation of the two sub-sectors, including infrastructure and the institutional component, which result in commonalities, e.g.
Energy
Angola
{ "answer_start": [ 6, 14 ], "text": [ "energy and water", "energy. energy and water" ] }
First NDC
AGO
Renewable Energy: Hydro
train
GCA_subsector
645
What are the Adaptation action/priority for the Health Sector?
Action and priority
Agriculture and food security. 5,000,000. 13. Climate monitoring and data management system. Early warning system and disaster risk management. 17,500,000. 14. Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes.
Health
Angola
{ "answer_start": [ 0, 28 ], "text": [ "agriculture and food security", "study the implication of climate change on disease patterns for humans and livestock. agriculture and food security. health" ] }
First NDC
AGO
Disease surveillance and control
train
Adaptation action/priority
646
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5.
Health
Angola
{ "answer_start": [ 18 ], "text": [ "health services and health monitoring*. health. health" ] }
First NDC
AGO
Disease surveillance and control
test
GCA_Sector
647
Which subsector forms part of global climate change adaptation subsector in Health Sector ?
Adapt Now subsector
Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5.
Health
Angola
{ "answer_start": [ 18 ], "text": [ "health services and health monitoring*. health. health" ] }
First NDC
AGO
Disease surveillance and control
train
GCA_subsector
648
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector (2)
Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5.
Health
Angola
{ "answer_start": [ 0, 18, 56 ], "text": [ "agriculture and food security", "health services and health monitoring*. health. health", "agriculture and food security" ] }
First NDC
AGO
Disease surveillance and control
train
GCA_Sector_2
649
Which subsector forms part of global climate change adaptation subsector in Health Sector ?
Adapt Now subsector (2)
Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5.
Health
Angola
{ "answer_start": [ 18 ], "text": [ "health services and health monitoring*. health. health" ] }
First NDC
AGO
Disease surveillance and control
val
GCA_Subsector_2
650
What are the Adaptation action/priority for the Agriculture Sector?
Action and priority
Agriculture and food security. 5,000,000. 13. Climate monitoring and data management system. Early warning system and disaster risk management. 17,500,000. 14. Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes.
Agriculture
Angola
{ "answer_start": [ 0, 14, 28 ], "text": [ "agriculture and food security", "system. early warning system", "study the implication of climate change on disease patterns for humans and livestock. agriculture and food security" ] }
First NDC
AGO
Livestock
train
Adaptation action/priority
651
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
5. Extend electricity grid to rural areas*. Energy. Electricity provision. 5,000,000. 6. Revise sectoral laws for proactive adaptation. 2,000,000. 7. Create an early warning system for flooding and storms. Early warning system and disaster risk management. Early warning system. 3,500,000. 8. National institutional mechanism for adaptation planning and mainstreaming. 2,000,000.
Agriculture
Angola
{ "answer_start": [ 32, 40, 48 ], "text": [ "early warning system", "early warning system", "early warning system" ] }
First NDC
AGO
Livestock
train
GCA_Sector
652
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ?
Adapt Now subsector
Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5.
Agriculture
Angola
{ "answer_start": [ 18 ], "text": [ "health services and health monitoring*. health. health" ] }
First NDC
AGO
Livestock
train
GCA_subsector
653
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector (2)
The expected results are: improved agricultural and livestock production, health and animal nutrition, soil and water management and management of early warning systems. Disaster risk management. Agriculture and food security. Total project cost (US $ million): 1.600 (1.180 for Angola) for the first year.
Agriculture
Angola
{ "answer_start": [ 23, 31 ], "text": [ "early warning systems", "agriculture and food security" ] }
First NDC
AGO
Livestock
train
GCA_Sector_2
654
What are the Adaptation action/priority for the Health Sector?
Action and priority
Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5.
Health
Angola
{ "answer_start": [ 14 ], "text": [ "ensure basic access to health services and health monitoring*. health. health" ] }
First NDC
AGO
Health services and assessment
train
Adaptation action/priority
655
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5.
Health
Angola
{ "answer_start": [ 18 ], "text": [ "health services and health monitoring*. health. health" ] }
First NDC
AGO
Health services and assessment
train
GCA_Sector
656
Which subsector forms part of global climate change adaptation subsector in Health Sector ?
Adapt Now subsector
Agriculture and food security. Land rehabilitation, Agriculture. 5,000,000. 3. Ensure basic access to health services and health monitoring*. Health. Health. 3,000,000. 4. Study the vulnerability of the fisheries sector to climate change and current modifications*. Coastal zones/Marine ecosystems. Fisheries, Agriculture and food security. 2,000,000. 5.
Health
Angola
{ "answer_start": [ 18, 41 ], "text": [ "health services and health monitoring*. health. health", "climate change" ] }
First NDC
AGO
Health services and assessment
test
GCA_subsector
657
What are the Adaptation action/priority for the LULUCF/Forestry Sector?
Action and priority
Total project cost (US $ million): 32.143. Implementing GEF agency: FAO. Promotion of Sustainable Charcoal in Angola through a Value Chain Approach. To reduce the current unsustainable and GHG-intensive biomass production and utilization from Angola's Miombo woodlands via an integrated suite of interventions in the country's charcoal value chain.
LULUCF/Forestry
Angola
{ "answer_start": [ 16, 56 ], "text": [ "promotion of sustainable charcoal in angola through a value chain approach", "charcoal value chain" ] }
First NDC
AGO
LULUCF/Forestry: General
train
Adaptation action/priority
658
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030. Presentation of conditional mitigation options.
LULUCF/Forestry
Angola
{ "answer_start": [ 12 ], "text": [ "forestry is primarily based" ] }
First NDC
AGO
LULUCF/Forestry: General
train
GCA_Sector
659
What are the Adaptation action/priority for the Energy Sector?
Action and priority
Total project cost (US $ million): 32.143. Implementing GEF agency: FAO. Promotion of Sustainable Charcoal in Angola through a Value Chain Approach. To reduce the current unsustainable and GHG-intensive biomass production and utilization from Angola's Miombo woodlands via an integrated suite of interventions in the country's charcoal value chain.
Energy
Angola
{ "answer_start": [ 16, 56 ], "text": [ "promotion of sustainable charcoal in angola through a value chain approach", "charcoal value chain" ] }
First NDC
AGO
Renewable energy
test
Adaptation action/priority
660
What are the Adaptation action/priority for the Water Sector?
Action and priority
Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. Improve knowledge of hydrology. Water resources. 2,000,000. 20. Extend water and sanitation network to rural areas. Water resources. Infrastructure. 10,000,000. 21. Explore industrial opportunities from climate change.
Water
Angola
{ "answer_start": [ 48 ], "text": [ "extend water and sanitation network to rural areas. water resources" ] }
First NDC
AGO
Water sanitation
train
Adaptation action/priority
661
Which subsector forms part of global climate change adaptation subsector in Water Sector ?
Adapt Now subsector
Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19.
Water
Angola
{ "answer_start": [ 11, 29 ], "text": [ "water resources. water", "water resources. water" ] }
First NDC
AGO
Water sanitation
train
GCA_subsector
662
What are the Adaptation action/priority for the Water Sector?
Action and priority
Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19.
Water
Angola
{ "answer_start": [ 11, 23, 52, 68 ], "text": [ "water resources. water", "implement water resources integrated management. water resources. water management. 3,000,000. 17", "implement water-harvesting system", "water resources" ] }
First NDC
AGO
Water management
train
Adaptation action/priority
663
Which subsector forms part of global climate change adaptation subsector in Water Sector ?
Adapt Now subsector
Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19.
Water
Angola
{ "answer_start": [ 11, 29 ], "text": [ "water resources. water", "water resources. water" ] }
First NDC
AGO
Water management
train
GCA_subsector
664
What are the Adaptation action/priority for the Water Sector?
Action and priority
Study the implication of climate change on disease patterns for humans and livestock. Agriculture and food security. Health. 1,500,000. 15. Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17.
Water
Angola
{ "answer_start": [ 25, 49 ], "text": [ "increase water availability through village-level wells and boreholes. water resources. water availability", "water resources integrated management. water resources. water" ] }
First NDC
AGO
Water supply
test
Adaptation action/priority
665
Which subsector forms part of global climate change adaptation subsector in Water Sector ?
Adapt Now subsector
Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Energy and Water Sector Action Plan 2013-2017. A characterisation of the two sub-sectors, including infrastructure and the institutional component, which result in commonalities, e.g.
Water
Angola
{ "answer_start": [ 6, 13 ], "text": [ "energy and water", "renewable energy. energy and water" ] }
First NDC
AGO
Water supply
train
GCA_subsector
666
What are the Adaptation action/priority for the Water Sector?
Action and priority
Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19. Improve knowledge of hydrology. Water resources. 2,000,000. 20. Extend water and sanitation network to rural areas. Water resources. Infrastructure. 10,000,000. 21. Explore industrial opportunities from climate change.
Water
Angola
{ "answer_start": [ 36, 57 ], "text": [ "improve knowledge of hydrology. water resources", "water resources" ] }
First NDC
AGO
Water: General
train
Adaptation action/priority
667
What are the Adaptation action/priority for the Water Sector?
Action and priority
Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19.
Water
Angola
{ "answer_start": [ 11, 24, 68 ], "text": [ "water resources. water", "water resources integrated management. water resources. water", "water resources" ] }
First NDC
AGO
Water: General
train
Adaptation action/priority
668
Which subsector forms part of global climate change adaptation subsector in Water Sector ?
Adapt Now subsector
Increase water availability through village-level wells and boreholes. Water resources. Water availability and distribution. 5,000,000. 16. Implement water resources integrated management. Water resources. Water management. 3,000,000. 17. Map areas of erosion risk. Terrestrial ecosystems. 1,000,000. 18. Implement water-harvesting system in drought-prone areas. Agriculture and food security. Water resources. 3,000,000. 19.
Water
Angola
{ "answer_start": [ 11, 29 ], "text": [ "water resources. water", "water resources. water" ] }
First NDC
AGO
Water: General
train
GCA_subsector
669
What are the Adaptation action/priority for the Water Sector?
Action and priority
20. Extend water and sanitation network to rural areas. Water resources. Infrastructure. 10,000,000. 21. Explore industrial opportunities from climate change. 1,000,000. 22. Monitor groundwater. Water resources. 3,000,000. 23. Construct flood protection barriers along major rivers. Water resources. Disaster risk management. 5,000,000. 24.
Water
Angola
{ "answer_start": [ 41 ], "text": [ "construct flood protection barriers along major rivers. water resources" ] }
First NDC
AGO
Water: General
train
Adaptation action/priority
670
Which subsector forms part of global climate change adaptation subsector in Water Sector ?
Adapt Now subsector
Implementing Angolan Ministry: Ministry of Energy and Water. National Directorate of Renewable Energy. Energy and Water Sector Action Plan 2013-2017. A characterisation of the two sub-sectors, including infrastructure and the institutional component, which result in commonalities, e.g.
Water
Angola
{ "answer_start": [ 6, 13 ], "text": [ "energy and water", "renewable energy. energy and water sector action plan" ] }
First NDC
AGO
Water: General
train
GCA_subsector
671
What is the conditional part of mitigation target provided for the Agriculture Sector ?
Conditional part of mitigation target
Sectors. Description. Promotion of renewable energy. Even though Angola is an oil-producing country, the potential for renewable energy is significant. With the growing energy demand in Angola, this type of project is seen as priority in the Angolan energy sector strategy.
Agriculture
Angola
{ "answer_start": [ 46 ], "text": [ "energy sector" ] }
First NDC
AGO
Agriculture: General
train
Conditional part of mitigation target for a given sectoral plan
672
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ?
Conditional part of mitigation target
681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD.
Energy
Angola
{ "answer_start": [ 1 ], "text": [ "mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects, and. 6,732 mw hydroelectric projects" ] }
First NDC
AGO
Renewable Energy
train
Conditional part of mitigation target for a given sectoral downstream actions
673
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions?
Downstream actions
681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD.
Energy
Angola
{ "answer_start": [ 1 ], "text": [ "mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects, and. 6,732 mw hydroelectric projects" ] }
First NDC
AGO
Renewable Energy
train
Sectoral downstream actions to be undertaken as part of the NDC contribution
674
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ?
Conditional part of mitigation target
681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD.
Energy
Angola
{ "answer_start": [ 1, 24 ], "text": [ "mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects", "mw hydroelectric projects" ] }
First NDC
AGO
Renewable Energy: Biofuels
train
Conditional part of mitigation target for a given sectoral downstream actions
675
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions?
Downstream actions
681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD.
Energy
Angola
{ "answer_start": [ 1, 24 ], "text": [ "mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects", "mw hydroelectric projects" ] }
First NDC
AGO
Renewable Energy: Biofuels
train
Sectoral downstream actions to be undertaken as part of the NDC contribution
676
What is the conditional part of mitigation target provided for the Energy Sector ?
Conditional part of mitigation target
The demand for wood for charcoal is, therefore, also a significant driver of forest degradation and, subsequently, the release of GHG emissions. Biomass consumption (wood-energy and agricultural residues) remains the main source of domestic energy, and energy in small-scale commercial sectors. This intense cutting of trees to produce and supply charcoal to the urban and periurban areas is putting an extreme pressure on the local resources.
Energy
Angola
{ "answer_start": [ 43 ], "text": [ "energy, and energy" ] }
First NDC
AGO
Renewable Energy: Biofuels
train
Conditional part of mitigation target for a given sectoral plan
677
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ?
Conditional part of mitigation target
681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD.
Energy
Angola
{ "answer_start": [ 1 ], "text": [ "mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects, and. 6,732 mw hydroelectric projects" ] }
First NDC
AGO
Renewable Energy: Hydro
train
Conditional part of mitigation target for a given sectoral downstream actions
678
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions?
Downstream actions
Cambambe Hydroelectric Second Power Plant:The Cambambe project activity is located on the Municipality of Cambambe, 180 km east of Luanda, the National Capital. The proposed project comprises a capacity addition to the existing Cambambe Hydroelectric Power Plant with installation of additional 700 MW of the actual generation capacity.
Energy
Angola
{ "answer_start": [ 0, 38 ], "text": [ "cambambe hydroelectric second power plant:the cambambe project", "cambambe hydroelectric power plant" ] }
First NDC
AGO
Renewable Energy: Hydro
train
Sectoral downstream actions to be undertaken as part of the NDC contribution
679
What is the unconditional part of mitigation target provided for downstream actions in the Energy Sector ?
Unconditional part of mitigation target
Cambambe Hydroelectric Second Power Plant:The Cambambe project activity is located on the Municipality of Cambambe, 180 km east of Luanda, the National Capital. The proposed project comprises a capacity addition to the existing Cambambe Hydroelectric Power Plant with installation of additional 700 MW of the actual generation capacity.
Energy
Angola
{ "answer_start": [ 0, 38 ], "text": [ "cambambe hydroelectric second power plant:the cambambe", "cambambe hydroelectric power plant" ] }
First NDC
AGO
Renewable Energy: Hydro
train
Unconditional part of mitigation target for a given sectoral downstream action
680
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ?
Conditional part of mitigation target
681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD.
Energy
Angola
{ "answer_start": [ 1, 24 ], "text": [ "mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects", "mw hydroelectric projects" ] }
First NDC
AGO
Renewable Energy: Solar
train
Conditional part of mitigation target for a given sectoral downstream actions
681
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions?
Downstream actions
681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD.
Energy
Angola
{ "answer_start": [ 1, 24 ], "text": [ "mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects", "mw hydroelectric projects" ] }
First NDC
AGO
Renewable Energy: Solar
train
Sectoral downstream actions to be undertaken as part of the NDC contribution
682
What is the conditional part of mitigation target provided for downstream actions in the Energy Sector ?
Conditional part of mitigation target
681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD.
Energy
Angola
{ "answer_start": [ 0, 24 ], "text": [ "681 mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects", "mw hydroelectric projects" ] }
First NDC
AGO
Renewable Energy: Wind
train
Conditional part of mitigation target for a given sectoral downstream actions
683
What are the downstream actions that are incorporated in the Energy Sector as part of Nationally Determined Contributions?
Downstream actions
681 MW for wind energy projects,. 438 MW for solar projects,. 640 MW for biomass projects, and. 6,732 MW hydroelectric projects. With an investment of 11,346 million USD.
Energy
Angola
{ "answer_start": [ 0, 24 ], "text": [ "681 mw for wind energy projects,. 438 mw for solar projects,. 640 mw for biomass projects", "mw hydroelectric projects" ] }
First NDC
AGO
Renewable Energy: Wind
train
Sectoral downstream actions to be undertaken as part of the NDC contribution
684
What is the unconditional part of mitigation target provided for downstream actions in the Energy Sector ?
Unconditional part of mitigation target
In the absence of project activity, fossil fuels burned in power plants that are connected to the grid. An ex ante estimative of annual emission reductions is 3,282,000tCO2e per year. Tombwa Wind Farm. The Tombwa project activity is located on the Municipality of Tombwa, Namibe Province, 1,234 km east of Luanda, the National Capital.
Energy
Angola
{ "answer_start": [ 33 ], "text": [ "tombwa wind farm. the tombwa" ] }
First NDC
AGO
Renewable Energy: Wind
train
Unconditional part of mitigation target for a given sectoral downstream action
685
What is the unconditional part of mitigation target provided for plans and strategies in the Industries Sector ?
Unconditional part of mitigation target
Sectors. Description. Promotion of renewable energy. Even though Angola is an oil-producing country, the potential for renewable energy is significant. With the growing energy demand in Angola, this type of project is seen as priority in the Angolan energy sector strategy.
Industries
Angola
{ "answer_start": [ 46 ], "text": [ "energy sector" ] }
First NDC
AGO
Industries: General
train
Unconditional part of mitigation target for a given sectoral plan
686
What is the conditional part of mitigation target provided for the LULUCF/Forestry Sector ?
Conditional part of mitigation target
Sectors. Description. Promotion of renewable energy. Even though Angola is an oil-producing country, the potential for renewable energy is significant. With the growing energy demand in Angola, this type of project is seen as priority in the Angolan energy sector strategy.
LULUCF/Forestry
Angola
{ "answer_start": [ 46 ], "text": [ "energy sector" ] }
First NDC
AGO
Afforestation
train
Conditional part of mitigation target for a given sectoral plan
687
What adaptation/mitigation/net-zero targets/objectives are provided for the LULUCF/Forestry Sector ?
Sectoral targets on
The potential for wood cutting each year is estimated at 333,000 m3 and the current rate of cutting is estimated to be 85,000 m3 per year. The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030.
LULUCF/Forestry
Angola
{ "answer_start": [ 81, 95 ], "text": [ "increase carbon sequestration from the forestry sector to 5", "year by 2030" ] }
First NDC
AGO
LULUCF/Forestry: General
train
Targets at the sectoral level
688
What is the unconditional part of mitigation target/efforts provided for the LULUCF/Forestry Sectoral targets?
Unconditional part of mitigation target
The potential for wood cutting each year is estimated at 333,000 m3 and the current rate of cutting is estimated to be 85,000 m3 per year. The calculation of CO2 emissions and removals from land use changes and forestry is primarily based on the following main activities:- Forestry conversion;- Use of biomass;- Phase-out of harvested land.The sector is thought to have captured close to 3 million tons of CO2e in 2005, and the country is committed to increase carbon sequestration from the forestry sector to 5 million tons of CO2e per year by 2030.
LULUCF/Forestry
Angola
{ "answer_start": [ 81, 95 ], "text": [ "increase carbon sequestration from the forestry sector to 5", "year by 2030" ] }
First NDC
AGO
LULUCF/Forestry: General
val
Unconditional part of the mitigation effort for a given sectoral target
689
What is the conditional part of mitigation target provided for the LULUCF/Forestry Sector ?
Conditional part of mitigation target
Strategic Plan of Disaster Risk Management (2011);. National Action Programme to fight Desertification (2014);. and, above all, the Strategy of Long-term Development for Angola (2025). Many of the actions envisaged in these plans and strategies, particularly in the energy sector, are linked to both adaptation and mitigation.
LULUCF/Forestry
Angola
{ "answer_start": [ 1 ], "text": [ "plan of disaster risk management" ] }
First NDC
AGO
Reforestation
train
Conditional part of mitigation target for a given sectoral plan
690
What are the Adaptation action/priority for the Agriculture Sector?
Action and priority
Conduct studies on the impact of climate change on fishing productivity and coastal economies. Acidification of the sea and fresh water;. Rising water temperature and increased salinization. 17,70. Develop community and school gardens. Increased frequency and intensity of heat waves / heat island effect. 5,00.
Agriculture
Angola
{ "answer_start": [ 33 ], "text": [ "develop community and school gardens" ] }
Revised First NDC
AGO
Agriculture: General
train
Adaptation action/priority
691
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture.
Agriculture
Angola
{ "answer_start": [ 56 ], "text": [ "food security, improve nutrition and promote sustainable agriculture" ] }
Revised First NDC
AGO
Agriculture: General
train
GCA_Sector
692
Which subsector forms part of global climate change adaptation subsector in Agriculture Sector ?
Adapt Now subsector
The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture.
Agriculture
Angola
{ "answer_start": [ 56 ], "text": [ "food security, improve" ] }
Revised First NDC
AGO
Agriculture: General
train
GCA_subsector
693
What are the Adaptation action/priority for the Education Sector?
Action and priority
Conduct studies on the impact of climate change on fishing productivity and coastal economies. Acidification of the sea and fresh water;. Rising water temperature and increased salinization. 17,70. Develop community and school gardens. Increased frequency and intensity of heat waves / heat island effect. 5,00.
Education
Angola
{ "answer_start": [ 33 ], "text": [ "develop community and school gardens" ] }
Revised First NDC
AGO
Education: General
train
Adaptation action/priority
694
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture. Financing sources. Tax revenue associated with the import of agricultural products; State budget.
Education
Angola
{ "answer_start": [ 31 ], "text": [ "food security, improve nutrition" ] }
Revised First NDC
AGO
Education: General
test
GCA_Sector
695
Which subsector forms part of global climate change adaptation subsector in Education Sector ?
Adapt Now subsector (2)
Besides that, there are other two thematic areas where the government intends to act, which are institutional and climate change education in schools and university, as education is an essential component and a facilitator for responding to global climate change. Angola’s goals related to capacity building training and education are presented in the table below. Table 17 – Capacity building actions.
Education
Angola
{ "answer_start": [ 49 ], "text": [ "capacity building training and education" ] }
Revised First NDC
AGO
Education: General
train
GCA_Subsector_2
696
What are the Adaptation action/priority for the Agriculture Sector?
Action and priority
Conduct a study on the impact of changing the geographical distribution of animal diseases (infectious and parasitic) and the availability of water on the country's animal production levels. Health risks and disease transmission. 7,50.
Agriculture
Angola
{ "answer_start": [ 0 ], "text": [ "conduct a study on the impact of changing the geographical distribution of animal diseases (infectious and parasitic) and the availability of water on the country's animal production levels" ] }
Revised First NDC
AGO
Agriculture: General
val
Adaptation action/priority
697
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
The fund is intended to be an instrument to boost agriculture, one of the priority sectors for the diversification of the national economy. The Government intends to develop the sector by promoting the local, regional and national economy and being a driving force for compliance with SDG 2: Eradicate hunger, achieve food security, improve nutrition and promote sustainable agriculture.
Agriculture
Angola
{ "answer_start": [ 56 ], "text": [ "food security, improve nutrition and promote sustainable agriculture" ] }
Revised First NDC
AGO
Agriculture: General
test
GCA_Sector
698
What are the Adaptation action/priority for the Cross-Cutting Area Sector?
Action and priority
Conduct a study on the impact of changing the geographical distribution of animal diseases (infectious and parasitic) and the availability of water on the country's animal production levels. Health risks and disease transmission. 7,50.
Cross-Cutting Area
Angola
{ "answer_start": [ 0 ], "text": [ "conduct a study on the impact of changing the geographical distribution of animal diseases (infectious and parasitic) and the availability of water on the country's animal production levels" ] }
Revised First NDC
AGO
Capacity building and knowledge transfer
train
Adaptation action/priority
699