prompts
stringlengths 33
194
⌀ | response
stringlengths 36
218
⌀ |
---|---|
write objective of portable fire extingusiher | Provide procedure for operation and maintenance of portable fire extinguishers. |
write objective of air handling unit | Describe a procedure for the operation of air handling units. |
write objective of sterilizing grade filter. | Lay down a procedure for bubble point test of sterilizing grade filter. |
write objective of effluent treatment plant. | Provide guidelines for the operation of the effluent treatment plant. |
write objective of breakdown of utilities services & equipment in manufacturing & packing department during working. | Lay down the procedure for the intimation of the breakdown of utilities services & equipment in manufacturing & packing department during working. |
write objective of preparation of Sodium Hypochlorite solution, Sodium Meta Bi Sulphite solution (SMBS), Brine solution and Sodium Hydroxide (NaOH) solution for purified water. | Lay down the procedure for providing a written procedure for preparation of Sodium Hypochlorite solution, Sodium Meta Bi Sulphite solution (SMBS), Brine solution and Sodium Hydroxide (NaOH) solution for purified water. |
write objective of passivation of purified water storage tank and distribution piping. | Lay down the procedure for the passivation of purified water storage tank and distribution piping. |
write objective of cleaning of the insecticutor | Lay down the procedure for cleaning of the insecticutor. |
write objective of procedure for inspection of pressure vessels, lifts and chain pulley blocks. | Lay down the procedure for inspection of pressure vessels, lifts and chain pulley blocks. |
write objective of e procedure for maintaining and up-keeping the facility. | Lay down the procedure for maintaining and up-keeping the facility. |
write objective of procedure for operation of the domestic hot water system. | Lay down the procedure for operation of the domestic hot water system. |
write objective of the procedure for testing of earth pits | Lay down the procedure for testing of earth pits. |
write objective of procedure for temperature mapping. | Lay down the procedure for temperature mapping. |
write objective of procedure for carrying out airborne particle count in the static condition. | Lay down the procedure for carrying out airborne particle count in the static condition. |
write objective of procedure for measurement of air velocity and calculation of air changes per hour for classified areas. | Lay down the procedure for measurement of air velocity and calculation of air changes per hour for classified areas. |
write objective of procedure for operation of the lux meter and monitoring the lux level. | Lay down the procedure for operation of the lux meter and monitoring the lux level. |
write objective of procedure for operation and maintenance of low tension (LT) panels. | Lay down the procedure for operation and maintenance of low tension (LT) panels. |
write objective of procedure for operation of high tension (H.T.) panel. | Lay down the procedure for operation of high tension (H.T.) panel. |
write objective of the procedure for operation of forced draft ventilation (FDV) & forced exhaust (FE) unit. | Lay down the procedure for operation of forced draft ventilation (FDV) & forced exhaust (FE) unit. |
write objective of the procedure for operation of axial flow fan units (supply and return). | Lay down the procedure for operation of axial flow fan units (supply and return). |
write objective of procedure for the chemical sanitization of pretreatment section of purified water generation system. | Lay down the procedure for the chemical sanitization of pretreatment section of purified water generation system. |
write objective of procedure for operation after M.S.E.B. power resumption. | Lay down the procedure for operation after M.S.E.B. power resumption. |
write objective of r operation after M.S.E.B. power failure. | Lay down the procedure for operation after M.S.E.B. power failure. |
write objective of procedure for electrical safety | Lay down the procedure for electrical safety. |
write objective of for safe unloading of chemicals, furnace oil and high-speed diesel from the vehicle inside the factory premises | Lay down the procedure for safe unloading of chemicals, furnace oil and high-speed diesel from the vehicle inside the factory premises. |
write objective of for preventing accidents and fire caused by improper handling of welding and gas cutting machine to nearby areas containing flammable or combustible vapors/ liquids or dusts. | Lay down the procedure for preventing accidents and fire caused by improper handling of welding and gas cutting machine to nearby areas containing flammable or combustible vapors/ liquids or dusts. |
write objective of for vessels operated greater than atmospheric pressure. | Lay down the procedure for vessels operated greater than atmospheric pressure. |
write objective of procedure for unloading storage, handling and use of compressed gas cylinders. | Lay down the procedure for unloading storage, handling and use of compressed gas cylinders. |
write objective of operation of air dryers. | Lay down the procedure for operation of air dryers. |
write objective of cleaning installation, operational and performance qualification of equipment/ instruments. | Lay down the procedure for cleaning installation, operational and performance qualification of equipment/ instruments. |
write objective of procedure for performing area qualification of the facility. | Lay down the procedure for performing area qualification of the facility. |
write objective of procedure for cleaning of Lighting and Fixtures. | Lay down the procedure for cleaning of Lighting and Fixtures. |
write objective of e procedure for safe and effective operations of the Air Compressors. | Lay down the procedure for safe and effective operations of the Air Compressors. |
write objective of procedure for raising work permit. | Lay down the procedure for raising work permit. |
write objective of e procedure for actions to be taken in case of out of acceptance limit for critical parameters in the purified water system. | Lay down the procedure for actions to be taken in case of out of acceptance limit for critical parameters in the purified water system. |
write objective of procedure for Preventive Maintenance. | Lay down the procedure for Preventive Maintenance. |
write objective of procedure for monitoring power consumption. | Lay down the procedure for monitoring power consumption. |
write objective of procedure for DOP testing (Integrity Testing) of HEPA filter. | Lay down the procedure for DOP testing (Integrity Testing) of HEPA filter. |
write objective of procedure for diesel generator set (DG). | Lay down the procedure for diesel generator set (DG). |
write objective of procedure for cleaning of cooling towers. | Lay down the procedure for cleaning of cooling towers. |
write objective of r cleaning of the chilled water system. | Lay down the procedure for cleaning of the chilled water system. |
write objective of for breakdown maintenance. | Lay down the procedure for breakdown maintenance. |
write objective of r sanitization of purified water generation system using hot water. | Lay down the procedure for sanitization of purified water generation system using hot water. |
write objective of for Chillers. | Lay down the procedure for Chillers. |
write objective of inspection/cleaning of filters AHU system. | Lay down the procedure for inspection/cleaning of filters AHU system. |
write objective of cleaning and maintenance of boilers. | Lay down the procedure for cleaning and maintenance of boilers. |
write objective of operation of boilers. | Lay down the procedure for operation of boilers. |
null | null |
null | null |